Native name
  
मुंबई मेट्रो

Transit type
  
Rapid transit

Annual ridership
  
100 million

Mumbai Metro Mumbai Metro IV project likely to be funded by World Bank Latest

Locale
  
Mumbai, Maharashtra, India

Number of lines
  
1 (operational) 2(planned) 3(under construction)

Number of stations
  
12 (operational) 58 (under construction) 82(approved)

Daily ridership
  
355,000 (February 2017)

Owner
  
Mumbai Metropolitan Region Development Authority (MMRDA)

Mumbai metro rail network project future of mumbai


Mumbai Metro is a rapid transit system serving the city of Mumbai, Maharashtra. The system is designed to reduce traffic congestion in the city, and supplement the overcrowded Mumbai Suburban Railway network. It is being built in three phases over a 15-year period, with overall completion expected in 2021. When completed, the core system will comprise seven high-capacity metro railway lines, spanning a total of 174 kilometres (108 mi).

Contents

Mumbai Metro Mumbai Metro lifeline for real estate

Line 1 of the Mumbai Metro is operated by Metro One Operation Private Limited (MOOPL), a joint venture company formed by RATP Développement, Transdev and Reliance Infrastructure. While the under-construction lines 2, 4 and 7 will be operated by MMRDA and the underground line 3 also under-construction will be operated by Mumbai Metro Rail Cooperation Limited.

Mumbai Metro 927 Big FM runs with Mumbai Metro to keep Mumbaikars fully updated

In June 2006, then-Prime Minister of India Manmohan Singh laid the foundation stone for the first phase of the Mumbai Metro project. Construction work began in February 2008. A successful trial run was conducted in May 2013, and the system's first line entered into operation on 8 June 2014.

Mumbai Metro Top Mumbai Metro officers get paid more than their boss RTI

Mumbai metro 3 a journey towards better tomorrow


History

Mumbai Metro httpsuploadwikimediaorgwikipediacommonsthu

Mumbai is the capital of Maharashtra, one of the most economically developed states of India. It is among the largest cities in the world, with a total metropolitan area population of over 20 million as of 2011, and a population growth rate of around 2% per annum. Mumbai has the advantage of a high modal share of the public (88%) in favour of a public mass transport system. The existing Mumbai Suburban Railway carries over 7 million passengers per day, and is supplemented by the Brihanmumbai Electric Supply and Transport (BEST) bus system, which provides feeder services to station-going passengers to allow them to complete their journeys. Until 1980s, transport in Bombay was not a big problem. The discontinuation of trams resulted in the pressure directly on suburban railway network. By 2010 the population of Bombay doubled. However, due to the city's geographical constraints and rapid population growth, road and rail infrastructure development has not been able to keep pace with growing demand over the last 4-5 decades. Moreover, the Mumbai Suburban Railway, though extensive, is not built to rapid transit specifications. The main objective of the Mumbai Metro is to provide mass rapid transit services to people within an approach distance of between 1 and 2 kilometres, and to serve the areas not connected by the existing Suburban Rail network.

Mumbai Metro Mumbai Metro Wikipedia

The Government of Maharashtra through the MMRDA, in order to improve the traffic and transportation scenario in Mumbai and to cater to the future travel needs in the next 2-3 decades began exploring the viability of various alternative mass transit systems which are efficient, economically viable and environment friendly. In this context, a detailed feasibility study was carried out under Indo-German technical co-operation by entrusting the consultancy work to TEWET in association with DE-Consult and TCS, during 1997–2000. The study recommended a mass transit corridor from Andheri to Ghatkopar as potentially bankable and economically viable, after examining a number of alternative corridors and alignments. This study was updated by MMRDA in May 2004. Meanwhil ation (DMRC) prepared the master plan for Mumbai metro, wherein they recommended extending the Andheri-Ghatkopar section to Versova as part of the master plan and identified it as a priority corridor for implementation. The State Government declared the project as a "public vital infrastructure project" and designated the MMRDA as the Project Implementation Agency (PIA). The master plan unveiled by the MMRDA in 2004 encompassed a total of 146.5 kilometres (91.0 mi) of track, of which 32 kilometres (20 mi) would be underground. The Mumbai Metro was proposed to be built in three phases, at an estimated cost of 19,525 crore. In September 2009, the proposed Hutatma Chowk – Ghatkopar was reduced to a line between Hutatma Chowk and Carnac Bunder.

Mumbai Metro Mumbai Metro Wikipedia

In 2011, the MMRDA unveiled plans for an extended Colaba-Bandra-SEEPZ metro line. According to its earlier plans, a 20-km Colaba-to-Bandra metro line was to be constructed, running underground for 10 kilometres (6.2 mi) from Colaba to Mahalaxmi, and then on an elevated track from Mahalaxmi to Bandra. However, the MMRDA decided to increase ridership on the line by running it out past Bandra to Chatrapati Shivaji International Airport. The 33.5-kilometre (20.8 mi) Colaba-Bandra-SEEPZ line will be built at a cost of 21,000 crore (US$3.1 billion), and will be the city's first underground metro line. It will have 27 stations.

On 27 February 2012, the Union Government gave in-principle approval to the plan for Line 3. Money for the project is being borrowed from Japanese International Cooperation Agency (50%), the state government (16%), the central government (14%), and others. In April 2012, the MMRDA announced plans to grant the Mumbai Metro Rail Company increased management autonomy, in an effort to enhance the project's operational efficiency. In July 2012, the MMRDA announced plans to add more metro lines to its existing plan, including a line parallel to the Western Express Highway from Bandra to Dahisar. This line is expected to reduce the passenger load on the Western Line and vehicle traffic on the highway. Another proposed route, the 30-kilometre (19 mi), 28-station Wadala–Kasarvadvali line, received in-principle approval from the state government in 2013. The MMRDA also intends to convert the proposed Lokhandwala–SEEPZ–Kanjurmarg monorail route into a metro line.

The Mumbai Metro master plan was revised by the MMRDA in 2012, increasing the total length of the proposed network to 160.90 km. In June 2015, two new lines were proposed. A line from Andheri West to Dahisar West, and a line from BKC to Mankhurd. The following table shows the updated master plan unveiled by the MMRDA:

On 18 February 2013, the MMRDA signed a memorandum of understanding with Transport for London, the transit authority in Greater London. The arrangement will facilitate the exchange of information, personnel and technology in the transportation sector.

The revised Mumbai Metro master plan had proposed a line along the Thane-Teen Haath Naka-Kaapurbavdi-Ghodbunder Road route. The feasibility report concluded that the line was not feasible as most residents of Thane and its neighbouring areas travelled to Mumbai for work daily. On 14 June 2014, Chavan announced that the MMRDA was instead examining a proposal for a metro line along the new proposed route of Wadala-Ghatkopar-Teen Haat Naka route. RITES will prepare the detailed project report and is expected to submit it by August 2014. The preliminary report proposed a 32 km line with 29 stations, to be built at an estimated cost of 22,000 crore. This would be the fourth line of the metro, after the previously proposed Charkop-Dahisar route was merged with the Charkop-Bandra-Mankhurd route to form Line 2.

Following the opening of Line 1, MMRDA metropolitan commissioner UPS Madan stated that the authority would focus on constructing the Colaba-Bandra-SEEPZ, Dahisar-Bandra-Mankhurd, and Wadala-Thane-Kasarvadavali lines. He also stated that the other proposed lines had not been cancelled and that they may be implemented in the future. In May 2015, the MMRDA stated that it had begun planning for the Andheri-Dahisar line and Seepz-Kanjurmarg. Both lines are expected to be elevated, although the latter could be constructed underground if a proposal to extend Line 3 to Kanjurmarg is undertaken. DPRs for both lines had been prepared in 2004, along with the master plan, and the MMRDA would now update the DPRs. The agency also intends to construct Line 9 of the metro as an underground corridor from Sewri to Worli. However, planning for the project will only begun after the construction of the proposed Mumbai Trans Harbour Link commences.

In a report on 14 November 2014 about the cancellation of the PPP agreement for Line 2, Mint quoted a senior MMRDA official as stating, "as decided earlier, all future lines of Mumbai Metro will be constructed by the Mumbai Metro Railway Corp. Ltd (MMRCL), a joint venture between the state government and the Union government." On 20 May 2015, Chief Minister Devendra Fadnavis requested officials to consider constructing the Charkop-Bandra-Dahisar and the Wadala-Thane-Kasarvadavali lines as elevated corridors. Although, both corridors had been planned as elevated lines in the Mumbai Metro master plan, the previous Congress-NCP had decided to construct all metro lines underground, after delays and difficulties caused by acquiring land for Line 1. However, Chief Minister Fadnavis believes that the two proposed lines can be constructed quicker and cheaper if they were elevated due to the proposed route of the alignment. The Government plans to implement all future metro lines (except Line 3) as elevated corridors. On 15 June 2015, the MMRDA announced that it would implement Line 2 of the metro in three parts. The Andheri-Dahisar line will have connectivity with the existing Line 1 and the proposed JVLR-Kanjurmarg line.

In June 2015, Fadnavis announced that he would request the DMRC to assist in the implementation of the Mumbai Metro. He stated that he intends to expand the metro system by 109 km before the state assembly elections in October 2019. In July 2015, UPS Madan announced that the State Government formally appointed the DMRC to revise and update the Mumbai Metro master plan. The DMRC will prepare DPRs for the Andheri East to Dahisar East, Jogeshwari to Kanjurmarg, Andheri West to Dahisar West and Bandra Kurla Complex to Mankhurd lines. The Andheri-Dahisar line will have connectivity with the existing Line 1 and the proposed JVLR-Kanjurmarg line. All four lines are proposed to be elevated and constructed as cash contracts. The lines are estimated to cost a total of 21,000 crore (US$3.1 billion), or about 350 crore (US$52 million) per km. In addition, the planned Line 3 and Wadala-Ghatkopar-Thane-Kasarvadavli line of the metro would also be constructed.

Network

Lines on the Mumbai Metro are currently identified by numbers. In March 2016, MMRDA Metropolitan Commissioner, U.P.S. Madan, announced that all lines on the system would be colour coded after more lines were opened.

Line 1

Line 1 connects Versova in the Western Suburbs to Ghatkopar in the Central Suburbs, covering a distance of 11.4 kilometres (7.1 mi). It is fully elevated, and consists of 12 stations. Work on the Versova-Andheri-Ghatkopar corridor, a part of Phase I, began on 8 February 2008. A crucial bridge on the project was completed at the end of 2012. The line opened for service on 8 June 2014.

Line 2

This corridor would be executed in two phases i.e. 2A and 2B.

The 2A corridor will be 18.5 km long. The work is being executed by DMRC on behalf of MMRDA. The corridor has 16 stations.

The 16 stations are Anand Nagar, Rushi Sankul, I C Colony, Eksar, Don Bosco, Shimpoli, Mahavir Nagar, Kamraj Nagar, Charkop, Malad Metro, Kasturi Park, Bangur Nagar, Goregaon Metro, Adarsha Nagar, Shastri Nagar and DN Nagar.

The corridor will cost around ₹6,410 crore. Its civil work including viaduct and stations are being executed by JKumar Infra Pvt. Ltd.

The corridor is proposed to be ready by 2019. It will have interchange with Line 1 at DN Nagar and Line 7 at Dahisar.

The metro 2B corridor is being constructed from DN Nagar to Mankhurd. The project is estimated to cost Rs 10,970 crore, including land acquisition cost of Rs 1,274 crore. It will have 22 stations on route. It will cost ₹10,970 crores.

It was cleared by MMRDA in April 2016. It is awaiting cabinet approval after which civil work would start in 6–9 months. It is expected to be completed by 2021. Although it is planned to be made elevated, there are certain issues, such as the line running close to Juhu aerodrome or the dense corridors of Bandra West.

The corridor would be funded by Asian Development Bank(ADB).

Metro 3

The second line to be constructed will be the 33.50 kilometre long Line 3. It will be the first underground metro line in Mumbai, and will consist of 27 stations. The metro line will connect Cuffe Parade business district to SEEPZ. It will also connect the Domestic and International airports of Mumbai. The cost of this corridor is estimated at 23,136 crore (US$3.4 billion). The original deadline for the project was 2016, but it is currently expected to be completed in 2022. Construction to start in 2017. Tenders for civil work were awarded in July 2016.

Upon completion, it will have interchanges with Line 6 at SEEPZ, Line 1 at Marol Naka, Line 2 at BKC, Central railway at Chhatrapati Shivaji Terminus Mumbai Monorail at Mahalaxmi (Jacob circle), and Western Railway at Mahalaxmi, Mumbai Central and Churchgate.

Metro 4

Metro 4 will be built across a 32-km corridor from Wadala to Kasarvadavali, near Thane, It will also be an elevated stretch. It is estimated to cost Rs 14,549 crore. This project will help connecting Thane area with the city of Mumbai with a new public transport system and will have a huge impact on the development and areas around the corridor.

The 32 station on the route are as Bhakti Park Metro, Wadala TT, Anik Nagar Bus Depot, Suman Nagar, Siddharth Colony, Amar Mahal Junction, Garodia Nagar, Pant Nagar, Laxmi Nagar, Shreyas Cinema, Godrej Company, Vikhroli Metro, Surya Nagar, Gandhi Nagar, Naval Housing, Bhandup Mahapalika, Bhandup Metro, Shangrila, Sonapur, Mulund Fire Station, Mulund Naka, Teen Haath Naka (Thane), RTO Thane, Mahapalika Marg, Cadbury Junction, Majiwada, Kapurbawdi, Manpada, Tikuji-ni-wadi, Dongri Pada, Vijay Garden, Kasarvadavali with 30-Hectare car deport at Owale.

The line was approved by the State Cabinet on 27 September 2016.

Asian Development Bank has shown interest in funding this corridor. The corridor is expected to be ready by 2020.

Metro 5

The 24.9 km-long Thane-Bhiwandi-Kalyan Metro-V corridor will have 17 stations and will cost Rs. 8,416 crore. It will be totally an elevated corridor.It will connect Thane to Bhiwandi and Kalyan in the eastern suburbs. The stations include Kapurbawdi in Thane (West), Balkum Naka, Kasheli, Kalher, Purna, Anjur Phata, Dhamankar Naka, Bhiwandi, Gopal Nagar, Temghar, Rajnouli Village, Govegaon MIDC, Kongaon, Durgadi Fort, Sahajanand Chowk, Kalyan railway station and Kalyan APMC.

The line was approved by Chief Minister Fadnavis on 19 October 2016. It will be ready by 2021-22.

Metro 6

The 14.47 km long Lokhandwala-Jogeshwari-Vikhroli-Kanjurmarg Metro-VI corridor will have 13 stations and cost Rs. 6,672 crore. It will be an elevated corridor.It will connect Lokhandwala Complex in Andheri in the western suburbs to Vikhroli and Kanjurmarg in the eastern suburbs. The stations include Lokhandwala Complex, Adarsh Nagar, Momin Nagar, JVLR, Shyam Nagar, Mahakali Caves, SEEPZ Village, Saki Vihar Road, Ram Baug, Powai Lake, IIT Powai, Kanjurmarg (W), Vikhroli-Eastern Express Highway. Metro 6 will provide interchange with Metro 2 at Infinity Mall in Andheri, with Metro 3 at SEEPZ, with Metro 4 and the Mumbai Suburban Railway at Jogeshwari and Kanjurmarg, and with Metro 7 at JVLR.

The line was approved by Chief Minister Fadnavis on 19 October 2016. It will be ready by 2021-22.

Metro 7

The corridor is from Andheri East to Dahisar East. It is 16.5 km long. It was approved in September 2015. It is now under construction. It has 16 stations on route. It is completely an elevated corridor. The 17 stations are kashimira, Dahisar (East), Ovaripada, National Park, Devipada, Magathane, Mahindra & Mahindra, Bandongri, Pushpa Park, Pathan Wadi, Dindoshi, Aarey, New Ashok Nagar, Mahanand, JVLR Junction, Shankarwadi, Andheri (East). It is expected to cost ₹ 6,208 crores. It will be completed by 2019. Civil work, including viaduct and station works, is being executed by NCC, Simplex Infrastructure and JKumar Infra.

The corridor is being funded by Asian Development Bank. It would be ready by September 2019.

Rolling stock

RIIL consulted a number of major international rolling stock builders to provide the train fleet for the Mumbai Metro. Bidders for the contract included established metro-vehicle manufacturers such as Kawasaki, Alstom, Siemens and Bombardier, but CSR Nanjing of China was ultimately chosen to supply rolling stock for Rs 6 billion. In May 2008, CSR Nanjing completed the first 16 trains, each comprising four cars. The first ten trains were reported to be ready for operation in January 2013.

The coaches are fire retardant, air-conditioned and designed to reduce noise and vibration, and will feature both high seating capacity and ample space for standing passengers. They will be outfitted with a number of features for safety and convenience, including LCD screens, 3D route maps, first-aid kits, wheelchair facilities, fire-fighting equipment and intercom systems permitting communication with the train driver. Each coach will furthermore feature a black box to assist in accident investigations. The trains will be capable of carrying over 1,100 passengers in a four-car unit, with each carriage being approximately 2.9 metres (9.5 ft) wide.

Power

Unlike 97% of metro corridors worldwide which run on direct current (DC), the Mumbai Metro runs on alternating current (AC) which is more labour and cost intensive. MMRDA joint project director Dilip Kawathkar stated that AC power was chosen "after a proper study by a team of experts" which found that the AC model was "a better option". Bidders for Line 3 were reportedly in favour of the DC model. Experts believe that the decision to use AC will escalate the project cost of underground lines by 15%, since more digging is required for the rail to work on AC.

Signalling and communications

The Mumbai Metro will feature an advanced signalling system, including an automatic train protection system (ATPS) and automated signalling to control train movements on the 11-kilometre (6.8 mi) Line 1. A four-minute service interval is anticipated on the route.

Siemens will supply the signalling systems required for the project, while Thales Group will supply the Metro's communication systems. The network's signalling and train control systems will be based on LZB 700M technology.

Ridership

A study in 2012 by Metro One and consultant MVA Systra estimated the daily ridership at 1.5 million, and it is estimated that the metro has seen 90 million annual passengers since it opened. The average ridership is 2.77 lakh. Travel time from Versova to Ghatkopar is expected to be approximately 21 minutes. Officials said that the maximum ridership recorded on a single day was 312,215 and minimum was 64,522. The Mumbai Metro witnessed service disruption two times between 2014 and 2015.