Puneet Varma (Editor)

STS 97

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Mission type
  
ISS assembly

SATCAT no.
  
26630

Apogee
  
365,000 m

Dates
  
30 Nov 2000 – 11 Dec 2000

Operator
  
NASA

COSPAR ID
  
2000-078A

Period
  
1.5 hours

Launch date
  
1 December 2000

Landing date
  
11 December 2000

STS-97 STS97 KSC Electronic Photo File

Mission duration
  
10 days, 19 hours, 58 minutes, 20 seconds

Distance travelled
  
7,203,000 kilometres (4,476,000 mi)

Spacecraft
  
Space Shuttle Endeavour

Members
  
Brent W. Jett Jr., Michael J. Bloomfield, Joseph R. Tanner, Marc Garneau, Carlos I. Noriega

STS-97 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Endeavour. The crew installed the first set of solar arrays to the ISS, prepared a docking port for arrival of the Destiny Laboratory Module, and delivered supplies for the station's crew.

Contents

STS-97 httpsuploadwikimediaorgwikipediacommonsthu

2000 space shuttle flight 101 sts 97 endeavour nasa


Spacewalks

STS-97 Spaceflight mission report STS97

  • Tanner and Noriega – EVA 1
  • EVA 1 Start: 3 December 2000 – 18:35 UTC
  • EVA 1 End: 4 December 2000 – 02:08 UTC
  • Duration: 7 hours, 33 minutes
  • Tanner and Noriega – EVA 2
  • EVA 2 Start: 5 December 2000 – 17:21 UTC
  • EVA 2 End: 5 December 2000 – 23:58 UTC
  • Duration: 6 hours, 37 minutes
  • Tanner and Noriega – EVA 3
  • EVA 3 Start: 7 December 2000 – 16:13 UTC
  • EVA 3 End: 7 December 2000 – 21:23 UTC
  • Duration: 5 hours, 10 minutes
  • Mission highlights

    STS-97 STS97 Wikiwand

    During the 11-day mission, the primary objective was completed, which was to deliver and connect the first set of U.S.-provided solar arrays to the International Space Station. The astronauts completed three spacewalks, during which they prepared a docking port for arrival of the Destiny Laboratory Module, installed Floating Potential Probes to measure electrical potential surrounding the station, installed a camera cable outside the Unity Module, and transferred supplies, equipment and refuse between Endeavour and the station.

    STS-97 STS97 KSC Electronic Photo File

    On Flight Day 3, Commander Brent Jett linked Endeavour to the ISS while 230 statute miles above northeast Kazakhstan.

    The successful checkout of the Extravehicular Mobility Units (EMUs), the Simplified Aid For EVA Rescue (SAFER) units, the Canadarm (RMS), the Orbiter Space Vision System (OSVS) and the Orbiter Docking System (ODS) were all completed nominally. Also, the ODS centerline camera was installed with no misalignment noted.

    STS-97 STS97 Second Spacewalk NASA

    From inside Endeavour, Canadian Mission Specialist Marc Garneau used the Canadarm to remove the P6 truss from the payload bay, maneuvering it into an overnight park position to warm its components. Mission Specialists Joseph Tanner and Carlos Noriega moved through Endeavour's docking tunnel and opened the hatch to the ISS docking port to leave supplies and computer hardware on the doorstep of the Station. On flight day 4, the Expedition 1 Commander William Shepherd, Pilot Yuri Gidzenko and Flight Engineer Sergei Krikalev – entered the Unity Module for the first time and retrieved the items left for them.

    At 09:36 EST on 8 December 2000 the crew paid the first visit to the Expedition 1 crew residing in the space station. Until then the shuttle and the station had kept one hatch closed to maintain respective atmospheric pressures, allowing the shuttle crew to conduct their spacewalks and mission goals. After a welcome ceremony and briefing, the eight spacefarers conducted structural tests of the station and its solar arrays, transferred equipment, supplies and refuse back and forth between the spacecraft, and checked out the television camera cable installed by Tanner and Noriega for the upcoming mission.

    On 9 December 2000 the two crews completed final transfers of supplies to the station and other items being returned to Earth. The Endeavour crew bade farewell to the Expedition 1 crew at 10:51 EST and closed the hatches between the spacecraft. After being docked together for 6 days, 23 hours and 13 minutes, Endeavour undocked from the station at 14:13 EST. Piloted by Michael Bloomfield, it then made an hour-long, tail-first circle of the station. The undocking took place 235 statute miles above the border of Kazakhstan and China. The final separation burn took place near the northeast coast of South America.

    STS-97 was the 15th flight of Endeavour and the 101st Space Shuttle mission.

    Wake-up calls

    NASA began a tradition of playing music to astronauts during the Gemini program, which was first used to wake up a flight crew during Apollo 15. Each track is specially chosen, often by their families, and usually has a special meaning to an individual member of the crew, or is applicable to their daily activities.

    References

    STS-97 Wikipedia