Neha Patil (Editor)

Sir Leo Hielscher Bridges

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Carries
  
Motor vehicles

Width
  
22 metres (72 ft)

Construction started
  
5 June 1980

Total length
  
1,627 m

Owner
  
Queensland Motorways

Crosses
  
Brisbane River

Height
  
79 m

Opened
  
11 January 1986

Clearance below
  
55 m

Sir Leo Hielscher Bridges

Locale
  
Brisbane, Queensland, Australia

Official name
  
Sir Leo Hielscher Bridges

Design
  
Concrete cantilever box girder

Similar
  
Brisbane River, Go Between Bridge, Story Bridge, Goodwill Bridge, Bridges over the Brisbane

Gateway motorway m1 sir leo hielscher bridges queensland


The Sir Leo Hielscher Bridges are a side-by-side pair of road bridges on the Gateway Motorway (M1), which skirts the eastern suburbs of Brisbane, Queensland, Australia. The western bridge carries traffic to the north and the eastern bridge carries traffic to the south. They are the most eastern crossing of the Brisbane River, the closest to Moreton Bay, crossing at the Quarries Reach, between Eagle Farm and Murarrie. The original bridge (formerly named the Gateway Bridge) was opened on 11 January 1986 and cost A$92 million to build. The duplicate bridge was opened in May 2010, and cost $350 million.

Contents

On 16 May 2010 the Queensland Government renamed the Gateway Bridge and its duplicate the Sir Leo Hielscher Bridges. An opinion poll conducted by Brisbane's Channel Nine News, showed 97% of people were against the decision to rename the bridge and most people still call it the Gateway Bridge.

A public open day for the duplicate bridge was held on 16 May and the new bridge was opened to traffic on 22 May 2010, six months ahead of schedule. Following the opening, the old bridge was refurbished, three vehicle lanes at a time. From November 2010 the two bridges carry 12 lanes of vehicle traffic (six in either direction). The associated upgrade of the Gateway Motorway south of the bridge was completed in May 2010 to coincide with the new bridge opening.

The bridge is tolled using the Go via electronic system and will remain so until 2041. The toll booths were removed and free flow tolling began in July 2009. The booth removal saw an immediate drop in road crashes due to the reduction in queuing and weaving at the toll booths on the southern approach.

To brisbane airport old cleveland rd m1 sir leo hielscher bridges


History

Construction on the Gateway Bridge commenced on 5 June 1980. The construction of the bridge started before the design was completed, to fast track its construction. It was officially commissioned on 11 January 1986. On this day 200,000 people crossed the bridge by foot as part of the opening activities.

In 1986 the bridge carried an average of 12,500 vehicles per day. In 2001 the bridge was crossed by 27 million vehicles (approximately 73,975 vehicles per day). In early 2010 the single bridge was carrying an average of 100,000 vehicles per day.

The annual Bridge to Brisbane fun run has begun from the southern entrance to the bridge for the past decade.

Design

In 1979 a tender was called by the Queensland Main Roads Department for a new bridge crossing of the Brisbane River. The conforming design main span was designed as a balanced cantilever with two raised post tensioned concrete compression stays located on the median & over each of the two main piers to support the 260 metre span. Due to the proximity of the Brisbane Airport, an overall structural height constraint was provided due to aircraft flight path & clearances. This constraint ruled out the possibility of a conventional Cable Stay Bridge due to the height of the pylons that would be required. Due to cost considerations an alternative design concept was proposed by Bruce Ramsay (Manager Engineering) of VSL. This alternative design required a world record main span of 260m for a free cantilever concrete box girder bridge. The concept was adopted by one of the tenderers - Transfield Queensland Pty.Ltd. who were subsequently awarded the project on the basis of this alternative. It held the record span of 260m for over 15 years. The box girder is still the largest prestressed concrete, single box in the world, measuring 15m deep at the pier, with a box width of 12m and an overall deck width for the six lanes of 22m.

As stated above the bridge owes its distinctive shape to air traffic requirements restricting its height to under 80 metres (260 ft) above sea level (all features of the bridge including light poles) coupled with shipping needs requiring a navigational clearance of 55 metres (180 ft).

The bridge has six lanes (originally three lanes in each direction, which were subsequently reconfigured to six lanes of northbound traffic after opening of the duplicate bridge).

The bridge was financed by funds borrowed by the Queensland Government, and as a result, users of the bridge pay a toll when crossing the bridge in either direction. The bridge is operated and maintained by Queensland Motorways, which is a Queensland Government-owned enterprise.

The total length is 1,627 metres (5,337 ft). This is divided into a southern approach of 376 metres (1,234 ft), a northern approach of 731 metres (2,398 ft) and the three central spans of 520 metres (1,706 ft). The record main span is 260 metres (853 ft) long by 64.5 metres (212 ft) high, which is equivalent to a 20-storey building. A total of 150,000 tonnes (165,000 short tons) of concrete was used to construct the bridge.

The original design did not include a safety fence to prevent suicide attempts and base jumping. Three-metre high safety fences attached to the top of the concrete traffic barrier were later installed to prevent these incidents occurring. Anti-climbing screens are part of the second bridge's security features.

Duplication

In 2005, a major upgrade of the Gateway Motorway was announced. Leighton Holdings and joint venture partner AbiGroup won the contract to upgrade the Motorway. The A$1.88 billion Gateway Upgrade Project includes the duplication of the Gateway Bridge and upgrades to 20 km (12 mi) of the Gateway Motorway from Mt Gravatt-Capalaba Road in the south to Nudgee Road in the north. The bridge duplication is the largest bridge and road development in Queensland's history. The duplicate bridge was specified to have a design life of 300 years.

To the south, the upgrade includes widening 12 km (7 mi) of the Gateway Motorway from 4 to 6 lanes. To the north, it involves the construction of the 7 km (4 mi) Gateway Motorway deviation, an entirely new six-lane motorway between the Gateway Bridge and Nudgee Road. The deviation runs east of the original motorway through Brisbane Airport Corporation land and provides an alternative means of access to Brisbane Airport (the only effective access from the south). The new bridge provides a bicycle path unlike the first crossing.

The Wynnum Road upgrade was completed on 13th July 2007 and 2 additional southbound lanes between the Port of Brisbane Motorway and Wynnum Road completed in late 2007. Four of six lanes of the new Gateway Motorway deviation were opened in July 2009. All works south of the river were complete by the end of 2009 after 10 years of constant roadwork and traffic disruption. The final concrete pour linking the sides of the new bridge was made in late October 2009. A total of 748 concrete segments, which are supported by 17 piers, were placed for the new bridge.

The duplicate bridge was completed in May 2010 along with the remaining lanes of the Gateway Motorway deviation.

In October 2010, then Minister for Main Roads, Craig Wallace, announced that the original course of the Gateway Motorway via Eagle Farm would be renamed to Southern Cross Way, after Sir Charles Kingsford Smith's aircraft, the Southern Cross, which landed at Eagle Farm in 1928, and so as to avoid confusion with the newly opened Gateway Motorway deviation. The new Gateway Motorway deviation was given the name Gateway Motorway. However, like the renaming of the bridges themselves, the change to Southern Cross Way was not without controversy, attracting criticism from the then Shadow Minister for Main Roads and Transport, Fiona Simpson.

Refurbishment of the existing bridge was completed in November 2010.

References

Sir Leo Hielscher Bridges Wikipedia