Supriya Ghosh (Editor)

Skymetro

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Number of lines
  
1 double track line

System length
  
1.1 km (0.68 mi)

Number of stations
  
2

Operator(s)
  
Zurich Airport

Locale
  
Zürich Airport

Transit type
  
Skymetro Skymetro Wikipedia

Began operation
  
November 2002 (test run)September 2003 (official opening)

Zurich airport skymetro


The Zurich Airport Skymetro is an underground airport people mover at Zurich Airport in Switzerland. The 1.1 km (0.68 mi) long system connects the airport's main Airside Center with its mid-field Terminal E, passing underneath Runway 10/28. The line opened in September 2003, and was constructed by the Otis Elevator Company.

Contents

Skymetro Zurich Airport Skymetro to Terminal E Switzerland Tourism

As of 2010, Skymetro was carrying 6.73 million passengers per year, and is claimed to be the most used cable way in Switzerland. With a cost of 176 million Swiss francs it is also the most expensive cable car system and one of the most complex with high safety standards.

Skymetro X017 AirsideCenter DockE Skymetro ZrichFlughafen Standseilbahn

The tunnels of the Skymetro are equipped with Zoetrope-like films displayed on the sides, with each film consisting of a series of still frames in rapid succession, accompanied by matching sound effects played over the vehicles public address system. Over time, various films have been shown, including ones based around the fictional character Heidi and the Matterhorn mountain. However, as of late 2012 these films are no longer displayed. Instead, two new films have been made for the system. The first of the two new films shows a mid-aged woman (holding an ice axe), and her younger son (holding an apple) appeared as of late 2012, while the other replacement film shows a man waving the flag of Switzerland.

Skymetro httpsuploadwikimediaorgwikipediacommonsee

Irse at zurich airport s skymetro on 11 november 2016


History

Skymetro The Skymetro at Zurich Airport runs with an optical Genius bus

Construction of the Skymetro tunnels started in 2000 and was completed in 2001. The first test run was undertaken in November 2002, and the line became operational in September 2003. As built, the line used three trains, each made up of two cars.

Skymetro FileZurich Airport Skymetro 03jpg Wikimedia Commons

In 2009, the Skymetro was remodelled as part of a construction project known as Zurich 2010, which mainly involved the centralization of Security control. Arriving and departing passengers from the Schengen Area and as well as passengers from non-Schengen airports are segregated and transported in separate cabins. Walls in the stations ensure the separation of the 'tested' and 'untested' passengers after the security checks. To allow for this division the trains were expanded from two to three cars. For the expansion Swiss cable car companies were used: the three new chassis derived from Bartholet in Flums, the cabins from Gangloff in Bern and Altdorfer SISAG company supplied the electrical controls.

Technology

Skymetro Ride on the quotSkymetroquot at Zrich Kloten Airport YouTube

Vehicles on the parallel 1,138 m (3,734 ft) long guideways are drawn by steel cables and float on an approximately 0.2 mm (0.0079 in) thick air cushion generated by on board air compressors, running over a smooth concrete guide way as in other Otis Hovair installations. Service is provided by a total of nine cars, which operate in three trains of three cars each, with each train carrying up to 157 passengers.

Trains can run in a pinched loop configuration, with trains reversing direction at each end onto the opposite track. Alternately a shuttle service can be operated, with a single train shuttling backwards and forwards on one track, or a double-shuttle service with one train on each track. In order to allow this flexibility, the traction cables are arranged into five loops: one in each of the main tunnels driven by 465 kW motors, one in each of the reversing lines driven by 266 kW motors, and one in the maintenance siding driven by a 55 kW motor. The trains can engage with, and switch between cables using hydraulic horizontally movable clamps.

The maximum speed of a Skymetro train is 47.9 km/h (29.8 mph), and the journey time between Airside Centre and Terminal E is 3 minutes.

References

Skymetro Wikipedia