Los Teques Metro

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
System length
  
10.2 km (6.3 mi)

Number of lines
  
1

Transit type
  
Operator
  
Caracas Metro

Locale
  
Number of stations
  
5

Began operation
  
November 3, 2006

Los Teques Metro Metro de Los Teques Archives EnTodoNoticias

Daily ridership
  
20,000 (approx. daily average)

Track gauge
  
1,435 mm (4 ft 8 ⁄2 in) (standard gauge)

The Los Teques Metro is a suburban mass-transit system that is being built in the city of Los Teques, Venezuela with connections to important surrounding cities and communities. It was opened to public service on November 3, 2006. The Los Teques Metro currently operates one service (branded as lines 1 and 2 for the two parts of the system) connecting 5 stations, with additional stations for Line 2 under construction.

Contents

Los Teques Metro Inauguran este viernes Estacin Independencia del Metro de Los

The system connects the city of Los Teques with the capital city of Caracas. The Los Teques Metro is operated by Metro de Caracas – as such, it is effectively a subsidiary/extension of the Caracas Metro, and is widely viewed as part of that system. It is ascribed to the Venezuelan government and the Ministry of Infrastructure. The government of Miranda State and the mayorship of the Guaicaipuro Municipality are also financing its development.

The currently operating line runs for 10.2 kilometers (6.3 mi), parallel to the San Pedro River, establishing a link between Las Adjuntas and Independencia Stations.

Los Teques Metro Metro Los Teques no prestar servicio hacia Caracas dos fines de

History

Los Teques Metro httpsuploadwikimediaorgwikipediacommonsthu

The subway plans date back to 1982 when it was first proposed. However, it wouldn't be until October 19, 1998 (JOBS!) when the Metro de Los Teques transit corporation was created (now defunct) in order to carry out management, administrative duties and civil works related to the project. It was supposed to alleviate the congestion of the Panamerican Highway and ease commuting between the two cities, because of their proximity. The operation was subsequently taken over by Metro de Caracas and plans were extended to include expansion to San Antonio and a 3rd line to connect to 2nd point in Caracas.

Los Teques Metro Los Teques Metro Wikipedia

Construction for the first phase began in 2001 with works including the canalization of the San Pedro River, the tunneling and building of the bridges until reaching Las Adjuntas. It is estimated that the project cost was about 800 million US dollars.

The metro system began with restricted operations:

Los Teques Metro Este ser el horario del tren Guaicaipuro del Metro Los Teques El

  • 1 railway through a single tunnel;
  • 1 or 2 trains;
  • Monday to Friday service between 5:15 a.m. and 9:00 a.m., and later from 5:00 p.m. to 11:00 p.m.;
  • limited weekend service,
  • on November 3, 2006.

    Operations

    The second rail within the same tunnel was formally inaugurated October 22, 2007. Trial and testing period continued with additional trains and full 7 day service from 5:10 a.m. until 11:00 p.m. implemented on November 19, 2007.

    The 9.5-kilometer (5.9 mi) ride between Las Adjuntas and Alí Primera as of January 2, 2007 is 1,500 bolívares (1.5 bolívares fuertes, 75 US cents) for a one way ride and the price includes a subway ride within the Caracas Metro network.

    Los Teques Metro was provided with an integrated operation control centre, command and communications by Thales.

    Future plans

    Construction of the extension formally started March 20, 2007. This extension known as Line 2 to the system will be 12 km (7.5 mi) with 3 new stations within the city, 2 in nearby communities and finally terminating in San Antonio de Los Altos with the central Los Teques stations.

    Line 4 adds four stations that are currently under construction are:

  • Los Cerritos, inauguration TBA
  • Carrizal, inauguration TBA
  • Las Minas, inauguration TBA
  • San Antonio, inauguration TBA
  • Line 3 has been proposed 18.5 km (11.5 mi). It will commence from San Antonio and connect some communities before looping towards the La Rinconada Caracas Metro Station.

  • La Morita
  • San Diego
  • Potrerito
  • La Mariposa
  • La Rinconada