Kalpana Kalpana (Editor)

Marylebone station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Location
  
Marylebone

Managed by
  
Chiltern Railways

Station code
  
MYB

Opened
  
27 July 1898

London borough
  
City of Westminster

Local authority
  
City of Westminster

Owner
  
Network Rail

DfT category
  
A

Number of platforms
  
6

Marylebone station

Address
  
Great Central House, Melcombe Pl, Marylebone, London NW1 6JJ, UK

Similar
  
London Paddington station, Birmingham Moor Street railway st, Baker Street tube station, Euston railway station, Birmingham Snow Hill station

1960s uk trains marylebone station


Marylebone station (/ˈmɑːrlbən/ MAR-li-bən) is a central London railway terminus and connected London Underground station in the Marylebone area of the City of Westminster. On the National Rail network it is also known as London Marylebone and is the southern terminus of the Chiltern Main Line to Birmingham. On the Underground it is on the Bakerloo line between Edgware Road and Baker Street. It is in Travelcard Zone 1.

Contents

The station opened in 1899 as the London terminus of the Great Central Main Line, the last major railway to open in Britain in over 100 years, linking the capital to the cities of Nottingham, Sheffield and Manchester. Marylebone was the last of London's main line termini to be built, and is one of the smallest, having opened with half the number of platforms originally planned. It has limited connections to the Underground as it was built after the main tube lines in the area.

Marylebone station suffered from a lack of traffic and after the GCML closed in 1966, it gradually declined in use. By the 1980s, Marylebone was threatened with closure, but was reprieved due to continued commuter traffic on the London to Aylesbury Line (a remaining part of the GCML) and from High Wycombe. In 1994 the station found a new role as the terminus of the Chiltern Main Line. Following privatisation, the station was expanded with two additional platforms in 2006 and improved services to Birmingham Snow Hill. In 2015 services began between Marylebone and Oxford Parkway via a new chord connecting the main line to the Oxford to Bicester Line, with an extension to Oxford following in 2016.

Marylebone is well-known as a square on the British Monopoly board, and because of its relative quietness compared to other London termini is popular for filming.

Archive vhs 1986 marylebone station down the line to saunderton


Location

The station stands on Melcombe Place just north of Marylebone Road, a straight west-to-east thoroughfare through Marylebone in central London; Baker Street is close by to the east and south east. It is in the northern, Lisson Grove, neighbourhood of the district, in a northern projection of the Bryanston and Dorset Square ward immediately south of St Johns Wood. North-east is Regent's Park, north in a network of mostly residential streets is Lord's Cricket Ground and south, south-west and south-east are a mixed-use network of streets. Other nearby London termini are Euston and Paddington.

The London Bus routes 2, 13, 18, 27, 30, 74, 82, 113, 139, 189, 205, 274 and 453 and night routes N13, N18, N74 and N205 serve the station.

National Rail

The main line station has six platforms; two built in 1899, two inserted into the former carriage road in the 1980s, and two built in September 2006. It is the only non-electrified terminal in London. Marylebone is operated by Chiltern Railways (part of Deutsche Bahn AG), making it one of the few London terminal stations not to be managed by Network Rail.

Chiltern Railways operates all services at the station, accessing the Chiltern Main Line and London to Aylesbury Line routes which serve High Wycombe, Aylesbury, Bicester, Banbury, Leamington Spa, Warwick, Solihull, Birmingham Moor Street, Birmingham Snow Hill, and (at peak hours) Stourbridge Junction and Kidderminster. There are services to Oxford via the Oxford to Bicester Line, and some services to Stratford-upon-Avon via the Leamington to Stratford branch line.

GCR and LNER

The early history of Marylebone is tied into the Great Central Railway's Great Central Main Line extension into London. When Sir Edward Watkin became chairman of the Manchester, Sheffield and Lincolnshire Railway in 1864, the line was not particularly lucrative as it had no direct connection to London. Watkin was unhappy about transferring traffic to the Great Northern Railway, and when he became chairman of the Metropolitan Railway in 1872, he decided to build a dedicated line between the MS&LR and Central London.

The approach to Marylebone was the last section of the Great Central Main Line to be built. Progress was delayed in the 1890s because of objections, particularly as the line would pass through Lord's, the principal cricket ground in London and home of Marylebone Cricket Club. Watkin promised that Lord's would not be disrupted by the railway construction, and an Act to complete the line was passed on 28 March 1893. The station was built on a 51-acre (21 ha) site around Blandford and Harewood Squares, west of Regent's Park. More than 4,000 working-class people were evicted from their homes to turn Harewood Avenue and Rossmore Road into approach roads; around 2,600 of them were rehomed in new apartments near St. John's Wood Road. Watkin resigned the chairmanship in 1894 following ill health, and was replaced by Lord Wharncliffe. The approach to the station through Lord's was achieved by a cut and cover tunnel constructed between September 1896 and May 1897, avoiding the cancellation of any cricket.

The station opened to coal traffic on 27 July 1898 and to passengers on 15 March 1899. It was the terminus of the GCR's London extension main line – the last major railway line to be built into London until High Speed 1. The Great Central Railway linked London to High Wycombe, Aylesbury, Rugby, Leicester, Nottingham, Sheffield and Manchester. Local services from northwest Middlesex, High Wycombe and Aylesbury also terminated at Marylebone. The GCR moved its headquarters to Marylebone from Manchester in 1905.

The station was designed by Henry William Braddock, a civil engineer for the Great Central Railway. Owing to the GCR's lack of money, the station's design is simple and modest. The main booking hall was 63 feet (19.2 m) by 40 feet 6 inches (12.3 m). It is a domestic version of the "Wrenaissance" revival style that fits in with the residential surroundings with Dutch gables, employing warm brick and cream-coloured stone. The GCR crest was worked into the wrought iron railings in numerous places.

The original plan was for eight platforms, but half were designated as a "possible future extension". The cost of building the GCR was far higher than expected, nearly bankrupting the company. The line leading to the station cut through 70 acres (28 ha) of middle class housing, including the Eyre Estate in St John's Wood and the area around Lord's, drawing protests and requiring a relocation of the track and station facilities. There was never enough money for the extra platforms, and only four were built, three inside the train shed and one to its west (platform 4). As a result, the concourse is unusually long and had three walls for most of the 20th century. The northern wall was missing, as the GCR anticipated that the other four platforms, under an extended train shed, would be built later on. (This land was later filled with office blocks). The cost of the London Extension meant that the adjoining Great Central Hotel, designed by Sir Robert William Ellis, was built by a different company. The hotel operated for a relatively short time and was converted to offices in 1945, becoming the headquarters of British Rail from 1948 to 1986. The offices were restored as a hotel in 1993.

The GCR constructed an engine shed at the site in 1897, but it was short lived. A locomotive servicing area, consisting of a turntable and coaling stage remained in use until the end of steam traction at the station in 1966.

Passenger traffic on the GCR was never heavy because it was the last main line to be built and had difficulty competing against longer-established rivals (especially the Midland Railway from its terminal at St Pancras) for the lucrative intercity passenger business. Low passenger traffic meant Marylebone was the quietest and most pleasant of London's termini. The GCR was unhappy about having to use part of the Metropolitan Railway's route to reach Marylebone, and opened a new line to High Wycombe on 2 April 1906. The additional suburban services generated traffic for the station, which had previously been so empty on occasion that the staff outnumbered passengers. While passenger traffic remained relatively sparse, the line was heavily used for freight, especially coal; in 1914, 67% of traffic was goods-related. Trains ran from the north and East Midlands to the freight depot adjoining the station, which was marginally the largest in London.

The heyday of the line was between 1923, when the GCR was absorbed into the London and North Eastern Railway and 1948, when the LNER was nationalised to form the British Rail Eastern Region. As a result, many prestigious locomotives, such as Flying Scotsman, Sir Nigel Gresley, and Mallard which ran on the East Coast Main Line, were frequent visitors to the line. Special trains ran on the line to destinations such as Scotland. The station's busiest use came after the construction of Wembley Stadium in 1923, when it was used to contain large crowds wishing to see the FA Cup Final. Special services ran from Marylebone to the British Empire Exhibition at Wembley Park the following year.

Unlike other London terminii, Marylebone saw little direct damage during the Blitz. It was closed between 5 October and 26 November 1940 after the approach tunnels were breached, and the goods depot was bombed on 16 April 1941.

British Rail

After nationalisation in 1948, British Railways attempted to keep Marylebone open as a long-distance station and introduced the Master Cutler service to Sheffield and the South Yorkshireman to Bradford, but they were not well-used. From 1949, all local services towards High Wycombe and Princes Risborough were routed into Marylebone, although the frequency of trains was reduced two years later.

The Great Central Main Line duplicated the route of the Midland Main Line and long-distance trains from Marylebone were scaled back from 1958, leading to the closure of the Great Central Main Line north of Aylesbury on 4 September 1966 in the Beeching Axe.

The rundown of services began after the line was transferred from British Railways' Eastern Region to the London Midland Region, although the station and the first few miles of its route had been part of the Western Region from 1950. In 1958, the Master Cutler was diverted to London King's Cross and the East Coast Main Line. In 1960 all express services were discontinued, followed by freight in 1965. From then until closure, only a few daily long-distance "semi-fast" services to Nottingham remained. Marylebone's large goods yard was closed and sold to the Greater London Council for housing. The last long-distance service ran on 4 September 1966, except for a brief reprieve the following year when Paddington was undergoing signal works.

Marylebone was then the terminus for local services to Aylesbury and High Wycombe only, with some services extended to Banbury. They were switched to diesel multiple unit (DMU) operation following the phasing out of steam. British Rail Class 115 DMUs were introduced to local services in 1962. The station was transferred from the Western Region to the London Midland Region in 1973. The Great Central Railway's long-distance connection from Marylebone via High Wycombe, was closed the same year.

Closure proposals

After the 1960s, lack of investment led to local services and the station becoming increasingly run down. Marylebone was the best place in London to see heritage trains. By the early 1980s, Marylebone was under serious threat of closure. In 1983 British Rail chairman Peter Parker commissioned a report into the possibility of converting Marylebone into a 'high-speed bus way', whereby Marylebone would be converted into a coach station. The tracks between Marylebone, Harrow-on-the-Hill and South Ruislip would have closed, and converted into a road for the exclusive use of buses and coaches. British Rail services via High Wycombe would have been diverted into Paddington, and the Aylesbury services would have been taken over by London Underground on an extended Metropolitan line, and then routed to Baker Street.

BR formally announced plans to close the station on 15 March 1984, pending a statutory consultation process. Closure notices were posted at Marylebone. The proposals proved controversial and faced strong opposition from local authorities and the public, leading to a legal battle which lasted for two years. Despite the pending closure, passenger numbers only dropped by about 400 per day from 1968 levels. The conversion project proved impractical due to the headroom limitations on the line and the closure was quietly dropped.

1986 onwards – revival

The station's fortunes turned around in the late 1980s when the station came under the control of the Network SouthEast sector of British Rail. The introduction of the inter-modal and unlimited use Capitalcard (now known as the Travelcard) led to a sharp rise in commuters into London, absorbing the spare capacity at Paddington and Baker Street and eliminating the possibility of Marylebone's services being diverted.

Marylebone was reprieved from the threat of closure on 30 April 1986, and an £85 million-pound modernisation and refurbishment programme of the station and its services was granted. This was funded by selling part of the station to developers, including two of the original four platforms at the west of the station and the third span of the train shed. In order to replace these, the central cab road was removed, and two new platforms numbered 2–3 were created in its place. The run-down lines into Marylebone were modernised with new signalling and higher line speeds. In 1991, the fleet of Class 115 trains on local services was replaced by Class 165 Turbo trains, and service frequencies were increased. Services to Banbury were extended to the reopened Birmingham Snow Hill in 1994, creating the first long-distance service into Marylebone since 1966.

Privatisation

After rail privatisation, Chiltern Railways took over the rail services in 1996 and developed the interurban service to Birmingham Snow Hill. In 2002, a service to Kidderminster was opened. The line was restored to double track the same year, and Marylebone was expanded in 2006 with two extra platforms in Chiltern's Evergreen 2 project. A new platform (platform 6) was inaugurated in May 2006, while Platform 5 and the shortened platform 4 opened in September. Platforms 5 and 6 were built on the site of the goods sidings and a depot was opened near Wembley Stadium railway station.

In September 2007, the Office of Rail Regulation granted the Wrexham & Shropshire Company permission to operate services from Wrexham in North Wales via Shrewsbury, Telford and the West Midlands to Marylebone; they started in early 2008, restoring direct London services to Shropshire (Wrexham already being served by a Virgin Trains service to Euston), with five return trips per day on weekdays. This was reduced to four trains a day in March 2009. These services ceased on January 2011 after passenger number reduced; the closure was blamed on the Great Recession.

In December 2008, it was proposed to restart direct services between Aberystwyth in mid-Wales and London, which last ran in 1991, with Marylebone as the London terminus. Arriva Trains Wales announced a consultation for two services a day, following the route of the WSMR connecting with the Cambrian line at Shrewsbury. This idea was abandoned following objections by Wrexham & Shropshire.

In 2011, Chiltern Railways took over the Oxford to Bicester Town route from First Great Western, in preparation for the opening of a link from the Chiltern Main Line to the Varsity Line (on which Bicester Town station is located), which would see twice-hourly services from Marylebone to Oxford. Construction was expected to start in 2011 but was delayed until the following year after bats were found roosting in one of the tunnels on the Varsity line. Services to Oxford Parkway started in October 2015 and services to Oxford began in December 2016.

Services

As of December 2016, the typical off-peak weekday service pattern from Marylebone is:

  • Main line
  • 2 per hour to Birmingham Moor Street, one of which continues to Birmingham Snow Hill
  • 2 per hour to Oxford
  • Local
  • 1 per hour to Gerrards Cross
  • 1 per hour to High Wycombe
  • 1 per hour to Aylesbury via High Wycombe
  • 2 per hour to Aylesbury via Amersham, one of which continues to Aylesbury Vale Parkway
  • 1 per hour to Banbury
  • Additional services run in the peak hours, and some Birmingham trains extend to Kidderminster or Stourbridge Junction.

    Station facilities

    The station opened with a dining restaurant and a buffet. The restaurant was changed to a self-service operation when British Rail took over in 1948. The Victoria and Albert bar opened on 14 December 1971. In the 21st century, the concourse contains a small selection of shops.

    Accidents

    On 28 March 1913, a train leaving for High Wycombe collided with another arriving from Leicester, killing one passenger and injuring 23 people on the incoming train. The cause was blamed on the intermediate starter signal being lowered before the main starter was ready; the view of the latter was obscured by the smoke.

    On 11 December 2015, a train pulling into the station caught fire, causing it to be evacuated. The cause was believed to be a fault in its air conditioning unit.

    London Underground

    The London Underground station is on the Bakerloo line between Baker Street and Edgware Road stations and is, along with the main line station, in Travelcard Zone 1. Access is via escalators from the main line station concourse which houses the Underground station's ticket office. Until 2004 a wooden escalator led into the station, one of the last on the London Underground system that had not been replaced.

    Marylebone has direct connections with just a single tube line, unlike many other London termini such as Euston and Paddington. There is no direct interchange with the Circle line, which predates the station by more than 30 years and bypasses it to the south. The nearest stations on the Circle line are Edgware Road and Baker Street.

    History

    The underground station was opened on 27 March 1907 by the Baker Street and Waterloo Railway under the name Great Central (following a change from its intended name Lisson Grove). The railway terminated here until the extension to Edgware Road opened on 15 June. The station was renamed Marylebone on 15 April 1917. The original name still appears in places on the platform wall tiling, although the tiling scheme is a replacement designed to reflect the original scheme.

    The present entrance opened on 1 February 1943 following wartime damage to the original station building that stood to the west at the junction of Harewood Avenue and Harewood Row and the introduction of the escalators. The old building, designed by the Underground Electric Railways Company of London's architect, Leslie Green, had used lifts to access the platforms. It was demolished in 1971 and the site is occupied by a budget hotel.

    References

    Marylebone station Wikipedia


    Similar Topics