Harman Patil (Editor)

STS 92

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Mission type
  
ISS assembly

SATCAT no.
  
26563

Apogee
  
394,000 m

Landing date
  
24 October 2000

Operator
  
NASA

COSPAR ID
  
2000-062A

Period
  
1.5 hours

Launch date
  
11 October 2000

Dates
  
11 Oct 2000 – 24 Oct 2000

STS-92 Crew STS92

Mission duration
  
12 days, 21 hours, 43 minutes, 47 seconds

Spacecraft
  
Space Shuttle Discovery

Launch mass
  
115,127 kilograms (253,812 lb)

Members
  
Brian Duffy, Pamela Melroy, Koichi Wakata, William S. McArthur, Peter Wisoff, Michael López-Alegría, Leroy Chiao

Space shuttle flight 100 sts 92 post flight presentation


STS-92 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Discovery. STS-92 marked the 100th mission of the Space Shuttle. It was launched from Kennedy Space Center, Florida, 11 October 2000.

Contents

STS-92 STS92 KSC Electronic Photo File

Sts 92 launch nasa footage


Spacewalks

STS-92 httpsspaceflightnasagovgalleryimagesshuttl

  • Chiao and McArthur – EVA 1
  • EVA 1 Start: 15 October 2000 – 14:27 UTC
  • EVA 1 End: 15 October 2000 – 20:55 UTC
  • Duration: 6 hours, 28 minutes
  • López-Alegría and Wisoff – EVA 2
  • EVA 2 Start: 16 October 2000 – 14:15 UTC
  • EVA 2 End: 16 October 2000 – 21:22 UTC
  • Duration: 7 hours, 07 minutes
  • Chiao and McArthur – EVA 3
  • EVA 3 Start: 17 October 2000 – 14:30 UTC
  • EVA 3 End: 17 October 2000 – 21:18 UTC
  • Duration: 6 hours, 48 minutes
  • López-Alegría and Wisoff – EVA 4
  • EVA 4 Start: 18 October 2000 – 15:00 UTC
  • EVA 4 End: 18 October 2000 – 21:56 UTC
  • Duration: 6 hours, 56 minutes
  • Mission highlights

    STS-92 FileSTS92 landingjpg Wikimedia Commons

    STS-92 was an ISS assembly flight that brought the Z1 truss, Control Moment Gyros, Pressurized Mating Adapter-3 (PMA-3) (mounted on a Spacelab pallet) and two DDCU (Heat pipes) to the space station.

    STS-92 Wwwspacepatchesinfo Shuttle STS92

    The Z1 truss was the first exterior framework installed on the ISS and allowed the first U.S. solar arrays to be temporarily installed on Unity for early power during flight 4A. The Ku-band communication system supported early science capabilities and U.S. television on flight 6A. The CMGs (Control Moment Gyros) weigh about 27 kilograms (60 lb) and provide non-propulsive (electrically powered) attitude control when activated on flight 5A, and PMA-3 provides shuttle docking port for solar array installation on flight 4A and Lab installation on flight 5A.

    The mission included seven days of docked operations with the space station, four EVAs, and two ingress opportunities.

    STS-92 sts92 Space Patch Database

    Over the course of four scheduled spacewalks, two teams of space walkers and an experienced robot arm operator collaborated to install the Z1 (Z for zenith port) truss structure on top of the U.S. Unity connecting node on the growing station and to deliver the third Pressurized Mating Adapter (PMA 3) to the ISS for the future berthing of new station components and to accommodate shuttle dockings.

    The Z1 truss was the first permanent lattice-work structure for the ISS, very much like a girder, setting the stage for the future addition of the station's major trusses or backbones. The Z1 fixture also served as the platform on which the huge U.S. solar arrays were mounted on the next shuttle assembly flight, STS-97.

    The Z1 contains four large gyroscopic devices, called Control Moment Gyroscope (CMGs), which are used to maneuver the space station into the proper orientation on orbit once they were activated following the installation of the U.S. laboratory.

    During the fourth spacewalk, astronauts Wisoff and López-Alegría tested the SAFER jet backpack, flying up to 50 feet while remaining tethered to the spacecraft.

    References

    STS-92 Wikipedia