Rahul Sharma (Editor)

Ottawa Valley Railway

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Reporting mark
  
RLK

Length
  
150 miles (240 km)

Founded
  
1996

Parent organization
  
Genesee & Wyoming

Dates of operation
  
1996 (1996)–Present

Headquarters
  
North Bay, Canada

Predecessor
  
Canadian Pacific Railway

Locale
  
Ontario, Québec, Canada

Ottawa Valley Railway httpsuploadwikimediaorgwikipediacommonsthu

Track gauge
  
4 ft 8 ⁄2 in (1,435 mm) standard gauge

Website
  
www.gwrr.com/operations/railroads/north_america/ottawa_valley_railway

Ottawa valley railway ovr 430 verner on


Ottawa Valley Railway (reporting mark RLK) is a Canadian railroad that operates 150 miles (240 km) of track in the provinces of Ontario and Quebec, and is owned by Genesee & Wyoming Canada Inc., the Canadian subsidiary of Genesee & Wyoming Inc.

Contents

The railroad began operations on 30 October 1996 under the auspices of RaiLink Canada, and fell under the control of RailAmerica after that company bought RaiLink in July 1999. It was formed to operate both local trains and through-service Canadian Pacific Railway trains between Sudbury, Ontario and Smith Falls, Ontario. On July 23, 2012, Genesee & Wyoming Inc. announced that it intended to purchase RailAmerica in a deal valued at $1.39 billion. Approval of the purchase was granted by the U.S. Surface Transportation Board on December 19, 2012.

Currently, the OVR operates between Sudbury and Temiscaming, Quebec, reduced from its original routing between Sudbury and Smiths Falls with a branch to Temiscaming.

The rerouting came about as a result of the reduction of both local traffic on the line and through traffic operated by the Canadian Pacific. As traffic was reduced on other CP routes, that railroad was able to redirect trains onto its lines through Toronto, and RailAmerica's lease on the line to the east of Petawawa, Ontario ended in December 2009. The OVR continued operating the route between Sudbury and Temiscaming, and in early October 2010, RailAmerica and CP reached a new agreement under which those operations would continue, while CP would continue procedures for ending service to the east of Mattawa. On 3 August 2011, it was announced that the rails between Renfrew and Pembroke, Ontario were planned to be removed by the end of the year, with the remainder of the Mattawa—Smiths Falls route to be removed in following years.

The OVR interchanges with the Canadian Pacific at Sudbury, as well as with the Canadian National Railway at North Bay, Ontario, the Ontario Northland Railroad at North Bay, and the Huron Central Railway at Sudbury.

The railroad once hauled around 70,000 carloads a year, the majority of which came from CP's intermodal bridge traffic. The rest of it was self-generated, and included chemicals and forest products. Very little of this traffic came from east of Mattawa. As of 2013, carloadings amount to approximately 8,000 per year.

Ottawa valley railway ovr 430 romford coniston on


References

Ottawa Valley Railway Wikipedia