Crosses
  
Missouri River

Phone
  
+1 314-340-4100

Daily traffic
  
88,317 (2008)

Cross
  
Missouri River

Daniel Boone Bridge

Carries
  
8 lanes of I-64 / US 40 / US 61

Maintained by
  
Missouri Department of Transportation

Design
  
Continuous truss bridge (westbound span) Deck girder bridge (eastbound span)

Opened
  
1935 (original span) 1989 (westbound span) 2015 (eastbound span)

Address
  
I-64, Chesterfield, MO 63017, USA

Locale
  
St. Louis County, Missouri

Similar
  
Missouri Departme, Creve Coeur Park Picnic Sit, Poplar Street Bridge, Sky Zone Trampoline Park ‑ St, Missouri State Highway

I 64 daniel boone bridge missouri river interstate 64 st louis


The Daniel Boone Bridge is the name for two bridges carrying Interstate 64, U.S. Route 40 and U.S. Route 61 across the Missouri River between St. Louis County and St. Charles County, Missouri. The older bridge, which carries westbound traffic is a continuous truss bridge, while the newer bridge, which carries eastbound traffic is a deck girder bridge.

Contents

Daniel boone bridge demolished


1935 bridge

The original bridge was opened in June 1935. Initially serving both directions of travel (one in each direction) it was restriped for three lanes total, with the middle lane being a signal-controlled reversible lane. Following the opening of a parallel span in 1989, the bridge was rehabilitated, then converted to serve two lanes of westbound traffic while the new bridge served eastbound traffic. In 2001, MoDOT again striped the bridge back to three lanes to add an extra westbound lane. As the AADT rapidly increased, there came to be an increasing need for a wider bridge with standard-width lanes and shoulders, both of which the original bridge lacked. Furthermore, the aging structure had reached the point in life where regular maintenance was required, which not only was a money drain to the state, but was also an inconvenience to drivers, due to the lane closures needed to safely make the repairs. As a result, MODOT started planning for a new replacement in the early 2000s. Construction started in the spring of 2013, it opened to eastbound traffic on June 28, 2015. Traffic across the old bridge ceased on November 5, 2015 after the former eastbound span opened to westbound traffic. Although the bridge was eligible for the NRHP list, it was demolished in March 2016

1989 bridge

MoDOT opened an additional bridge upstream of the original span, as a result of increased congestion. The bridge was initially built for two eastbound lanes, however the shoulders were converted to travel lanes in 2001, for a total of four lanes. The bridge closed on June 28, 2015 to be rehabilitated. The work was completed on November 5, 2015, on which day the bridge opened to westbound traffic.

2015 bridge

As a result of the narrow lanes and constant problems with the aging westbound structure, MODOT started studies for a new replacement around 2001 or 2002. Funding was finally unveiled in 2011, and in November, 2012 a design-build contract was awarded to the Walsh-Alberici joint venture team with designer Burns & McDonnell. Construction started in 2013 on a girder bridge, located upstream of the two existing bridges. All four eastbound lanes were routed onto the new bridge on June 28, 2015. The new bridge also features a bike/pedestrian attachment, which connects the Katy Trail to the Monarch Levee Trail.

References