Koralm Tunnel

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Line
  
Koralmbahn

Work begun
  
2008

Traffic
  
railway

End
  
Sankt Andrä

Status
  
under construction

Opens
  
~2022

Length
  
32,900 m

Start
  
Frauental an der Laßnitz

Koralm Tunnel wwwbggatfiles44bigejpg

Location
  
Styria/Carinthia (Austria)

Similar
  
Koralpe, Semmering Pass, Lötschberg Base Tunnel, Gotthard Base Tunnel, Lavanttal Alps

Avvio lavori koralm tunnel


The Koralm Tunnel is a railway tunnel that is under construction in Austria under the Koralpe mountain range. It is expected to be operational by 2022.

Koralm Tunnel Koralm TBMs TunnelTalk

The tunnel will be 32.9 km (20.4 mi) long, which will make it Austria's longest railway tunnel. Running at depths of up to 1,250 m (4,100 ft) below ground, the tunnel will be a part of the 130 km (81 mi)-long Koralm Railway which will link Graz with Klagenfurt. The Koralm tunnel will be composed of two tunnels running in parallel, each capable of carrying a single railway track, which will be linked together every 500 metres (1,600 ft).

Koralm Tunnel Koralm TBMs TunnelTalk

An emergency stopping point at the middle of the tunnel is included in the plans.

Koralm Tunnel launched in Austria39s Koralm tunnel

Koralm Tunnel Jaegerbau Koralm Tunnel KAT2

Koralm Tunnel Koralm Tunnel FCP

Koralm Tunnel Promovere Koralm tunnel

References

Koralm Tunnel Wikipedia