Macondo Prospect

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
Block
  
252

Operator
  
BP

Region
  
Location
  
Offshore/onshore
  
offshore

Partner
  
BP

Discovery
  
2010

Macondo Prospect Drilling the Macondo Prospect

Partners
  
BP (90%)MOEX Offshore 2007 (10%)

The Macondo Prospect (Mississippi Canyon Block 252, abbreviated MC252) is an oil and gas prospect in the United States Exclusive Economic Zone of the Gulf of Mexico, off the coast of Louisiana. The prospect was the site of the Deepwater Horizon drilling rig explosion in April 2010 that led to a major oil spill in the region.

Contents

Macondo Prospect Offshore Drilling Safety After Macondo

Name

Macondo Prospect macondo prospect Stock Videos macondo prospect Stock Footage

Oil companies routinely assign code names to offshore prospects early in the exploration effort. This practice helps ensure secrecy during the confidential pre-sale phase, and later provides convenient names for casual reference rather than the often similar-sounding official lease names denoted by, for example, the Minerals Management Service in the case of federal waters in the USA. Names in a given year or area might follow a theme such as beverages (e.g., Cognac), heavenly bodies (e.g., Mars), or even cartoon characters (e.g., Bullwinkle), but usually have no geological or geographical significance to the prospect itself.

Macondo Prospect Drilling the Macondo Prospect

The name Macondo had been the winning selection in a BP employee contest as part of an internal United Way campaign. It comes from the fictitious cursed town in the novel One Hundred Years of Solitude by Colombian Nobel Prize-winning writer Gabriel Garcia Marquez.

Location

Macondo Prospect NEWS Deepwater Horizon Incident Rigzone

The prospect is located in Mississippi Canyon Block 252 of the Gulf of Mexico. BP is the operator and principal developer of the oil field with 90% of interest, the final 10% by MOEX Offshore 2007, a unit of Mitsui. Originally, Anadarko Petroleum Corporation owned 25% stake but in October 2011 this was transferred to BP as a part of a wider settlement between the companies. The prospect may have held 50 million barrels (7.9×10^6 m3) producible reserves of oil. It is 40 miles (64 km) offshore and 130 miles (210 km) from New Orleans.

Geological target

The geological formation targeted by the well was hydrocarbon-bearing "mid-"Miocene turbiditic sands. The depth of the formation was estimated between 4000 and 4500 m below the sea floor.

History

Macondo Prospect Drilling the Macondo Prospect

A regional shallow hazards survey and study was carried out at the Macondo area by KC Offshore in 1998. High resolution, 2D seismic data along with 3D exploration seismic data of the MC 252 was collected by Fugro Geoservices in 2003. BP purchased the mineral rights to drill for oil in the Macondo Prospect at the Minerals Management Service's lease sale in March 2008.

Mapping of the block was carried out by BP America in 2008 and 2009. BP secured approval to drill the Macondo Prospect from MMS in March 2009. An exploration well was scheduled to be drilled in 2009.

On 7 October 2009 the Transocean Marianas semi-submersible rig commenced drilling, but operations were halted at 4,023 feet (1,226 m) below the sea floor on 29 November 2009, when the rig was damaged by Hurricane Ida. The Transocean Deepwater Horizon rig resumed drilling operations in February 2010.

Deepwater Horizon explosion and blowout

An explosion on the drilling rig Deepwater Horizon occurred on April 20, 2010, killing 11 workers. The Deepwater Horizon sank on April 22, 2010, in water approximately 5,000 feet (1,500 m) deep, and was located resting on the seafloor approximately 1,300 feet (400 m) (about a quarter of a mile) northwest of the well.

Following the rig explosion and subsea blowout, BP started a relief well using Transocean's Development Driller III on May 2, 2010. The relief well would potentially take up to three months to drill. BP started a second relief well using Transocean's GSF Development Driller II on May 16, 2010.

The well was successfully sealed off from flow into the sea on August 4, 2010 by a "static kill" (injection of heavy fluids and cement into the wellhead at the mudline). To further ensure the plugging of the original well, the first relief well established communication with the original wellbore near total depth and injected heavy fluids and cement. These efforts should have completely sealed off the Macondo Prospect well at that point.