Puneet Varma (Editor)

Howrah–Nagpur–Mumbai line

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
System
  
Electrified

Opened
  
1900

Number of tracks
  
2

Status
  
Operational

Line length
  
1,968 km (1,223 mi)

Howrah–Nagpur–Mumbai line

Track gauge
  
1,676 mm (5 ft 6 in) Broad gauge

Terminis
  
Chhatrapati Shivaji Terminus railway station, Howrah Junction railway station


The Howrah–Nagpur–Mumbai line (also known as Mumbai-Kolkata line) is a railway line connecting Kolkata and Mumbai via Nagpur. The 1,968 km (1,223 mi) railway line was opened to traffic in 1900.

Contents

Sections

The 1,968 km (1,223 mi) long trunk line has been treated in more detail in smaller sections:

  1. Howrah-Kharagapur section
  2. Kharagpur-Tatanagar section
  3. Tatanagar-Bilaspur section
  4. Bilaspur-Nagpur section
  5. Nagpur-Bhusawal section
  6. Bhusawal-Kalyan section
  7. Kalyan-Mumbai CST section

Geography

The Howrah–Nagpur–Mumbai line cuts across the central parts of India in an east-west direction and traverses the plains of lower West Bengal, the southern part of Chota Nagpur Plateau, the Deccan Plateau, the Western Ghats and finally the Western Coastal Plains.

History

The first train in India travelled from Mumbai to Thane on 16 April 1853. By May, 1854, Great Indian Peninsula Railway's Bombay-Thane line was extended to Kalyan. Bhusawal station was set up in 1860 and in 1867 the GIPR branch line was extended to Nagpur.

While the entire Mumbai-Nagpur line was broad gauge, the next part from Nagpur to Rajnandgaon was meter gauge. The Nagpur Chhattisgarh Railway started construction of the 240 km (149 mi) Nagpur-Rajnandgaon section in 1878, after surveys were started in 1871. The Nagpur-Tumsar Road section was opened in April 1880 and the Tumsar Road-Rajnandgaon section in December 1880.

The GIPR and EIR, working jointly, completed the Howrah-Allahabad-Mumbai line thereby establishing connectivity between Kolkata and Mumbai in 1870. The great famine of 1878 was an impetus for the fast completion of the Nagpur Chhattisgarh Railway track, but by then the idea of a route from Mumbai to Kolkata, shorter than the one via Allahabad, had set in.

The Bengal Nagpur Railway was formed in 1871. Amongst its major objectives were taking over of the Nagpur Chhattisgarh Railway and its conversion to broad gauge and extension of its system by a 772 km (480 mi) line to Asansol on EIR’s main line. The entire task was completed by 1891 and Nagpur was connected to Asansol. However, the line via Asansol was never seriously used as a link to Howrah for passenger traffic.

The Sini-Kharagpur-Kolaghat line was opened in 1898-99. The Kolaghat-Howrah section was completed in 1899-1900. The entire line was opened with the completion of the bridge across the Rupnarayan River, near Kolaghat, on 19 April 1900.

Electrification

The entire line is electrified.

Speed limits

The entire Howrah-Nagpaur-Mumbai line is classified as a "Group A" line which can take speeds up to 160 km/hr.

Passenger movement

Howrah, Kharagpur, Tatanagar, Rourkela, Bilaspur, Raipur, Durg, Nagpur, Badnera, Akola, Bhusawal, Nasik Road and Manmad on this line, are amongst the top hundred booking stations of Indian Railway.

Golden quadrilateral

The Howrah–Nagpur–Mumbai line is a part of the golden quadrilateral. The routes connecting the four major metropolises (New Delhi, Mumbai, Chennai and Kolkata), along with their diagonals, known as the golden quadrilateral, carry about half the freight and nearly half the passenger traffic, although they form only 16 per cent of the length.

References

Howrah–Nagpur–Mumbai line Wikipedia