66.8 GWh

Construction began
  
1987

Country
  
Portugal

Opening date
  
1993

Operator
  
Energias de Portugal

Impound
  
Limia

Touvedo Dam 1bpblogspotcomOsasuUyp2usT0F5Gab7cOIAAAAAAA

Location
  
municipality Ponte da Barca, Viana do Castelo District

Purpose
  
Power, irrigation, flood control

Spillway capacity
  
3,200 m3/s (110,000 cu ft/s)

Dam volume
  
74,620 m3 (2,635,000 cu ft)

Similar
  
Alto Lindoso Dam, Pocinho Dam, Régua Dam, Miranda Dam, Salamonde Dam

Touvedo Dam (Portuguese: Barragem de Touvedo) is a concrete gravity dam on the Limia. It is located in the municipality Ponte da Barca, in Viana do Castelo District, Portugal.

Contents

Construction of the dam began in 1987. The dam was completed in 1993. It is owned by Companhia Portuguesa de Produção de Electricidade (CPPE). The dam is used for power generation, irrigation and flood control.

Dam

Touvedo Dam is a 42.5 m tall (height above foundation) and 133.5 m long gravity dam with a crest altitude of 55 m. The volume of the dam is 74,620 m³. The spillway with 3 cradial gates is part of the dam body (maximum discharge 3,200 m³/s). There is also a bottom outlet which can discharge up to 50 m³/s.

Reservoir

At full reservoir level of 50 m the reservoir of the dam has a surface area of 1.72 km² and a total capacity of 15.5 mio. m³. The active capacity is 4.5 (4.0) mio. m³. Minimum operating level is 47.5 m.

The reservoir of Touvedo Dam serves as lower reservoir for the Alto Lindoso pumped-storage power plant.

Power plant

The hydroelectric power plant was commissioned in 1993. It is operated by EDP. The plant has a nameplate capacity of 22 MW. Its average annual generation is 66.8 (61, 67, or 78) GWh.

The power station contains one Kaplan turbine-generator with 22.2 MW (24 MVA) in a dam powerhouse located on the left side of the dam. The turbine rotation is 187.5 rpm. The minimum hydraulic head is 20 m, the maximum 25 m. Maximum flow per turbine is 100 m³/s.

The turbine and generator were provided by GEC-Alstom.