Myitsone Dam wwwasianewsitfilesimgMYANMARkachinmyitson

Owner(s)
  
the Ministry of Electric Power No.1 of Myanmar, China Power Investment Corporation, Asia World Company Limited

Type of dam
  
Concrete faced rock-fill dam

Impounds
  
Irawaddy River(Ayeyawady River)

Impound
  
Irrawaddy River (Ayeyawady River)

Similar
  
Hatgyi Dam, Tasang Dam, Yeywa Dam, Three Gorges Dam, Xayaburi Dam

Myanmar objections to myitsone dam project


The Myitsone Dam (Burmese: မြစ်ဆုံ တာတမံ [mjɪʔsʰòʊɴ tàtəmàɴ]; lit. the Confluence Dam) is a large dam and hydroelectric power development project at the confluence of the Mali and N’mai rivers and the source of the Irawaddy River (Ayeyawady River) in Burma (Myanmar). The project is (as of 2017) suspended.

Contents

Myitsone Dam Myitsone Dam Wikipedia

If the project had been completed as planned for 2017, it would have been the fifteenth largest hydroelectric power station in the world. The dam, planned to be 1,310 metres (4,300 ft) long and 139.6 metres (458 ft) high, to be built by the Upstream Ayeyawady Confluence Basin Hydropower Company, a joint venture between the China Power Investment Corporation (CPI), the Burmese Government’s Ministry of Electric Power and the Asia World Company It is expected to provide 6,000 megawatts of electricity primarily for Yunnan, China. CPI contended that China would not be the electricity's primary market and stated that Myanmar would have first claim on the electricity generated, with the remainder sold for export. Opponents remained skeptical because most Burmese are not connected to the electrical grid, and doubted whether the dam would improve their livelihood.

Myitsone Dam China Myanmar face Myitsone dam truths Stimson Center

The dam project has been controversial in Burma due to its enormous flooding area, environmental impacts, location 60 miles from the Sagaing fault line, and uneven share of electricity output between the two countries. The Burmese public regards the Irrawaddy River as the birthplace of Burmese civilization and although the Chinese market guarantees the dam’s electricity sales, to many Burmese Myitsone represents growing Chinese influence in Burma, which they perceive as "exploitative" to the country hitherto isolated by Western economic sanctions. Even the government officials have differing opinions on the project.

Myitsone Dam The Myitsone dam China39s three options Frontier Myanmar

On 30 September 2011, amid democratic reforms in the country, President Thein Sein announced that the Myitsone dam project was to be suspended during his tenure. Because the government appears to have taken the public opinion into account, that unexpected decision is seen as a reversal to the authoritarian rule since the coup in 1962.

Myitsone Dam NLD promises to listen to public on Myitsone Dam Mekong Eye

Why such strong opposition to the myitsone dam nelson rand 4 5


Location

Myitsone Dam Burma Hopes for Foreign Investment State of Affairs

The dam site is located 3.2 kilometres (2.0 mi) mile below the confluence of the Mali River and the N'Mai River about 42 kilometres (26.1 mi) north of Myitkyina, the capital of Kachin State, in northern Burma. The source of both the N'mai and Mali Rivers is the Himalaya glaciers of northern Burma in the vicinity of 28° N. The easternmost of the two, N'mai river, is the larger stream and rises in the Languela Glacier north of Putao. It is unnavigable because of the strong current whereas the smaller western river, the Mali, is navigable, despite a few rapids.

Myitsone Dam Myitsone Dam Wikipedia

The project location is in the politically unstable Kachin State. Since 1962, the Kachin Independence Army (KIA) has been waging war against Burmese military. Despite ceasefire in 1994, clashes and bomb explosions occasionally occur near the dam site. In 2011, clashes between Burmese military and KIA intensified and the Burmese military ordered airstrikes in Northern Kachin State.

History

The Myitsone Dam is part of the Confluence Region Hydropower Project (CRHP), which includes seven dams with a total installed capacity of 20,000 MW. CRHP alone accounts for 41 percent of the total power capacity called for by a 30-year strategic plan. Outlined in 2001, the plan includes 64 hydropower plants and three coal power plants with combined installed capacity of more than 40,000 megawatts (54,000,000 hp).

The Myanmar Electrical Power Enterprise and the Agriculture and Irrigation Ministry scheduled the Irawaddy Myitsone Dam Multipurpose Water Utilization Project in 2001. The survey phase was initiated in 2003. First the government contracted the Japanese Kansai Electric Power Company to build a small weather station at Tang Hpre village, near the confluence. Chinese and Burmese contractors, including Yunnan Machinery Equipment Import & Export Company (YMEC), Kunming Hydropower Institute of Design, surveyed the dam site. In 2006, Suntac Technologies Co. Ltd., a Burmese Geographic Information System (GIS) mapping contractor set up an office at the monastery in Tang Hpre village. They also set up a temporary camp at Washawng village to facilitate transport of survey equipment from the YMEC company in China. In October, the Asia World Company built a project implementation camp on a hill top at the dam site 3 miles (4.8 km) downstream from the confluence. when the camp was complete, Chinese inspectors stayed and surveyed the area for five months. In December 2006, the Ministry of Electric Power No. 1 and the China Power Investment Corporation signed a Memorandum of Understanding for a 6,000 megawatts (8,000,000 hp) project at Myitsone and a 3,400 megawatts (4,600,000 hp) project at Chibwe.

The design phase began in 2007. The Changjiang Design Institute of China sent several groups of design personnel and conducted geological drilling, reservoir inspection and hydrological measuring near the dam site. To supply electricity for dam construction projects, a small 99 megawatts (133,000 hp), Chibwe Nge hydropower project was built in April 2007. In May, the New Light of Myanmar reported that the Ministry of Power No. 1 and CPI would build seven hydropower dams on the N'Mai and Irawaddy rivers.

On 16 June 2009, Myanmar Ambassador Thein Lwin and President of China Power Investment Corporation Lu Qizhou signed a Memorandum of Agreement between the Department of Hydropower Implementation and the China Power Investment Corporation for the Development, Operation and Transfer of the hydropower Projects in Maykha, Malikha and Upstream of Irrawaddy-Myitsone River Basins. The official opening ceremony of the dam construction phase was held on December 21.

Economics

The majority of total US$3.6 billion cost was to be covered by the China Power Investment Corporation in a joint venture with the Ministry of Electric Power No.1 of Myanmar and the Asia World Company. The Burmese government would get ten percent of the electricity generated and fifteen percent of the project shares for land use. In addition, the government would charge a withholding tax and an export tax on exported electricity to China. After a fifty-year period, the government would totally own the project. The Burmese government would earn about $54 billion by means of tax payment, power and shares, accounting for 60 percent of the total revenue of the Irrawaddy projects during the contracted 50 years, more than CPI's return on investment during the fifty years Chinese operation period according to the President of CPI. However, the government economic calculations have been criticized for not considering potential environmental and societal impacts.

Design

The dam was planned to be a concrete faced rock-fill dam 139.6 metres (458 ft) high and 1,310 metres (4,300 ft) long, and projected to produce 6,000 MW of electricity by 2017. This is equivalent to 27% of the 22,500 megawatts (30,200,000 hp) output of the Three Gorges Dam In China, the world's largest electricity-generating plant of any kind.

Minister of Electric Power Zaw Min claimed that the dam was designed to withstand an earthquake of 8.0 Richter Scale, a scale that has never been recorded to have occurred in that region, and the most devastating flood of a millennium.

Power generation

The Myitsone Dam is the largest of the seven large dams currently planned on the Mali, N'Mai and Irawaddy rivers. The China Power Investment Corporation is project manager of the Confluence Region Hydropower Projects. The seven dams combined total design installed capacity is 20,000 MW of electricity.

The dam is to provide electricity primarily to the China Southern Power Grid via its subsidiary, the Yunnan Power Grid Company, in Yunnan Province and then on to the power hungry eastern coastal areas of China, in conformity with the Chinese central Government's 'West to East Transmission Policy'. The hydropower project was being implemented under an agreement signed in late 2006 with the state-owned China Power Investment Corporation and Burma’s Ministry of Electric Power No 1. The dam and reservoir planning and construction is managed by the Burmese government in cooperation with the China Southern Power Grid and several subcontractors.

The dam would also supply ten percent of its generated electricity to the Myanmar Power Grid if needed. The Chipwi Nge Hydropower Project, which was installed to provide electricity for construction projects, began supplying electricity to Myitkyina, Chipwi, and the Myitsone Resettlement Village. However, few villagers have electrical devices. "We don’t need to buy candles, this is the only useful thing" a villager told. They prefer to have their productive land back.

Social impact

The dam was expected to flood 447 square kilometres (173 sq mi) including 47 villages near the construction site and about 11800 local people would be relocated in the newly built resettlement villages. The activists in exile stated that the dam would submerge historical temples, churches and cultural heritage sites important to Kachin identity and history and the natural heritage of the Kachin people in Myitsone area would be lost.

In response, the government reported in the state-run New Light of Myanmar that relocated villages from the project area had been provided with all forms of aids including water, electric power and buildings and that the government also helped in relocation of religious buildings. CPI reported a total expense of 4.1 billion kyats in compensation and 25 million U.S. dollars in resettlement. In addition, the government stated that the remote region would benefit greatly from the new roads and access to electricity.

Local communities pointed out other issues such as the dam's location on earthquake-prone zone. They opposed the dam site because it is less than 100 kilometres (62 mi) from the major Sagaing fault line, posing a risk to basin inhabitants if an earthquake weakened the dam or caused landslides in the reservoir. If the Irrawaddy Myitsone Dam broke during an earthquake, it would endanger the lives of hundred of thousands of people downstream in Kachin State’s largest city, Myikyina.

In response, the government said that the dam would withstand an earthquake of magnitude 8.0 Richter scale. In an interview with Xinhua News, Lu Qizhou, President of China Power Investment Corporation said that Myitsone Hydropower Station follows the standard of fortification intensity 9, two points above the intensity of Zipingbu Hydropower Station that withstood 2008 Sichuan earthquake of 8.0 Richter scale. On the other hand, Burmese scientists who carried out the environmental assessment, recommended to build two smaller dams farther upstream instead of building on earthquake-prone zone.

Environmental impact

As with other large dam projects, the Myitsone Dam construction would have altered the hydrological characteristics of the river and prevent sediment from enriching the historically highly productive agricultural floodplains downstream. This can affect fertility as far downstream as the Irrawaddy Delta, the major rice-producing area of Myanmar. The government responded that officials had taken sediment accumulation into consideration, and that the Myitsone dam would have capabilities to discharge the accumulated sediment.

Other consequences of flooding by the reservoir include loss of farmland and loss of spawning habitat as some migratory fish will be able to swim upstream after dam completion. This would lead to lost income for fishermen according to Kachin environmental activist groups in exile. On the other hand, research by Biodiversity And Nature Conservation Association (BANCA) contradicts the activists' statement. BANCA's research asserts that commercial fishing is not reported from the project area. But it confirms that some resident aquatic species will be affected by the change in hydrological conditions.

Ecological concerns focus on the inundation of an area that is the border of the Indo-Burma and South Central China biodiversity hotspot. The Mali and N'mai River confluence region falls within the Mizoram-Manipur-Kachin rainforests. Nevertheless, the dam would increase the shipping capacity of Irrawaddy River. The floods, currently an annual occurrence, would only occur once every twenty years. Since the hydropower is the renewable and green energy, the energy produced by the dam would decrease the need for air-polluting sources of energy such as fossil fuels. The construction and the maintenance of the dam would have employed a large number of people.

Opposition

In Burma, the Irrawaddy river, on the bank of which major historic cities such as Bagan were built, is considered as the birthplace of Burmese civilization. For that reason, The Burmese public protests against the dam project, which would inevitably alter hydrological characteristics of the historic river. Moreover, the growing Chinese influence in Burma is seen as exploitative by Burmese people, due to its association with previous military junta.

On the other hand, local villages have opposed the project since its proposal in 2001. According to the environmental organization International Rivers based in the US, in 2007, 12 local leaders from Kachin State sent a letter to Senior General Than Shwe and the junta’s Ministry of Electric Power, asking for the project to be cancelled. The Burma Rivers Network also sent a letter to the Chinese government asking Chinese companies operating in Burma to conduct environmental and social impact assessments, to release information publicly, and to consider opinions of affected communities in the decision-making process. In a parliamentary session, government minister Zaw Min responded that environmental impact had been carried out by the Biodiversity And Nature Conservation Association (BANCA) at a cost of $1.25 million and stated that Myitsone Dam Project was started only when the government had studied the possible environmental impacts. However, the results of BANCA's assessment were not disclosed publicly.

Outside Burma, activists in exile have actively carried out protests in various countries. In February 2010, the UK-based Kachin National Organization (KNO) protested against construction of the dam in front of the Burmese Embassies in the UK, Japan, Australia, and the United States. Leaked United States diplomatic cables by Wikileak revealed that U.S. embassy in Yangon funded some of the activist groups.

Within the country an activist has been detained for what local authorities said were unrelated charges. Land rights activist and politician Daw Bauk Ja was arrested for medical negligence in 2013, though the case against her had been withdrawn years earlier.

Skirmishes have been broken out between Kachin Independence Army and Burmese military over the dam issue since June 2011. On April 17, 2010, three bombs exploded close to the site of dam, reportedly killing four Chinese workers. The Burmese government blamed Kachin Independence Army for planting the bombs. KIA has denied having anything to do with the Myitsone bombing.

Domestic campaigns against the project are brought together by political activists including Nobel peace prize laureate Aung San Suu Kyi who called for reevaluation, conservationists, scholars, poets and journalists. Local media openly criticized the lack of transparency in dam project. Journalists argued that the deal was agreed by previous government without considering public opinions.

Despite the opposition, Minister Zaw Min for the Ministry of Electric Power responded to the press that the government would continue this project up to the completion. But, in September 2011 he conceded that despite promised benefits from the project, it may be appropriate to minimize the environmental impacts by redesigning the tunnel, shortening the dam's height and reducing the water storage capacity, relocating to the upstream, and reassessing environmental impacts. He also agreed that final decision should depend on the environment impact assessment report by the Ministry of Environmental Conservation and Forestry and the study by the Engineer Group.

Suspension

On 30 September 2011, in an address to the parliament, Burma's president Thein Sein announced that the Myitsone Dam project would be halted during the term of his government. The letter from the president consisted of ten points including,

As our government is elected by the people, it is to respect the people’s will. We have the responsibility to address public concerns in all seriousness. So construction of Myitsone Dam will be suspended in the time of our government. Other hydropower projects that pose no threat will be implemented through thorough survey for availability of electricity needed for the nation. I would like to inform the Hluttaws that coordination will be made with the neighbouring friendly nation, the People’s Republic of China, to accept the agreements regarding the project without undermining cordial relations.

The decision was universally acclaimed by environmentalists, political activists and the locals alike. It is considered as "a rare reversal" in that for the first time, the government had listened to the people in face of public opposition. Western nations including EU and the United States welcome the President's decision.

In response, Chinese Foreign Ministry spokesman Hong Lei stated that the Chinese government has urged the Burmese government to protect the legal and legitimate rights and interests of Chinese companies. He reminded that the Myitsone Dam is a jointly invested project between China and Myanmar, and one that has been thoroughly examined by both sides. He also confirmed that the matters would be resolved through friendly consultation. The president of CPI, Lu Qizhou, has warned that a halt in construction could lead to legal action.

In October 2011, Myanmar Foreign Minister traveled to Beijing to settle the dispute.

Aftermath

On 2 April 2012, Weekly Eleven news, a private Burmese news journal, broke news of ongoing activities by CPI and Asia World on the Myitsone project site. In April 2012, a leaked government document stated that work on the dam has continued, with work to officially resume within 6 months. The letter is a request for the Kachin State government to provide temporary ID cards for 500 engineers and the tax-free import of 10,000 tons of construction equipment (cement, trucks, bulldozers, excavators). The Kachin State government responded that the letter is a forgery. However, uncertainties exist as Chinese workers remain present in the area.

In March 2012, villagers who had been evicted from the dam work site in 2009 to 2010 and had returned to reclaim their original homes, were forcibly evicted by the Burmese army.

Analysis

Although the President Thein Sein's decision has been widely applauded, experts caution that Sino-Burma relation could be ultimately harmed by the suspension. Nicholas Farrelly, a Southeast Asia specialist at the Australian National University in Canberra said that while there would inevitably be some short-term damage to bilateral relations, pragmatism would override any potential for long-term animosity. The issue is further exacerbated by the massacre of 13 Chinese sailors near Burma-Thailand border. However, should the project be terminated entirely, the Burmese government would face legal and financial liability associated with the investments and prior agreements.

Internationally, the suspension is considered as one of the democratic reforms along with other engagements such as dialogues with pro-democracy leader Aung San Suu Kyi and release of some political prisoners. Marie Lall, a BBC South Asia analyst attributes Burma's bid for the ASEAN chair in 2014, the needs to reform the economy for ASEAN Free Trade Area and the government's desire to win the election in 2015 as the main motives of the reforms.