Carries B8 road (2 lanes) Construction begin December 2010 Location Uvinza Owner Politics of Tanzania Construction end December 2013 | No. of spans 7 Total length 275 m Construction cost 56 million USD | |
![]() | ||
Engineering design by Hanil Engineering and Construction Co. Ltd (South Korea) Similar Kyaka Bridge, Wami Bridge, Songwe Bridge, Kilombero Bridge, Kirumi Bridge |
Kikwete bridge kigoma
Kikwete Bridge is a bridge currently under construction in Tanzania across the Malagarasi River.
References
Kikwete Bridge Wikipedia(Text) CC BY-SA