Puneet Varma (Editor)

East Coast Main Line

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
System
  
Stations
  
52

Status
  
Operational

Line length
  
632,472 m

East Coast Main Line East Coast Main Line beleben

Type
  
Commuter rail, Inter-city railHeavy rail

Locale
  
Greater LondonEast of EnglandEast MidlandsYorkshire and the HumberNorth East EnglandScottish BordersCentral Scotland

Termini
  
London King's CrossEdinburgh Waverley

Rolling stocks
  
British Rail Class 43 (HST), British Rail Class 91

Depots
  
Hornsey EMU depot and former steam locomotive shed

East coast main line diversions whittlesea march 04 02 2017


The East Coast Main Line (ECML) is a 393-mile long (632 km) railway link between London and Edinburgh via Peterborough, Doncaster, Wakefield, Leeds, York, Darlington and Newcastle, electrified along the whole route. Services north of Edinburgh to Aberdeen and Inverness use diesel trains. The main franchise on the line is operated by Virgin Trains East Coast.

Contents

East Coast Main Line Stagecoach and Virgin win East Coast mainline rail franchise BBC News

The route forms a key artery on the eastern side of Great Britain and is broadly paralleled by the A1 trunk road. It links London, the South East and East Anglia, with Yorkshire, the North East Regions and Scotland. It also carries key commuter flows for the north side of London. It is important to the economic health of several areas of England and Scotland. It also handles cross-country, commuter and local passenger services, and carries heavy tonnages of freight traffic.

East Coast Main Line httpsuploadwikimediaorgwikipediacommonsthu

Route definition and description

The ECML forms part of Network Rail's Strategic Route G which comprises six separate lines:

East Coast Main Line East Coast Main Line Wikipedia

  • The main line between London King's Cross and Edinburgh Waverley stations, via Stevenage, Peterborough, Grantham, Newark North Gate, Retford, Doncaster, York, Northallerton, Darlington, Durham, Newcastle, Morpeth, Alnmouth, Berwick-upon-Tweed and Dunbar. The line crosses the Anglo-Scottish border at Marshall Meadows Bay;
  • The Doncaster branch of the Wakefield Line, between Doncaster and Leeds, via Wakefield Westgate;
  • The Northern City Line from Finsbury Park to Moorgate; and
  • The Hertford Loop Line from Alexandra Palace to Stevenage.
  • The branch line to North Berwick
  • The Dunbar loop

  • East Coast Main Line Chaos on East Coast line after power failure BBC News

    The core part of the route is the main line between King's Cross and Edinburgh, with the Hertford Loop used for local and freight services and the Northern City Line only used on weekdays for inner suburban services.

    The route has ELRs ECM1 - ECM9.

    History

    East Coast Main Line East Coast Main Line

    The line was built by three railway companies, each serving their own area, but with the intention of linking up to form the through route that became the East Coast Main Line. From north to south they were

    East Coast Main Line Virgin Trains East Coast Wikipedia

  • the North British Railway, from Edinburgh to Berwick-upon-Tweed, completed in 1846,
  • the North Eastern Railway from Berwick-upon-Tweed to Shaftholme
  • the Great Northern Railway from Shaftholme to Kings Cross, completed in 1850.

  • East Coast Main Line Disused Stations East Coast Main Line in Northumberland

    When first completed, the GNR made an end-on connection at Askern, famously described by the GNR's chairman as, "a ploughed field four miles north of Doncaster", with the Lancashire and Yorkshire Railway, a short section of which was used to reach the NER at Knottingley. In 1871, the route was shortened - NER opened a direct line which ran from an end-on junction with the GNR, at Shaftholme, just south of Askern to Selby and then (once over Selby bridge on the Leeds- Hull Line) direct to York

    Realising that through journeys were an important part of their business, the companies established special rolling stock in 1860 on a collaborative basis; it was called the "East Coast Joint Stock".

    In 1923 the three companies were grouped into the London and North Eastern Railway (LNER). This later became part of British Railways in 1948.

    Numerous alterations to short sections of the original route have taken place, the most notable being the opening of the King Edward VII Bridge in Newcastle upon Tyne in 1906 and the Selby Diversion, built to bypass anticipated mining subsidence from the Selby coalfield and a bottleneck at Selby station. The Selby Diversion was opened in 1983 and diverged from the original ECML at Temple Hirst Junction, north of Doncaster, and joined the Leeds to York Line at Colton Junction south west of York.

    The ECML has been the backdrop for a number of famous rail journeys and locomotives. The line was worked for many years by Pacific locomotives designed by Gresley, including the famous steam locomotives "Flying Scotsman" and "Mallard". Mallard achieved a world record speed for a steam locomotive, at 126 miles per hour (203 km/h) and this record was never beaten. It made the run on the Grantham-to-Peterborough section, on the descent of Stoke Bank.

    Steam locomotives were replaced by Diesel electrics in the early 1960s, when the purpose-built Deltic locomotive was developed by English Electric. The prototype was successful and a fleet of 22 locomotives was built, to handle all the important express traffic. The Class 55s were powered by two Napier Deltic engines originally developed for fast torpedo boats, with the three crankshaft triangular configuration of the engines giving the Deltic name. Their characteristic throaty exhaust roar and chubby body outline made them unmistakable. The Class 55 was for a time the most powerful diesel locomotive in service in Britain, at 3,300 hp (2,500 kW).

    Just after the Deltics were introduced, the first sections of the East Coast Main Line were upgraded to allow 100 miles per hour (160 km/h) running. The first length to be cleared for the new higher speed was a 17 miles (27 km) stretch between Peterborough and Grantham on 15 June 1965, the second was 12 miles (19 km) between Grantham and Newark.

    As the demand for higher speed intensified, the Deltics were superseded by the High Speed Train (HST), introduced between 1976 and 1981, and still in service in 2015, re-engined, with MTU engines replacing the original Paxman Valenta power units.

    A prototype of the HST, the Class 41 achieved 143 mph (230 km/h) on the line in 1973. Current UK legislation requires in-cab signalling for speeds of over 125 mph which is the primary reason preventing the InterCity 225 train-sets from operating at their design speed of 140 mph (225 km/h) in normal service.

    A secondary factor was that the signalling technology of the time was insufficient to allow detection of two broken rails on the line on which the train was operating.

    Before the present in-cab regulations came in, British Rail experimented with 140 mph running by introducing a fifth, flashing green signalling aspect on the Down Fast line (signals P487 to P615) and Up Fast line (signals P610 to P494) between New England North and Stoke Tunnel. The fifth aspect is still shown in normal service and appears when the next signal is showing a green (or another flashing green) aspect and the signal section is clear, which ensures that there is sufficient braking distance to bring a train to a stand from 140 mph. Locomotives have operated on the ECML at speeds of up to 161.7 mph (260.2 km/h) in test runs. The capability to run special test trains in excess of 125 mph is listed as being maintained in the LNE Sectional Appendix

    Electrification

    The ECML was electrified using 25 kV AC overhead lines by British Rail in two phases between 1976 and 1991: The first phase between London (Kings Cross) and Hitchin was carried out between 1976 and 1978 as part of the Great Northern Suburban Electrification Project using Mk.3A equipment. This included the Hertford Loop Line. The second phase began in 1984, when authority was given to electrify to Edinburgh and Leeds using Mk.3B equipment. Construction began in 1985, and the section between Hitchin and Peterborough was completed in 1987, Doncaster and York were reached in 1989. By 1990 electrification had reached Newcastle, and in 1991 Edinburgh. At the peak of the electrification project during the late 1980s, it was claimed to be the "longest construction site in the world" at over 250 miles (400 km). The current InterCity 225 rolling stock was introduced in 1990 to work the electrified line.

    Infrastructure

    The line is mainly four tracks from London to Stoke Tunnel, south of Grantham. However, there are two major twin-track sections: the first of these is near Welwyn North Station as it crosses the Digswell Viaduct and passes through two tunnels; the second is a section around 'Stilton Fen', between Fletton Junction near Peterborough, and southwards towards Holme Junction; furthermore, the section between Holme Junction south to Huntingdon is mostly triple track. North of Grantham the route is twin track except for four-track sections at Retford around Doncaster, between Colton Junction (which is south of York), Thirsk and Northallerton, and another at Newcastle.

    The main route is electrified along the full route and only the line between Leeds and York (Neville Hill Depot to Colton Junction) is non-electrified. This diversionary route will be electrified as part of the transpennine electrification scheme, to be completed by December 2018.

    With most of the line rated for 125 mph (200 km/h) operation, the ECML was the fastest main line in the UK until the opening of High Speed 1. These relatively high speeds are possible because much of the ECML travels on fairly straight track on the flatter, eastern regions of England, through Lincolnshire and Cambridgeshire, though there are significant speed restrictions (due to curvature) particularly north of Darlington and between Doncaster and Leeds. By contrast, the West Coast Main Line has to traverse the Trent Valley and the mountains of Cumbria, leading to many more curves and a lower general speed limit of 110 mph (180 km/h). Speeds on the WCML have been increased in recent years with the introduction of tilting Pendolino trains and now match the 125 mph speeds available on the ECML.

    Rolling stock

    Most express passenger services use the InterCity 225 rolling stock.

    Some diesels still operate on line, including:

  • CrossCountry's Class 220 Voyagers, Class 221 Super Voyagers and, occasionally, HST sets that CrossCountry introduced after it took over from Virgin CrossCountry. (Joining the ECML at York and continuing to Newcastle, Edinburgh, Glasgow, Dundee and Aberdeen)
  • Hull Trains Class 180 Adelantes (Kings Cross–Hull)
  • Virgin Trains East Coast HST sets work to Inverness and Aberdeen, as well as daily services to Lincoln, Hull and Harrogate .
  • East Midlands Trains operates a limited service of HSTs over a portion of the route between Doncaster and Leeds, and a summer Saturday service with Class 222 Meridians from York and Scarborough to London St Pancras, and back.
  • Grand Central's HSTs and Class 180 Zephyrs (Kings Cross–Sunderland/Bradford)
  • Operators

    The line's current principal operator is Virgin Trains East Coast, whose services include regular trains between King's Cross, the East Midlands, Yorkshire, the North East of England and Scotland. Virgin Trains East Coast is jointly operated by Stagecoach Group and Virgin Group and took over from East Coast on 1 March 2015. Other operators of passenger trains on the line are:

  • Great Northern: long distance services between King's Cross, Peterborough, Cambridge and King's Lynn and commuter services between Moorgate and Stevenage via either Welwyn Garden City or the Hertford Loop.
  • Hull Trains: operate six trains per day between Kings Cross and Hull and one per day between Kings Cross and Beverley on weekdays, whilst on weekends there are seven trains a day between Kings Cross and Hull.
  • East Midlands Trains: local services between Grantham and Peterborough, part of the service that runs between Liverpool Lime Street and Norwich, as well as infrequent services between London-York and Scarborough, extensions of services running to/from Sheffield, Leicester and London St Pancras.
  • CrossCountry: cross-country services north of Sheffield are routed via either Leeds or Doncaster. Leeds trains use the ECML between Wakefield Westgate and Leeds and then again north of York. Doncaster trains use the ECML north of Doncaster. Services run to and beyond Edinburgh. Occasional services run from Doncaster to Leeds before rejoining the ECML at York.
  • TransPennine Express: between Liverpool Lime Street and Newcastle also between Manchester Airport and Middlesbrough before they divert off the ECML to Middlesbrough via Yarm.
  • Northern: suburban services from Doncaster to Leeds and Chathill to Newcastle via Morpeth railway station and infrequent services between Newcastle and Darlington that continue to Middlesbrough and Saltburn. Services between Selby and York also use the line from Hambleton Junction to York.
  • Abellio ScotRail: services from Edinburgh Waverley to North Berwick and Dunbar. The overnight Caledonian Sleeper occasionally uses the ECML when engineering works prevent it from using its normal train path on the WCML.
  • Grand Central: intercity operate five daily services between Kings Cross and Sunderland, branching off the main line at Northallerton; and four daily services between Kings Cross and Bradford, branching off at Doncaster.
  • Eurostar previously held the rights to run five trains a day on the line for services from continental Europe to cities north of London, as part of the Regional Eurostar plan, although such services have never been run.

    DB Schenker, GBRf, Freightliner, Freightliner Heavy Haul and Direct Rail Services operate freight services.

    Capacity problems

    The ECML is one of the busiest lines on the British rail network and there is currently insufficient capacity on parts of the line to satisfy all the requirements of both passenger and freight operators.

    There are bottlenecks at the following locations:

  • The section of twin track within a four-line section at Welwyn North over the Digswell Viaduct and through the Welwyn tunnels
  • The twin and triple track sections located between Huntingdon and Peterborough.
  • Just north of Newark station at a flat crossing with the Nottingham to Lincoln Line.
  • The section of double track between Stoke Tunnel and Doncaster.
  • Doncaster station has limited facilities for terminating branch trains on the up side of the station. This has been remedied with the opening of a new platform (platform 0) on the up side so that trains to and from the Thorne direction are able to de-conflict their arrivals and departures with high speed trains.
  • The north throat of York station including Skelton Bridge Junction.
  • South of Newcastle to Northallerton (which is also predominately double track), leading to proposals to reopen the Leamside line to passenger and freight traffic.
  • Railway operations are vulnerable during high winds and there have been several de-wirements over the years due to the unusually wide spacing (up to 75 m) between the supporting masts of the overhead lines. The other cost-reduction measure was the use of headspan catenary support systems over the quadruple track sections - as employed in the Weaver Junction to Glasgow Electrification on the WCML during the 1970s. Headspans do not have mechanically independent registration (MIR) of each electrified road and thus are more complex to setup, compared to TTC (Two Track Cantilever) and portal style support structures, during installation. In the event of a de-wirement of a given road, headspans result in the need to correctly setup the OLE of adjacent roads before the line can reopen to electric traction. This was a result of extreme pressure from the Department for Transport to reduce avoidable costs when the line was originally electrified between 1985 and 1990.

    Recent developments

  • The Allington Chord was constructed near Grantham in 2006, allowing services between Nottingham and Skegness to call at Grantham without having to use the ECML, trains now passing under the line. This provided sufficient extra capacity for 12 additional services between Leeds and London each day.
  • A new platform at London Kings Cross was opened on 20 May 2010. This was originally to be called "Platform Y". Instead it has been named Platform 0 to avoid confusion of lettered and numbered platforms.
  • At the southern end of York station a short length of fourth track was installed in early 2011 at Holgate Junction with accompanying OLE and signalling systems. This work helped to remove one of the bottlenecks on the East Coast Main Line. Previously, trains from Leeds would sometimes have to wait before entering the station. The improvement allows for better flow of trains in and out of the station.
  • Provision of a £47m grade-separated junction to the north of Hitchin (the Hitchin flyover) enabling down Cambridge trains to cross the main line The work was completed by 26 June 2013
  • Major remodelling of Peterborough station was completed during early 2014 providing three platform faces for services in the up direction towards London and two for ECML services travelling north on the down lines. An additional two platform faces are also available for Cross Country services to and from stations to the east of Peterborough.
  • A new flyover just south of Joan Croft level crossing in South Yorkshire to allow freight trains from Immingham to pass over the line on their way to Eggborough and Drax power stations, was completed in very early 2014. The project, known as the North Doncaster Chord, also replaced the level crossing on a minor road with a new overbridge just to the north of the original crossing point.
  • Renewal and gauge enhancement of the Great Northern and Great Eastern Line which runs parallel to the ECML between Peterborough and Doncaster. This removes freight traffic from a heavily congested section of the ECML.
  • A new Rail Operating Centre (ROC), with training facilities, opened in early 2014 at the "Engineer's Triangle" in York. The ROC will enable signalling and day-to-day operations of the route to be undertaken in a single location. Signalling control/traffic management using ERTMS is scheduled to be introduced from 2020 on the ECML between London Kings Cross and Doncaster - managed from the York ROC.
  • An £8.6 million redevelopment of Newcastle Central Station was completed in 2014 enhancing the existing station and provide a state-of-the-art station for thousands of passengers.
  • Provision of a new Up bay platform (Platform 0) at Doncaster station (part of the ECML Connectivity programme).
  • Planned or proposed developments

    Over the years successive infrastructure managers have developed schemes for route improvements. The most recent of which is the £240 million "ECML Connectivity Fund" included in the 2012 HLOS with the objective of increasing capacity and reducing journey times. Current plans include the following:

  • Connection of the ECML to Thameslink as part of the Thameslink Programme (for Thameslink and Great Northern commuter services to be extended to south London).
  • Full reversible signalling over the Stilton Fen section
  • Werrington Grade Separation: A £96 million scheme to increase capacity north of Peterborough station by constructing a diver under to route rail traffic between the Stamford Lines and the GNGE line, thereby avoiding at-grade conflicts on the ECML. The scheme is under TWA application (February 2017).
  • Power supply upgrades (PSU) between Wood Green and Bawtry (Phase 1) and Bawtry to Edinburgh (Phase 2), including some overhead lines (OLE) support improvements, rewiring of the contact and catenary wires, and headspan to portal conversions (HS2P).
  • Re-quadrupling of the route between Huntingdon and Woodwalton (HW4T) which was rationalised in the 1980s (part of the ECML Connectivity programme). This also involves the closure and diversion of a level crossing at Abbots Ripton.
  • Power supply enhancement on the diversionary Hertford Loop route
  • Level crossing closures between Kings Cross and Doncaster: As of July 2015 this will no longer be conducted as a single closure of 73 level crossings - but conducted on a case-by case basis.
  • Additional down platform and turnback facility at Stevenage (part of the ECML Connectivity programme) - now delayed from CP5 to CP6.
  • Additional turnback facility at Gordon Hill (part of the ECML Connectivity programme).
  • Enhanced passenger access to the platforms at Peterborough and Stevenage
  • Further remodelling at Peterborough and linespeed enhancements on the down slow line in the Fletton area
  • Modified north throat at York Station to reduce congestion for services calling at Platforms 9 - 11 (part of the ECML Connectivity programme)
  • Kings Cross throat remodelling to improve capacity and introduce higher speed turnouts reducing journey times.
  • Increasing maximum speeds on the fast lines between Woolmer Green and Dalton-on-Tees up to 140 mph (225 km/h) in conjunction with the introduction of the Intercity Express Programme, level crossing closures, ETRMS fitments, OLE rewiring and the OLE PSU - est. to cost £1.3 billion (2014). This project is referred to as "L2E4" or London to Edinburgh (in) 4 Hours. L2E4 examined the operation of the IEP at 140 mph on the ECML and the sections of track which can be upgraded to permit this, together with the engineering and operational costs.
  • Upgrading of the fast lines at Shaftholme Junction from 100 mph to 125 mph.
  • Replacement of the Flat Crossing at Newark with a flyover (scheme developed to GRIP Stage 2 by Jacobs)
  • The line between London King's Cross and Bawtry, on the approach to Doncaster, will be signalled with Level 2 ERTMS. The target date for operational ERTMS services is December 2018 with completion in 2020
  • Darlington station up fast line platform
  • Fitment of TASS Balises and Gauging/Structure works proposed by the open operator GNER (Alliance Rail) to support its aspirations for express 3hr43min London to Edinburgh Services. Tilt would be required north of Darlington for Pendolino trains.
  • Accidents

    The ECML has been witness to a number of incidents resulting in death and serious injury:

    The cuttings and tunnel entrances just north of King's Cross make a memorable smoky appearance in the 1955 Ealing comedy film The Ladykillers. Also during the 1950s, the line featured in the 1954 documentary short Elizabethan Express. Later, the 1971 British gangster film Get Carter features a journey from London Kings Cross to Newcastle in the opening credits. The motoring show Top Gear featured a race including LNER A1 60163 Tornado running up this line from London to Edinburgh.

    The route has been featured in several train simulator games. Trainz Simulator 2010 features the route between London and York, Trainz Simulator 12 extends the route to Newcastle, and Trainz: A New Era brings it all the way to Edinburgh, allowing the entire 393-mile route to be driven. All three routes take place during the 1970s, around the time the InterCity 125 was introduced. This is reinforced by instructions in the "HST Southbound Express" session not to move until the guard has locked the doors, since the trains did not have pneumatic locks initially; doing so will lead to an automatic failure. Other rolling stock includes Class 37s, Class 47s, and Class 105s, plus Mark 2 coaches. TS12's version added Class 55 Deltics and Class 313s, as well as additional pre-made, pre-scripted sessions.

    King's Cross is also known as the starting point of the Hogwarts Express from the books and films in the Harry Potter series. Within the station concourse there is a tourist attraction of the Platform 9¾ sign and a luggage trolley partially embedded in the station wall with an owl cage and suitcases on it.

    References

    East Coast Main Line Wikipedia