Construction began
  
1960

Type of dam
  
Earth-fill & Gravity

Length
  
512 m (1,680 ft)

Opened
  
1981

Opening date
  
1981

Impounds
  
Krishna River

Height
  
145 m

Phone
  
085242 88883

Srisailam Dam

Location
  
Kurnool district, Andhra Pradesh State, And, Mahbubnagar District, Telangana State, India

Address
  
Srisailam Reservoir, Mahbubnagar, Telangana

Hours
  
Open today · Open 24 hoursFridayOpen 24 hoursSaturdayOpen 24 hoursSundayOpen 24 hoursMondayOpen 24 hoursTuesdayOpen 24 hoursWednesdayOpen 24 hoursThursdayOpen 24 hoursSuggest an edit

Similar
  
Nagarjuna Sagar Dam, Jurala Project, Mallikarjuna Jyotirlinga, Almatti Dam, Pulichinthala Project

Srisailam dam eight gates open 2013


The Srisailam Dam is constructed across the Krishna River on the border of Mahabubnagar District, Telangana and Kurnool district, Andhra Pradesh near Srisailam temple town and is the 2nd largest capacity working hydroelectric station in the country.

Contents

The dam was constructed in a deep gorge in the Nallamala Hills in between Mahabubnagar and Kurnool districts, 300 m (980 ft) above sea level. It is 512 m (1,680 ft) long, 145 metres (476 ft) maximum height and has 12 radial crest gates. It has a reservoir of 616 square kilometres (238 sq mi). Project has an estimated live capacity to hold 178.74 Tmcft at its full reservoir level of 885 feet (270 m) MSL. The minimum draw down level (MDDL) of the reservoir is at 705 feet (215 m) MSL from its river sluice gates. The left bank underground power station houses 6 × 150 megawatts (200,000 hp) reversible Francis-pump turbines for pumped-storage operation and the right bank semi under ground power station houses 7 × 110 megawatts (150,000 hp) Francis-turbine generators.

Tail pond dam /weir located 14 km downstream of Srisailam dam is under advanced stage of construction to hold the water released by the hydro turbines and later pump back in to the Srisailam reservoir by operating the turbines in pump mode. The weir portion got breached in November 2015 unable to withstand the normal water release from the hydro power stations.

Srisailam dam history 1


Project history

The Srisailam project began in 1960, initially as a power project. After several delays, the main dam was finally completed twenty years later in 1980 July 26. In the meantime the project was converted into a multipurpose facility with a generating capacity of 770 megawatts (1,030,000 hp) by its second stage which was completed in 1987. The dam is to provide water for an estimated 2,000 square kilometres (770 sq mi). Under the right bank branch canal 790 square kilometres (310 sq mi) in Kurnool and Kadapa districts will have assured irrigation. From the initial modest estimate of 384.7 million for a power project the total cost of the multipurpose project was estimated to cross 10 billion in its enlarged form. The dam has alone cost 4.04 billion together with the installation of four generating sets of 110 MW each. The right bank branch canal is estimated to cost 4.49 billion and the initial investment of 1.4 billion has been provided by the World Bank. The projected cost-benefit ratio of the project has been worked out at 1:1.91 at 10% interest on capital outlay.. In 1998 a coffer dam was over topped by flooding. The power house required repairs and did not generate power for a year. On 2 October 2009, Srisailam dam experienced a record inflow which threatened the dam.

Irrigation schemes

Srisailam right main canal (SRMC) is constructed with 44,000 cusecs capacity at full supply level of 267.92 metres (879 ft) MSL to feed Veligodu reservoir, Brahmamsagar Reservoir, Alaganoor reservoir, Gorakallu reservoir, Owk reservoir, Gandikota Reservoir, Mylavaram reservoir, Somasila resrvoir and Kandeleru reservoir. This canal also supplies water to Telugu Ganga project which supplies Krishna river water to Chennai city for its drinking purpose. This main canal by feeding water to K. C. Canal, Srisailam right bank canal, Telugu Ganga canal and Galeru Nagari canal irrigates vast area in Kurnool, Kadapa, Chittor and Nellore districts.

Handri-Neeva lift canal by drawing water from the Srisailam reservoir, supplies drinking water in all the districts of Rayalaseema

Veligonda reservoir receives water by gravity through tunnels to irrigate lands in Nellore, Kadapa and Prakasam districts.

Kalwakurthy lift irrigation scheme by drawing water from the Srisailam reservoir, supplies irrigation water in Mahbubnagar and Nalgonda districts

Srisailam left bank canal receives water by gravity through tunnels to irrigate lands in Nalgonda district.

Power generation optimization

At present the initial inflows into Srisailam reservoir are stored excessively without using for power generation. The flood water fills the remaining empty Srisailam reservoir quickly and most of the flood water overflows into downstream Nagarjunasagar reservoir without being used for power generation. The endeavor shall be to fill the Nagarjunasagar reservoir fully with the uniform water released through the power generating units.

References