Puneet Varma (Editor)

Nidd Aqueduct

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Length
  
32 miles (51 km)

Principal engineer
  
Morrison & Mason Ltd

Start point
  
Scar House Reservoir

Status
  
Open

Date completed
  
1899

Nidd Aqueduct httpss3postimgorgl1cdovxw3NiddAqueductjpg

Original owner
  
Bradford Corporation Water Works

End point
  
Chellow Heights water treatment plant, West Yorkshire

The Nidd Aqueduct is an aqueduct or man-made watercourse in Yorkshire, England. It feeds water from Angram and Scar House reservoirs in upper Nidderdale, North Yorkshire 32 mi (51 km) to Bradford in West Yorkshire. The aqueduct supplies 21,000,000 imp gal (95,000 m3) of water per day to Chellow Heights water treatment works. The aqueduct and the reservoirs it connects to are all maintained by Yorkshire Water.

Contents

History

In 1892 Parliamentary Powers were granted for the City of Bradford to dam the River Nidd and its tributary Stone Beck in upper Nidderdale, and to build a conduit that delivered the water by gravity to Chellow Heights in Bradford. As Bradford has no major rivers running through it, the city needed fresh water for drinking and to be able to process wool (fulling). At that time, both Nidderdale and Bradford were in the West Riding of Yorkshire.

The first reservoir (Gouthwaite) was started in 1893 so that the water supply to the lower Nidd valley would not be interrupted when work on the upper dams began. In 1904 Bradford Water Works Corporation initiated the building of the next two reservoirs in the scheme in upper Nidderdale. Scar House and Angram reservoirs were constructed by James Watson and Lewis Mitchell respectively. The aqueduct was constructed by Morrison & Mason Ltd.

Route

The aqueduct starts on the south bank of Scar House Reservoir a few metres west of the dam. It tunnels under Rain Stang hill for 2,486 yards (2,273 m) at a depth of 484 feet (148 m), and re-appears at Armathwaite Gill. There is then a short overground section across How Stean Beck before another tunnel, 1,408 yards (1,287 m) long, below Heathfield Moor. The aqueduct then tunnels below Greenhow Hill, 380 feet (120 m) below the summit, for 6,204 yards (5,673 m) before re-appearing at Skyreholme, near Appletreewick. It crosses the River Wharfe between Barden and Bolton Abbey, and then Barden Beck near Barden Beck Bridge. It then heads across open land again, crosses the A59 at Bolton Abbey Railway Station and runs to Chelker Reservoir above Addingham.

The aqueduct then descends into Airedale and crosses first the Leeds Liverpool Canal over Mauds Bridge in Bingley, then Bingley South Bog Site of Special Scientific Interest. It passes underneath the A650 dual carriageway and crosses the River Aire at Cottingley. It then goes up to Chellow Heights where the water is stored.

Construction

The route of the aqueduct is mostly sub-surface, apart from some small sections that drain water into the aqueduct. It was constructed from 12 miles (19 km) of cut-and-cover, 15 mi (24 km) of steel and cast-iron pipes and 6 miles (10 km) of branch feeder pipes. The route is entirely fed by gravity and the use of syphons. These also pick water up from other becks and streams in Nidderdale that the aqueduct crosses. The aqueduct is over 6 feet (1.8 m) high inside and is lined with concrete.

The only evidence of the aqueduct is in the various crossing bridges and syphons where the route goes across other bodies of water. Most of the exposed sections of the aqueduct have crenelated walls and towers. The bridge over the River Wharfe at Barden Beck is now used by walkers on the Dales Way. A pump was installed at Barden on the River Wharfe that is capable of abstracting 5,000,000 imp gal (23,000 m3) of water a day into the Nidd Aqueduct and bolster the supply to Bradford.

The section through Greenhow Hill was 3.5 mi (5.6 km) long and was completed in 1899. This was beneficial to the lead miners there as it would drain away excess water from their mineworkings.

Another pipe was added alongside the original in 1920. Ten years later, the original pipe was found to be 30 inches (760 mm) out of alignment where it runs underneath Bingley South Bog. The 1920 pipe is elevated above the bog on concrete supports, but the original pipe was laid 10 feet (3.0 m) down underneath the bog surface. The pressure from the bog was forcing the pipe out of alignment and was in danger of interrupting the water supply.

References

Nidd Aqueduct Wikipedia