Bloor GO Station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Owned by
  
Metrolinx

Connections
  
Dundas West (TTC)

Station code
  
GO Transit: BOGO

Province
  
Ontario

Connection
  
Dundas West

Platforms in use
  
2

Tracks
  
3 + 1 bypass

Parking
  
None

Opened
  
1974

Owner
  
Metrolinx

Rebuilt
  
2015

Bloor GO Station

Location
  
1456 Bloor Street West Toronto, Ontario Canada

Address
  
Toronto, ON M6P 4G4, Canada

Similar
  
Weston GO Station, Toronto Pearson Terminal, Dundas West, Malton GO Station, Etobicoke North GO Station

Triple meet at bloor go station


Bloor GO Station is a railway station on GO Transit's Kitchener line and Union Pearson Express rail services, located in Toronto, Ontario, on Bloor Street east of Dundas Street West. It is near Dundas West station on the TTC's Bloor–Danforth line, but is not directly connected to it.

Contents

Go transit f59ph 564 departing bloor go station


Overview

The station is located north of Bloor Street West between Lansdowne Avenue and Dundas Street West. Bloor Street dips down here to cross under all the tracks, and the station is reached by stairs from its north sidewalk.

Bloor station serves eastbound and westbound Kitchener line and UP Express trains on the Weston Subdivision, locally oriented northwest-southeast. Following the Georgetown South railway expansion in 2015, the Weston subdivision is designed to have four tracks with two island platforms, each with a high-level section for the UP Express and a low-level section for the Kitchener line. However, as of 2016, the line only has three tracks, making the northernmost platform effectively a side platform.

Parallel to these tracks along their southwest side, is the Galt Subdivision which carries the Milton line. There is no platform for Milton line services, so those trains pass by the station without stopping. GO has considered adding the station to the Milton line, but it is not in current plans.

Until 1996 there was an additional parallel track on the northeast side of the station which belonged to the Canadian Pacific Railway and was used for access to local industries. Its former right-of-way is now used for the West Toronto Railpath, providing a pedestrian and cyclist connection to the neighbourhoods to the north, east, and south. Covered bicycle parking is located at the station's entrances from the path. Bloor is one of the few GO stations which does not have any parking for cars.

Prior to the introduction of Union Pearson Express, only 200 passengers used the station per day, a number which was expected to increase to 1,000 with the opening of the UP Express. Metrolinx is projecting 2,000 riders will use the station daily by 2031. UPX president Kathy Haley said 25 per cent of UPX riders are expected to use Bloor Station.

Georgetown South Expansion

Bloor station was substantially rebuilt as a part of the Georgetown South railway expansion project to allow for Union Pearson Express service. The formerly 2-track Weston Subdivision was expanded to 4 tracks, and the former side platforms became island platforms. High-level sections were added at the southeast end of each platform near Bloor street for use by the Union Pearson Express, and the low-level sections for the Kitchener line were correspondingly lengthened at the northwest end.

Other improvements to the station include an indoor concourse at street level with a staffed ticket booth, elevators, heated shelters, bicycle storage and signage.

In February 2016 a kiss-and-ride was opened at Dundas Street West and Edna Avenue, connecting to a new second entrance to the station.

Connection to Dundas West station

Dundas West subway station has only a single entrance, on Dundas Street, so passengers connecting to Bloor station must walk eastward for some 200 metres along city streets. Since the subway platforms happen to extend eastward from the station entrance, a direct tunnel from the GO station to the east end of the subway station would be relatively short. In March 2011 when Metrolinx announced the station expansion plans associated with the Georgetown South Project, the second entrance to the station was to have a direct connection to the Dundas West subway platforms. In the fall of 2012 when construction began, work did not include an underground TTC connection, which was to be completed instead in 2017. However, in March 2016, Metrolinx officials said it will take five years to build a tunnel between the two stations because of the need to expropriate property.

References

Bloor GO Station Wikipedia