Crosses
  
Brisbane River

Longest span
  
117 metres (384 ft)

Total length
  
300 m

Architecture firm
  
Hyder Consulting

Official name
  
Go Between Bridge

Opened
  
5 July 2010

Body of water
  
Brisbane River

Go Between Bridge

Carries
  
Motor vehicles, pedestrians and cyclists

Locale
  
Brisbane, Queensland, Australia

Design
  
twin concrete cantilever box girder

Location
  
Brisbane, Milton, West End

Bridge type
  
Box girder bridge, Cantilever bridge

Similar
  
William Jolly Bridge, Sir Leo Hielscher Bridges, Brisbane River, Kurilpa Bridge, Victoria Bridge - Brisbane

The Go Between Bridge, formerly known as the Hale Street Link, is a toll bridge for vehicles, pedestrians and cyclists over the Brisbane River in inner-city Brisbane, Queensland, Australia. The bridge connects Merivale and Cordelia Streets in West End to Hale Street and the Inner City Bypass at Milton. It is Brisbane's first inner-city traffic bridge in 40 years and carries around 12,000 vehicles per day. The bridge opened to traffic in the early hours on 5 July 2010 and is now operated by Transurban.

Contents

The Go Between Bridge is named after the popular Australian indie rock band The Go-Betweens, which was formed in Brisbane. The bridge is part of Campbell Newman's TransApex transport plan. It extends the Inner City Bypass across the Brisbane River.

A charity concert featuring Robert Forster from the Go-Betweens and other singers was held on 25 June, followed by a community open day on 4 July 2010.

Driving the go between bridge


Protests

The bridge was unpopular with many residents of West End, and with some parents from the West End State school who were concerned about increased traffic and air pollution. The "Stop the Hale Street Bridge Alliance" was formed to voice these concerns. At the start of the bridge's construction two protesters were arrested for allegedly writing graffiti on a wall surrounding the project site.

Construction

Construction began in July 2008 and the project was completed in early July 2010. The bridge was built by The Hale Street Link Alliance (HSLA) which consisted of four companies; Bouygues Travaux Publics, Macmahon Holdings, Seymour Whyte Holdings and Hyder Consulting. During construction, lane closures on Coronation Drive caused delays for motorists and resulted in temporary changes to associated public transport services. The final concrete pour for the main bridge span occurred on 2 December 2009. The construction cost for the bridge was A$338 million.

Bridge structure

The Go Between Bridge is a four-lane bridge with dedicated pedestrian and cycle pathways. It is a three span, twin concrete box girder structure built using balanced cantilever construction. The main bridge span is 117 metres long, supported by two river piers located 74 metres north and 80 metres south of the abutments on each river bank. The pathways are 3.6 metres wide and designed for equitable access. A pedestrian pathway is located on the eastern (city) side of the bridge and a cycleway on the western (Toowong) side. As the Go Between Bridge is steep, the pedestrian path is being built as a separate structure at a lesser grade. This allows for the path gradient to comply with equitable and disabled access requirements.

Naming

A naming competition for the bridge was held through the website www.NameThatBridge.com, with eleven shortlisted suggestions put to a "popular vote". The winning name was announced on 29 September 2009.

Robert Forster later said, "When Grant and I sat around in 1978 thinking about the things we'd get from being in a rock band, a bridge wasn't one of them. It's not the actual bridge that's so astonishing, it's driving down roads that have those big signs like Ipswich, Gold Coast, and seeing Go Between Bridge. But really nice ... and a bridge is a beautiful thing. It's nicer than a Go-Between sewage works."

Toll

Initially the Brisbane City Council planned to recover the cost of the bridge by collecting a toll of $2.70 per vehicle. However, due to budget savings this amount was reduced to $1.50 until the end of 2010, then for the first six months of 2011 it cost $2.00, rising to $2.35 plus CPI from July 2011. The bridge features free-flow tolling with electronic tag and video matching payment options. Transurban has a 50 year lease to toll and operate the bridge.

Patronage

In July 2010, 9,000 vehicles per day were using the bridge, increasing to 11,725 by mid September 2010. It was expected that this figure would rise to 17,500 by 2011 and in 2021 be 21,000 vehicles. During its first year of operation the bridge collected A$8.18 million from tolls but cost $30 million to operate. During that period the highest number of daily uses was 15,783 on 24 March 2011.