Trisha Shetty (Editor)

Big Tujunga Dam

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
United States

Type of dam
  
Concrete arch

Length
  
505 ft (154 m)

Opened
  
1931

Impound
  
Big Tujunga Creek

Opening date
  
1931

Impounds
  
Big Tujunga Creek

Height
  
63 m

Catchment area
  
212.4 km²

Big Tujunga Dam httpsuploadwikimediaorgwikipediacommonsthu

Location
  
Angeles National Forest, Los Angeles County, California

Owner
  
Los Angeles Department of Water and Power

Similar
  
Big Tujunga Creek, Pacoima Dam, Tujunga Wash, Cogswell Dam, Santa Anita Dam

Big Tujunga Dam is a concrete arch dam in Los Angeles County, California, spanning Big Tujunga Creek northeast of Sunland. Completed in 1931 by the Los Angeles Department of Water and Power, it serves mainly for flood control. The dam was originally planned as one of several similar flood-control dams inside Big Tujunga Canyon and was thus referred to as Big Tujunga Dam No. 1 until the large Hansen Dam was completed in 1940, eliminating the need for the other components of the original project.

Contents

Map of Big Tujunga Dam, Tujunga, CA 91042, USA

Its reservoir is called Big Tujunga Reservoir, and has a capacity of 5,960 acre·ft (7,350,000 m3). Although it is located inside the Angeles National Forest, public access to the lake is forbidden. The water is kept at a low level except during the rainy season. Because of the small storage capacity of the reservoir, it has filled completely with sediment on several occasions, including 1969 and 2011; as a result frequent dredging is required to keep the dam operational.

Seismic retrofit projectEdit

In 1976, the dam was recognized as in danger of failure from earthquakes (the San Andreas Fault runs nearby) and the reservoir's level was temporarily restricted to about 25% of capacity. Approximately 75,000 cu yd (57,000 m3) of concrete was added to the dam, transforming it from a thin-arch to a thick-arch design. A new spillway was built and the original one was expanded, increasing the release capacity from 23,000 cu ft/s (650 m3/s) to more than 90,000 cu ft/s (2,500 m3/s). The seismic retrofit project was completed in July 2011 at a cost of $100 million.