Biking portland springwater corridor trail portland oregon august 21 2015


The Springwater Corridor Trail is a bicycle and pedestrian rail trail in the Portland metropolitan area in Oregon, United States. It follows a former railway line of the same name from Boring through Gresham to Portland, where it ends south of the Eastbank Esplanade. Most of the trail, about 21 miles (34 km) long, is paved, though about 1 mile (1.6 km) overlaps city streets in Sellwood, and about 2 miles (3 km) near Boring has recently been paved. A large segment roughly follows the course of Johnson Creek and crosses it on bridges many times. Much of the corridor was acquired by the City of Portland in 1990; remaining segments were acquired by Metro thereafter.

Contents

Springwater Corridor KarhuUSA Springwater Corridor Portland Oregon Karhu Story

The trail is part of the Portland area's 40 Mile Loop trail system. It connects to many adjacent or nearby parks, including Tideman Johnson Natural Area, Powell Butte, and others.

Springwater Corridor Springwater Corridor 39Avenue of Terror39

Springwater corridor homeless camper talks about life on the trail


History

The Springwater Division rail line was named for a planned connection to Springwater, Oregon.

Springwater Corridor httpsoregonencyclopediaorgmediauploadsSprin

The Portland Traction Company operated rail service from Portland to Boring from 1903 until 1989. Passenger service peaked in 1906 and ended in 1958. Oaks Amusement Park—and five other city parks—were built to encourage weekend passenger traffic. Freight trains brought farm produce into Portland.

Springwater Corridor Find a Park The City of Portland Oregon

When the Oregon Department of Transportation (ODOT) began a project to widen Oregon Highway 99E, a new, expensive overpass was required for the rail line. Citing low traffic volumes, construction was refused and the line was put up for sale. This was of great interest to the 40-Mile Loop Trust, a conservation effort formed in 1981 to build a trail around Portland connecting its many parks. Planned since 1904, it had made little progress. The Trust proved effective at getting many key governmental agencies to work with each other. Its representatives called upon the Southern Pacific and Union Pacific railroads, co-owners of the abandoned line, to transfer the land to the Trust. This matter was subject of a battle between on-line railroad shippers and Metro. However, by 1990, the deal was completed, and represented a significant step in the completion of the Loop.

Springwater Corridor As Springwater Corridor shooting shows homelessness on the rise in

During master planning in 1991 for conversion, the projected use of the corridor was 400,000 people annually, distributed as 56% bicycling, 36% walking, 9% jogging, and 3% equestrian. By 2003, usage was expected to exceed one million users per year.

Prior to paving, much of the trail was suitable for mountain biking.

Springwater Corridor Springwater Corridor creates tension over its use recreation or

Construction of the east–west segment of the trail between Oregon Highway 99E and Gresham was completed in 1996. An additional mile east of Gresham was built in 2000. In 2005, a 3-mile (4.8 km) north–south "Springwater on the Willamette" segment opened between central Portland and the Sellwood Bridge along the Willamette River. Unlike the other sections of the trail, the rail line remained, separated by a fence. The line is currently operated by the Oregon Pacific Railroad.

In 2003, Portland was one of 25 cities that received a $200,000 grant from Active Living by Design to promote urban planning that encourages physical activity. Some of the money was allocated to a Lents Station interpretive trailhead along the Springwater Corridor. The last significant section of the trail was completed ahead of schedule in summer 2006, when the construction of three new bridges over Johnson Creek, Oregon Highway 99E and a railroad line, allowing users to cross them without having to detour and mix with traffic on busy streets.

In 2006, the City of Portland rejected a development proposal for a property that did not include an easement for a greenway along the Willamette River, and would have prevented completion of a planned connection between the Springwater Trail and the Eastbank Esplanade. The easement requirement was upheld by the Oregon Court of Appeals on February 13, 2008.

As of 2012, a one-mile gap in the Sellwood area remained, but there were plans to reduce it. This segment was one of the parks and trails recommended for funding by a Metro advisory panel in 2001.

In late 2013, paving was completed on a 2.25 miles (3.62 km) stretch from Rugg Road to Boring Station Trailhead Park. The vegetation removal for the project started in July 2013 and was completed on December 2, 2013. The paving project cost was $1.9 million. There is a proposal to continue this trail to connect the 40 Mile Loop to the Pacific Crest Trail via the proposed Cazadero Trail.

Homeless camps

A longstanding controversy about the corridor involves camping by homeless people. In an article published in early 2016 by Bike Portland, aggression by campers toward bicyclists using the trail increased between 2011 and 2016. Cyclists—citing verbal threats, broken glass on the trail, trash in the adjacent greenery, and signs of illegal drug use—expressed concerns for their personal safety. On the other hand, a recent Idaho court decision and a more strict anti-discrimination Oregon law made law enforcement officers reluctant to take action. At issue was the possibility that homelessness might itself become criminalized and punished in violation of the Eighth Amendment to the United States Constitution. In September 2016 the City of Portland removed about 100 campers from settlements along a 14-mile (23 km) stretch of the corridor in the southeast part of the city. Despite protests by the campers, the removal went "relatively smoothly though many campers said they had no other place to go and it remained unclear what impact the sweep had on the city’s overall issue of homelessness." The total number of homeless men, women, and children in Multnomah County, including Portland, has been estimated at about 4,000, including about 1,800 who generally sleep outside.