enXco

Construction began
  
May 2012

Status
  
Operational

Operator(s)
  
enXco

Catalina Solar Project c1cleantechnicacomwpenginenetdnasslcomfiles2

Location
  
Kern County, California

Commission date
  
Phase 1: December 2012, phase 2: August 2013

Similar
  
Alamosa Solar Generatin, DeSoto Next Generatio, Silver State South Solar Proj, California Flats Solar Project, Genesis Solar Energy Pr

The Catalina Solar Project is a 143.2 megawatt (MW) photovoltaic power station located near Bakersfield, Kern County, California, owned by enXco, an EDF Énergies Nouvelles Company. It covers area of 445 hectares (1,100 acres).

Construction began in May, 2012 and was fully completed in August, 2013. It use thin-film PV panels bought from Solar Frontier (CIGS type) and First Solar (CdTe type).

Phase 1 had a nameplate capacity of 60 MW and was connected to the grid in December, 2012.

enXco has signed a 25-year Power Purchase Agreement (PPA) with San Diego Gas & Electric (SDG&E) for the production from the station.