Puneet Varma (Editor)

M7 motorway (Hungary)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
From:
  
Budapest

Length
  
233 km

M7 motorway (Hungary)

To:
  
Letenye A4 border with  Croatia

Counties
  
Pest County, Fejér County, Veszprém County, Somogy County, Zala County

Major cities
  
Budapest, Székesfehérvár, Nagykanizsa, Siófok, Érd, Fonyód

The M7 motorway is a Hungarian motorway which runs from Budapest towards the Croatian border at Letenye, reaching Székesfehérvár, then Siófok, a town on Lake Balaton, and the city of Nagykanizsa in the southwest of the country.

Contents

Map of M7, Hungary

The motorway connects with the Croatian motorway A4 at Goričan and forms part of the Pan-European corridor Vb, connecting Budapest with Zagreb, the capital of Croatia, and Rijeka, the largest Croatian seaport. Since the completion of the M7 it is possible to travel on motorway from Budapest to the Adriatic Sea, a popular tourist destination for Hungarians.

The last portion of the motorway to the Croatian border, including the Zrinski Bridge on the river Mura, was completed on 22 October 2008. The road's first sections were built in the 1960s and 1970s. The completion of the last sections was undertaken since 2001.

Openings timeline

  • Budapest – Budaörs (7 km): 1964 - half profile; (this section was extended 2x3 lane in 1978-79)
  • Budaörs – Martonvásár (18 km): 1966 - half profile; (this section was extended in 1972; 2x3 lane in 2001)
  • Martonvásár – Velence (15 km): 1967 - half profile; (this section was extended in 1973; 2x3 lane in 2001)
  • Martonvásár – Székesfehérvár (12 km): 1968 - half profile; (this section was extended in 1973; 2x3 lane in 2001)
  • Székesfehérvár – Balatonaliga (33 km): 1970 - half profile; (this section was extended in 1975)
  • Balatonaliga – Zamárdi (22 km): 1971 - half profile; (this section was extended in 2001)
  • Zamárdi – Balatonkeresztúr with Kőröshegy Viaduct (14,2 km): 2007.08.08.
  • Balatonszárszó – Ordacsehi (20 km): 2005.06.
  • Ordacsehi – Balatonkeresztúr (25,7 km): 2006.03.27.
  • Balatonkeresztúr – Zalakomár (21 km): 2008.06.26.
  • Zalakomár – Nagykanizsa (15 km): 2008.08.19.
  • Nagykanizsa – Sormás (11,3 km): 2007.08.24.
  • Sormás (Eszteregnye) – Becsehely (4,5 km): 2006.12.11.
  • Becsehely – Letenye (6,5 km): 2004.09.18.
  • Letenye ( border) with Zrínyi Bridge (800 m): 2008.10.22.
  • Junctions, exits and rest area

  • Distance from Zero Kilometre Stone (Adam Clark Square) in Budapest in kilometres.
  • Significant artifacts

    From Budapest to the Croatian border, the M7 motorway features the following bridges, tunnels or covered cuts:

    Bridge
  • Zrinski Bridge (Zrínyi Miklós híd; 216 m or 709 ft) over Mur river
  • Viaduct
  • Köröshegy Viaduct (Kőröshegyi völgyhíd; 1,872 m or 6,142 ft) – Longest bridge in Hungary
  • References

    M7 motorway (Hungary) Wikipedia