Rahul Sharma (Editor)

Telugu Ganga project

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Telugu Ganga project VBR Spillway Telugu Ganga Project APR CONSTRUCTIONS LTD

Telugu ganga project telugu ganga canal water river ntr opens gest sonia gandhi virat vision


The Telugu Ganga project is a water supply scheme implemented by Andhra Pradesh, India to provide drinking water to Chennai city in Tamil Nadu. It is also known as the Krishna Water Supply Project, since the source of the water is the Krishna river in Andhra Pradesh. Water is drawn from the Srisailam reservoir and diverted towards Chennai through a series of inter-linked canals, over a distance of about 406 kilometres (252 mi), before it reaches the destination at the Poondi reservoir near Chennai. The main checkpoints en route include the Somasila reservoir in Pennar valley, the Kandaleru reservoir, the 'Zero Point' near Uthukkottai where the water enters Tamil Nadu territory and finally, the Poondi reservoir, also known as Satyamurthy Sagar. From Poondi, water is distributed through a system of link-canals to other storage reservoirs located at Red Hills, Sholavaram and Chembarambakkam.

Contents

Telugu Ganga project Telugu Ganga Project Canal APR CONSTRUCTIONS LTD

The project was approved in 1977 after an agreement was reached between Tamil Nadu and the riparian states of Krishna river: Andhra Pradesh, Maharashtra and Karnataka. According to the agreement, each of the three riparian states were to contribute 5 billion cubic feet (140×10^6 m3) of water annually, for a total supply of 15 billion cubic feet (420×10^6 m3). This number was revised down to 12 billion cubic feet (340×10^6 m3) in 1983 after accounting seepage and evaporation loses.

Telugu Ganga project Telugu Ganga Major Irrigation Project JI00047

The water initially supplied by the canal was disappointing, delivering less than 500 million cubic feet (14×10^6 m3). In 2002, the religious leader Sathya Sai Baba announced a scheme of restoration and lining of the canal; a private undertaking. With an extensive rebuilding of the canal and several reservoirs, the project was completed in 2004, when Poondi reservoir received Krishna water for the first time. The supply of water to Chennai city in 2006 was 3.7 billion cubic feet (100×10^6 m3). After the re-lining and reconstruction, the Kandaleru-Poondi part of the canal was renamed Sai Ganga.

Telugu Ganga project wwwindianetzonecomphotosgallery51TeluguGang

Samaikynadhra heat to telugu ganga project tv5


Telugu Ganga project SSSCTService Projects Water Supply Chennai

Telugu Ganga project History of Teluge Ganga AP Heritage

Telugu Ganga project Cover Story The Chennai Citizen39s Conclave Divinity Diffuses all

References

Telugu Ganga project Wikipedia