Supriya Ghosh (Editor)

Arlberg railway

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Native name
  
Arlbergbahn

Locale
  
Tyrol Vorarlberg

Line number
  
101 05

Status
  
Operational

Stations
  
31

Owner
  
Austrian Federal Railways

Arlberg railway wwwbahnerlebnisclubdeuploadspicsArlbergbahn

Type
  
Heavy rail, Passenger/Freight rail Intercity rail, Regional rail, Commuter rail

Terminis
  
Bludenz railway station, Innsbruck Hauptbahnhof

H0 layout of mec bregenz arlberg railway


The Arlberg Railway (German: Arlbergbahn), which connects the Austrian cities Innsbruck and Bludenz, is Austria's only east-west mountain railway. The 135.7 km line is considered one of Europe's most problematic mountain railways, in part because it is threatened by avalanches, mudslides, rockfalls and floods. It is operated by the Austrian Federal Railways (ÖBB) and frequented by international trains, including the Orient Express.

Contents

History and Construction

As early as 1842 a railway over the Arlberg Pass was under discussion, as the British sought a rail connection for traffic from England to Egypt. Two years later, in 1847, Carl Ganahl - a textile industrialist from Feldkirch - decided to privately support construction of the railway, despite the many technical challenges involved. On the other hand, the opening of the Semmering Railway in 1854 showed that mountain railways were basically possible and feasible. Trade Minister Anton Freiherr von Banhans presented on March 22, 1872, at the Chamber of Deputies a draft law on the execution of the Arlberg railway at government expense for a total amount of 42 million florins. In 1879 the protagonists of the Arlbergbahn with the intended 10,270 m long summit tunnel were successful. The submitted project had won confidence by the progress in the Gotthard Tunnel Julius Lott was appointed planning director of the Arlbergbahn.

The costs were 38,165,282 crowns.

The construction of the Arlberg Railway started on June 20, 1880, and proceeded at a faster pace than planned. Completion was originally not expected until the autumn of 1885, but already by May 29, 1883, the valley route from Innsbruck to Landeck in Tyrol was put into service. On September 21, 1884 the entire stretch of the mountain railway was completed, including the then single-track, 10.25 kilometres (6.37 mi) long Arlbergtunnel. The construction claimed 92 lives. The costs were totaled 38,165,282 crowns. The Arlberg tunnel rises from St. Anton on a length of approximately 4 km with 2 ‰. The highest point is at 1310.926 m in kilometer 104.241 m. Then it falls to Langen am Arlberg at 15 ‰.

Operation

The transalpine Arlberg Railway opened up a completely new connection between Lake Constance and the Adriatic Sea. Traffic increased so rapidly that already by July 15, 1885 a second track through the tunnel was opened, as had been planned since the beginning of the project. The most renowned train on the Arlberg route was the Orient Express, from London to Bucharest, which had only first-class compartments and parlors.

Right from the beginning, the use of steam locomotives on the Arlberg led to serious problems: Passengers and crews were exposed to the unhealthy effects of sulfurous acid, which condensed from the steam in the tunnel. Grade slopes of up to 3.1% on the western ramp and 2.6% on the eastern ramp caused traction troubles for the locomotives. Finally, in 1924, this problem was eliminated with the completion of electrification of the tunnel, followed by the ramp sections in 1925. This electrification of the railway was carried out with a 15 kV, 16.7 Hertz system, allowing heavy trains to be pulled over the route once the tracks and supporting structures, including the Trisanna bridge in 1964, had been upgraded for the increased axle weights.

Today, traffic through the Arlberg railway tunnel has increased considerably, despite competition from road transport through the Arlberg Road Tunnel. This has made it necessary to widen the approach ramps for double tracks. Many long-distance, high-speed EuroCity and Railjet trains ply the route from Vienna to Vorarlberg over the Arlberg. On the occasion of the World Ski Championships in 2001, the railway station of St. Anton on the eastern side of the Arlberg Tunnel was completely reconstructed and the tunnel itself extended by several hundred feet.

Steam locomotives

From the universal locomotive, kkStB Class 73 with an operating weight of 55.1 tons, 436 pieces were ordered. Thanks to its capacity of 700 PS they could transport in the plane 1,650 tons with 30 km/h, on a slope of 10 ‰ a weight of 580t with 15 km/h and on a slope of 25 ‰ 220t, also with 15 km/h. They were mainly used for freight traffic.