Mossyrock Dam

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Construction began
  
1965

Type of dam
  
Concrete, arch-gravity

Length
  
1,648 feet (502 m)

Opened
  
1968

Create
  
Riffe Lake

Operator
  
Tacoma

Opening date
  
1968

Impounds
  
Cowlitz River

Height
  
185 m

Catchment area
  
2,699 km²

Construction cost
  
117.8 million USD

Mossyrock Dam httpsuploadwikimediaorgwikipediacommonsthu

Location
  
Lewis County, Washington, USA

Similar
  
Riffe Lake, Mossyrock Park, Cowlitz Falls Dam, Taidnapam Park, Mayfield Lake Park

Mossyrock Dam is a concrete arch-gravity dam on the Cowlitz River near Mossyrock in Lewis County, Washington. The reservoir created by the dam is called Riffe Lake and the primary purpose of the dam is hydroelectric production while flood control is secondary. The dam is the tallest in Washington State and its hydroelectric power station supplies 40% of Tacoma Power's electricity.

Contents

Map of Mossyrock Dam, Mossyrock, WA 98564, USA

HistoryEdit

The Mossyrock Dam was originally planned in the 1940s but opposition from local fishers and Washington State's Game Department delayed construction. During World War II, the city of Tacoma purchased its electricity from the Bonneville Power Administration and Seattle which would cost as much as $1 million a year. To generate its own electricity, Tacoma City Light, now known as Tacoma Power would build several dams including the Mossyrock Dam. Plans for the Mossyrock Dam were announced in 1948 but met stiff opposition. The Washington State Legislature enacted a fish sanctuary on the Cowlitz River that initially blocked the project. The City of Tacoma then went to court and after the case was before the U.S. Supreme Court three times, the dam was approved. Construction began in 1965 and ended in 1968. On October 13, 1968, the dam's power plant generated its first electricity.

Power plantEdit

The Mossyrock Dam's power plant contains 2 x 150 MW Francis turbine hydroelectric generators totaling a 300 MW capacity. The generators are fed by three penstocks ranging from 248 – 285 ft. feet long. One of the three penstocks is unused as the plant has an additional space for one more generator.

Power plant upgradeEdit

In 2006, GE Energy was selected to upgrade both of the power plant's generators. The $50 million project included replacing the turbines, stators, wicket gates and transformers among other improvements. Installation of the first generator began in 2008 and was completed and commissioned in 2009. The second generator was completed in late 2010. The power plant upgrade increased the total capacity by 70 MW and it should operate around 95% efficiency.