Kalpana Kalpana (Editor)

NOAA 19

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Mission type
  
Weather satellite

COSPAR ID
  
2009-005A

Mission duration
  
2 years

Launch date
  
6 February 2009

Inclination
  
98.97°

Launch mass
  
1,440 kg

Operator
  
SATCAT no.
  
33591

Spacecraft type
  
Inclination
  
98.97°

Period
  
1.7 hours

Launch mass
  
1,440 kg

NOAA-19 brainwagon First Weather Picture from NOAA19

Similar
  
NOAA‑18, NOAA‑15, NOAA‑17, NOAA‑16, Suomi NPP

NOAA-19, designated NOAA-N' (NOAA-N Prime) prior to launch, is the last of the United States National Oceanic and Atmospheric Administration's POES series of weather satellites (which was scheduled to be replaced by the next-generation NPOESS series before the NPOESS project was cancelled). NOAA-19 was launched on February 6, 2009.

Contents

NOAA-19 NOAA19 MCIRprecip composite DK3WN SatBlog

Launch

NOAA-19 NOAA19 Satellite Precipitation Measurement Missions

On November 4, 2008, NASA announced that the satellite had arrived at Vandenberg aboard a C-5 Galaxy military transport aircraft. Installation of the payload fairing took place January 27, 2009; second stage propellant was loaded on 31 January.

NOAA-19 NOAA19 composite image DK3WN SatBlog

Several attempts were made to conduct the launch. The first attempt was scrubbed after a failure was detected in a launch pad gaseous nitrogen pressurization system. The second attempt was scrubbed after the failure of a payload fairing air conditioning compressor, which is also part of the ground support equipment at the launch pad.

NOAA-19 Weather Satellite Images for thessaloniki greece

The satellite was successfully launched at about 2:22 a.m. PST. February 6, 2009 aboard a Delta II flying in the 7320 configuration from Vandenberg Air Force Base.

Instruments

NOAA-19 httpsuploadwikimediaorgwikipediacommonsthu

NOAA-N Prime carries a suite of instruments that provides data for weather and climate predictions. Like its predecessors, NOAA-N Prime provides global images of clouds and surface features and vertical profiles of atmospheric temperature and humidity for use in numerical weather and ocean forecast models, as well as data on ozone distribution in the upper part of the atmosphere, and near-Earth space environments—information important for the marine, aviation, power generation, agriculture, and other communities. The NOAA-N Prime primary instruments —the Advanced Very High Resolution Radiometer (AVHRR/3), High Resolution Infrared Radiation Sounder (HIRS/4), and the Advanced Microwave Sounding Unit (AMSU-A)—were all designed for a three-year mission. The Solar Backscatter Ultraviolet Spectral Radiometer (SBUV/2) was designed for a two-year mission, and the Microwave Humidity Sounder (MHS) was designed for a five-year mission.

Damage during manufacture

NOAA-19 Lockheed Martin Workers Damage NOAA N Prime Satellite in Mishap

On September 6, 2003, the satellite was badly damaged while being worked on at the Lockheed Martin Space Systems factory in Sunnyvale, California. The satellite fell to the floor as a team was turning it into a horizontal position. A NASA inquiry into the mishap determined that it was caused by a lack of procedural discipline throughout the facility. While the turn-over cart used during the procedure was in storage, a technician removed twenty-four bolts securing an adapter plate to it without documenting the action. The team subsequently using the cart to turn the satellite failed to check the bolts, as specified in the procedure, before attempting to move the satellite. Repairs to the satellite cost $135 million. Lockheed Martin agreed to forfeit all profit from the project to help pay for repair costs; they later took a $30 million charge relating to the incident. The remainder of the repair costs were paid by the United States government.

References

NOAA-19 Wikipedia