Trisha Shetty (Editor)

Ghatkopar metro station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Tracks
  
2

Platform levels
  
3

Phone
  
022 3031 0900

Level
  
3

Structure type
  
Elevated

Opened
  
8 June 2014

Owner
  
Platforms in use
  
2

Ghatkopar metro station

Location
  
Ghatkopar Station (West), Mumbai

Owned by
  
Mumbai Metro One Private Limited (MMOPL)

Operated by
  
Mumbai Metro One Pvt Ltd (MMOPL)

Address
  
Shraddhanand Road-Hirachand Desai Road, Ghatkopar (W), Near Ghatkopar Railway Station, Mumbai, Maharashtra 400086

Similar
  
Versova metro station, Ghatkopar railway station, Jagruti Nagar metro stat, Asalpha metro station, Saki Naka metro station

Ghatkopar metro stations 2nd day


Ghatkopar is a metro station and the eastern terminus of Line 1 of the Mumbai Metro serving the Ghatkopar suburb of Mumbai, India. It was opened to the public on 8 June 2014. Ghatkopar is the busiest station on Line 1, with 27% of all passengers travelling through the station.

Contents

History

The Mumbai Metropolitan Region Development Authority (MMRDA) acquired a 1,400 square metre plot near the Ghatkopar railway station for construction of the Ghatkopar metro station. The MMRDA initially believed that the land belonged to the Brihanmumbai Municipal Corporation (BMC). While the metro was being constructed, the CR wrote letters to the MMRDA informing them that the land actually belonged to CR. After CR submitted documents proving the same, the MMRDA agreed to compensate them for the plot. At a meeting between MMRDA and CR officials in April 2014, it was agreed that the former would pay 18 crore (US$2.7 million) for acquiring the land as part of an inter-governmental agency deal. However, some CR officials were reportedly upset as the amount was far lower than the market value of the land. As per market trends at the time, the land was estimated to be worth 180 crore (US$27 million).

Infrastructure

In March 2017, MMOPL completed the installation of LED lights at the station. The replacement of the station's 1,718 lamps with LED lights halved its energy consumption. Only lamps were replaced; fixtures were not. The total reduction in the station's electricity consumption amounts to 120,000 units per year providing the MMOPL with an annual saving of 12 lakh (US$18,000).

There are 7 sets of automated fare collection (AFC) gates at Ghatkopar station. Three more will be installed by the end of June 2014. The station has textured tiles intended to provide grip to wheelchair-bound commuters. The station also has an elevator wide enough to accommodate a wheelchair, and a ramp from road level up to the elevator, enabling access for the disabled.

Foot-over-bridge

The Ghatkopar station is connected with the western side of the Ghatkopar railway station through a 12-meter wide foot-over-bridge (FOB). Commuters who want to exit the metro station from the main gate must purchase a platform ticket to cross the FOB and reach the road.

Although the Central Railway (CR) had initially permitted metro commuters to use the FOB as a goodwill gesture around two weeks after the metro's opening, they announced that commuters found using the FOB without a platform ticket or a railway pass would be fined. A CR official told Mid Day, "We have seen the flow of passengers and we think that our local train passengers are facing a problem because of the sudden rush of Metro passengers. Therefore we are now insisting that Metro passengers buy tickets to use the railway-owned overbridge." Railway Pravasi Sangh President Subhash Gupta told the paper, "I am aware of this issue and also took it up in the meeting with railway officials. The railway FOB here can't take the burden of thousands of additional Metro passengers. The rush has increased manifold after Metro services started."

References

Ghatkopar metro station Wikipedia