Harman Patil (Editor)

Interstate 64 in Missouri

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Existed:
  
1956 – present

Constructed
  
1956

Length
  
65.3 km

Interstate 64 in Missouri

West end:
  
I-70 / US 40 / US 61 in Wentzville

East end:
  
I-55 / I-64 / US 40 in St. Louis

Highway system
  
US Interstate highway system

Major cities
  
St. Louis, Chesterfield, East St. Louis, Wentzville

Counties
  
St. Charles County, Missouri, St. Louis County, Missouri, St. Louis

Interstate 64 (I-64) passes through in the St. Louis area in the U.S. state of Missouri. The entire route overlaps U.S. Route 40 (US 40). Because the road was a main thoroughfare in the St. Louis area before the development of the Interstate Highway System, it is not uncommon for locals to refer to the stretch of highway as "Highway 40" rather than "I-64". On December 6, 2009, the portion of the highway running through the city of St. Louis was named the Jack Buck Memorial Highway in honor of the late sportscaster.

Contents

Route description

I-64 begins at an interchange with Interstate 70, U.S. Routes 40 and 61 in St. Charles County and heads south. Previously, the freeway was a divided highway signed only as U.S. 40 with at-grade intersections, which were slowly converted to limited-access exits. The final intersection at Callahan Road was removed on October 14, 2009. The next major exit is for Route N and the western terminus of Missouri Route 364. Route 364 was completed and opened on November 2, 2014. From here, I-64 continues past interchanges with Winghaven Boulevard / Route DD, Route 94 and Research Park Circle, and then crosses the Missouri River via the Daniel Boone Bridge and enters St. Louis County.

The freeway travels through the congested Chesterfield Valley, where it gains a fourth lane and then meets Interstate 270 at a flyover interchange built in the early 1990s in the city of Town and Country. Continuing east, I-64 remains four lanes and travels through the affluent areas of Frontenac and Ladue. The next major interchange is Interstate 170 in the city of Richmond Heights. This stretch, located between Ballas Road and I-170, was closed in 2008 for a complete reconstruction, at which point substandard exits were upgraded and the fourth lane was added. The interchange with I-170 was also overhauled, creating a full interchange with high speed ramps in all directions. The reconstructed expressway opened to traffic on the morning of December 15, 2008.

East of the interchange with I-170, I-64 drops a lane and stays at three through lanes to Clayton Road. Through here, the expressway passes through older neighborhoods and enters into the city of St. Louis. After re-adding a fourth lane, the freeway skirts the southern edge of Forest Park. In this area, one finds both the St. Louis Science Center and St. Louis Zoo. Kingshighway marks the end of the completely reconstructed eastern half, where again outdated exits were updated and shoulders widened. The eastern half was closed from December 15, 2008 to December 7, 2009. I-64's speed limit drops from 60 to 55 miles per hour east of Kingshighway and drops a lane at Vandeventer Avenue (the opposite of the westbound lanes). Passing by St. Louis University, the freeway becomes double-decked for the first time (eastbound lanes at a lower level, westbound lanes an upper one), gaining back a fourth lane east of Compton Avenue. Another lane drop occurs at the Chestnut and 20th Street exit, where the cancelled Missouri Route 755 was to interchange. The freeway passes just south of the Scottrade Center and again becomes double-decked in the same arrangement, passing within 50 feet of the New Busch Stadium. The route becomes two lanes as it approaches the Mississippi River and the Poplar Street Bridge, where it is intersects Interstates 55 and 44 at an incomplete interchange. Eastbound I-64 cannot directly access either one of the other routes but westbound I-64, however, can directly access both. I-64 continues into Illinois concurrent with I-55.

Initial construction

Before the interstate highway system, US 40 was a main thoroughfare through St. Louis and Kansas City. From each state line, there were signs saying "Future I-55/I-64 Corridor" and "Future I-70 Corridor".

Reconstruction

The Missouri Department of Transportation rebuilt the stretch of I-64 from Spoede Road to Kingshighway Boulevard between 2008 and 2009. The project included new concrete pavement on the highway; approximately 25 rebuilt bridges; and several reconfigured interchanges, including a new freeway-to-freeway interchange at Interstate 170.

The section between Spoede Road and I-170 was closed for reconstruction on January 2, 2008 and opened to traffic on December 15, 2008. The section between I-170 and Kingshighway Boulevard was closed on December 15, 2008 and reopened to traffic on December 7, 2009. The project was completed with a dedication and opening day ceremony on Sunday, December 6.

Exit list

Former US 250;

References

Interstate 64 in Missouri Wikipedia