Trisha Shetty (Editor)

Sri Damodaram Sanjeevaiah Thermal Power Station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
India

Operator(s)
  
APGENCO

Phone
  
040 2384 0270

Status
  
Under Construction

Primary fuel
  
Coal-fired

Sri Damodaram Sanjeevaiah Thermal Power Station

Location
  
Nellore, Andhra Pradesh

Owner(s)
  
Andhra Pradesh Power Development Company Limited (APPDCL)

Address
  
Nelatur Village, Andhra Pradesh 524344

Construction cost
  
84.32 billion INR (US$1.3 billion)

Similar
  
Thermal Powertech Corporati, NCC Power Project Li, APGENCO Nellore, Simhapuri Energy Limited, Meenakshi Energy Power Pl

Sri Damodaram Sanjeevaiah Thermal Power Station is located in Nelatur Village, near Krishnapatnam and at a distance of 23 km from Nellore city of Andhra Pradesh. The power plant is one of the coal-based power plants of Andhra Pradesh Power Development Company Limited (APPDCL). It is the Special Purpose Vehicle (SPV), a joint venture company of APGENCO (with 50% equity) and IL AND FS (50% equity) partnership.

The proposed capacity of plant is 1600 MW. The project is under construction and likely to be completed by the end of 2014. The Power station is designed for blended coal in the ratio of 70% washed domestic coal from Talcher Coalfield to 30% imported coal. Sea water is proposed for cooling purpose and potable water by desalination. Krishnapatnam port (about 5 km from site) will cater to the requirement of importing heavy machinery and both domestic & imported coal of 3.5 and 1.5 million tons per annum respectively. EPC contract for the main plant has been awarded to BHEL, L&T and Tata Projects Limited during July,2008 and for BOP during February 2009. The estimated complete cost of project is about Rs 8432/- Crores. The Debt & Equity ratio is 80:20 and Project is being financed by PFC and KfW, Germany.

Etymology

In view of the exemplary Statesmanship and dedicated services rendered to the state by late Sri.Damodaram Sanjeevaiah, Former Chief Minister of Andhra Pradesh, the Govt.of Andhra Pradesh ordered ∃∈ m a t h | m v a r | 1600 MW Thermal Power Project proposed to be established at Nelatur, Krishnapatnam, Nellore Dist be named as "Sri.Damodaram Sanjeevaiah Thermal Power Station".

References

Sri Damodaram Sanjeevaiah Thermal Power Station Wikipedia