Puneet Varma (Editor)

Salamonde Dam

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Official name
  
Barragem de Salamonde

Status
  
Operational

Surface area
  
242 ha

Purpose
  
Power

Opening date
  
1953

Impound
  
Salamonde Dam

Location
  
municipality Vieira do Minho, Braga District, Portugal

Owner(s)
  
Companhia Portuguesa de Produção de Electricidade

Address
  
Peneda-Gerês National Park, CM1361, Portugal

Similar
  
Barragem da Venda Nova, Caniçada Dam, Alto Rabagão Dam, Ponte da Mizarela, Bemposta Dam

Barragem alto rabag o pis es montalegre portugal


Salamonde Dam (Portuguese: Barragem de Salamonde) is a concrete arch dam on the Cávado River, where the river forms the border line between the districts of Braga and Vila Real. It is located in the municipality Vieira do Minho, in Braga District, Portugal.

Contents

The dam was completed in 1953. It is owned by Companhia Portuguesa de Produção de Electricidade (CPPE). The dam was designed by Coyne et Bellier.

DamEdit

Salamonde Dam is a 75 m tall (height above foundation) and 284 m long arch dam with a crest altitude of 281 m. The volume of the dam is 93,000 m³. The dam features a spillway with 4 gates over the dam (maximum discharge 1,700 m³/s) and one bottom outlet (maximum discharge 130 m³/s).

ReservoirEdit

At full reservoir level of 280 m (maximum flood level of 280.5 m) the reservoir of the dam has a surface area of 2.42 (2.36) km² and a total capacity of 65 mio. m³; its active capacity is 56.3 (55 or 57) mio. m³. With the 55 mio. m³ water 26.9 GWh can be produced.

Salamonde IEdit

The hydroelectric power plant went operational in 1953. It is operated by EDP. The plant has a nameplate capacity of 42 MW. Its average annual generation is 231.2 (175, 232 or 244) GWh.

The power station contains 2 Francis turbine-generators with 21.8 MW (25 MVA) each in an underground powerhouse. The turbine rotation is 428 rpm. The minimum hydraulic head is 78 m, the maximum 125 m. Maximum flow per turbine is 22 m³/s. The turbines and generators were provided by Voith.

Salamonde 2Edit

In 2011 Alstom has been awarded a contract by EDP to install a 207 MW Francis reversible pump turbine and a 244 MVA motor-generator in a new pumped-storage power plant. The new power plant is expected to go operational in August 2015. Its average annual generation is estimated to be 386 GWh.