Puneet Varma (Editor)

USS Orion (AS 18)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Name
  
USS Orion (AS-18)

Laid down
  
31 July 1941

Commissioned
  
30 September 1943

Construction started
  
31 July 1941

Length
  
162 m

Awarded
  
30 December 1940

Acquired
  
30 September 1943

Decommissioned
  
3 September 1993

Launched
  
24 June 1942

USS Orion (AS-18) USS Orion AS 18

Builders
  

At sea on the uss orion as 18


USS Orion (AS–18) was a Fulton-class submarine tender of the United States Navy. She was laid down 31 July 1941 at the Moore Dry Dock Company, Oakland, California; launched 24 June 1942; sponsored by Mrs. Robert A. White; and commissioned 30 September 1943, Capt. C. S. Isgrig in command.

Contents

USS Orion (AS-18) Home USS Orion AS18 Veterans Historical Organization

World War II, 1943–1945

USS Orion (AS-18) httpsuploadwikimediaorgwikipediacommonsthu

Following shakedown off southern California, Orion got underway for Pearl Harbor on 23 November 1943. Arriving there on the 28th, she received her first submarine, Gar (SS-206) alongside for repairs two days later. On 10 December she steamed for Australia, arriving at Fremantle 5 January 1944 to begin her mission of maintaining the material readiness of, and an adequate stock of supplies for, submarines operating in the southwest Pacific. She remained in Western Australia until 6 August 1944 when she proceeded to Mios Woendi, Indonesia to establish Advanced Submarine Base Able. Arriving 26 August 1944, she serviced 24 submarines, and 466 surface vessels, before being relieved, 9 December 1944, by Griffin (AS-13).

USS Orion (AS-18) FileUSS Orion AS18 SSBN1 Italy 1983jpeg Wikimedia Commons

The next day Orion headed back to Hawaii for overhaul. On 8 April 1945 she sailed west again. At Saipan between 23 April and 1 September 1945, she served as CTG 17.7 and as SOPA (Admin) for Tanapag Harbor in addition to her tender and repair activities which were performed for over 300 ships.

Post-war, 1945–1993

USS Orion (AS-18) USS ORION AS18 Deployments amp History

As the formal surrender documents were being signed in Tokyo Bay, Orion was en route to the United States. Assigned to the Atlantic Fleet, she operated off the east coast for four months, then sailed south to Balboa, C. Z. Taking up duties with SubRon 6, 24 January 1946, she remained in the Panama Canal Zone, with one interruption for overhaul, until 11 May 1949. Then, with SubRon 6, she steamed to Norfolk, her new homeport.

After that change of homeport, Orion continued to service SubRon 6 at Norfolk and, during fleet exercises, in the Caribbean Sea. A FRAM II overhaul and conversion to nuclear support, 6 September 1960 – 25 February 1961, was followed by refresher training off Cuba. In June; her first nuclear submarine job came alongside in the form of Shark (SSN-591). Three years later she added foreign nuclear submarines to her long list of services performed after completing work on HMS Dreadnought. Support of SubRon 6, however, continued to be Orion’s primary mission. Into 1970 she serviced the conventional and nuclear-powered ships of that squadron from the Destroyer/Submarine Piers at Norfolk.

Orion served SUBRON 4 out of Charleston Naval Base, Pier November during the 1970s.

Orion again changed homeport to La Maddalena, Italy, servicing ships of the Sixth Fleet in the Mediterranean Sea until 1993, when she was relieved by the Simon Lake. Orion returned to the United States and was decommissioned 3 September 1993. Ex-Orion was transferred to the Maritime Administration for storage 1 May 1999 and sold to North American Ship Recycling, Baltimore, Maryland to be dismantled on 27 July 2006.

At the time of her decommissioning in 1993, Orion was the oldest active ship in the US Navy's fleet. Accordingly, she flew the "Don't Tread On Me" flag toward the end of her service.

References

USS Orion (AS-18) Wikipedia