Girish Mahajan (Editor)

Leaside Bridge

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Crosses
  
Total length
  
440 m

Province
  
Body of water
  
Design
  
Opened
  
29 October 1927

Location
  
Leaside Bridge

Carries
  
6 lanes of vehicular traffic, 2 bike lanes and sidewalks for pedestrian traffic

Locale
  
East York, Ontario, Canada

Other name(s)
  
East York-Leaside Viaduct

Maintained by
  
Toronto Transportation Services

Bridge type
  
Truss arch bridge, Truss bridge

Similar
  
Hogg's Hollow Bridge, Prince Edward Viaduct, Don River, Commerce Court West, Queen's Wharf Lighthouse

Toronto travel toronto biking tour looking up at leaside bridge


The Leaside Bridge, formerly the East York Leaside Viaduct, and officially commemorated as the Confederation Bridge, spans the Don River in the City of Toronto, Ontario. The Truss bridge carrying Millwood Road was built to connect the then Town of Leaside to the then Township of East York, and was completed on October 29, 1927. The construction time of only 10 months was record breaking at the time.

Contents

Leaside bridge part 1


History

During the 1920s, as the new communities surrounding Toronto grew rapidly, several bridges were constructed to overcome the barrier of the Don Valley. Among these were the Vale of Avoca (St. Clair Avenue east of Yonge Street) and the East York – Leaside Viaduct. The town of Leaside, built by Canadian Northern Railway in the late teens and early 1920s, sought to attract investors and homebuyers. A connection over the Don Valley to the town of Todmorden Mills and on to Toronto would provide this.

Sod was turned in mid-December and active construction began in January 1927 under the direction of bridge designer Frank Barber. The bridge was rapidly assembled throughout the spring and summer, and inaugurated on October 29 as the Confederation Bridge, in honour of the sixtieth anniversary of that event. The tiled mosaic handrail was designed by New York architect Calude Bragdon with tiles supplied by Italian Mosaic and Tile Company.

In the late 1960s, as the first of numerous plans appeared to extend Leslie Street south of Eglinton, plans were initiated to widen the bridge to support six lanes of traffic. The bridge was closed beginning September 16, 1968, and reopened February 8, 1969. Girders were attached to the sides of the bridge to widen the deck to either side.

Between 2004 and 2006, the bridge was rehabilitated. The second of two contracts to rehabilitate the bridge was awarded in 2005 and included the restoration of the decorative handrail from the original 1927 design.

Facts

  • Engineer: Frank Barber
  • Associate architect: Claude Bragdon
  • Height: 45.4 metres or 143.8 feet (12½ storeys)
  • References