Girish Mahajan (Editor)

Silver State South Solar Project

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
United States

Status
  
Under construction

Site area
  
2,900 acres

Owner
  
First Solar

Location
  
Clark County

Type
  
Flat-panel PV

Nameplate capacity
  
250 MW

Construction began
  
3 September 2014

Silver State South Solar Project wwwbasinandrangewatchorgimagesSilverStateSma

Similar
  
Alamosa Solar Generatin, Catalina Solar Project, California Flats Solar Project, DeSoto Next Generatio, Desert Sunlight Solar Farm

The 250 MW Silver State South Solar Project is a photovoltaic power station which is being constructed by subcontractors for First Solar. Construction is expected to be complete in 2016. The plant will be owned and operated by a subsidiary of NextEra Energy Resources, and power will be sold to Southern California Edison.

The project occupies approximately 2,900 acres of public lands and is located adjacent to Primm, Nevada, in the Jean Lake/Roach Lake Special Recreation Management Area (SRMA).

References

Silver State South Solar Project Wikipedia