Puneet Varma (Editor)

Kilombero Bridge

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Carries
  
2 lanes

Construction begin
  
November 2012

Width
  
11 m

Location
  
Ifakara

Construction cost
  
53.7 billion TZS

Crosses
  
Ulanga River

Total length
  
384 m

Body of water
  
Ulanga River

Owner
  
Politics of Tanzania

Kilombero Bridge 8020photosjpgmagcom1762308146974dc898931e9pjpg

Locale
  
5 km south of Ifakara, Tanzania

Engineering design by
  
NIMETA Consult (T) Ltd & Howard Humphreys (Tanzania) Ltd

Constructed by
  
China Railway 15th Bureau Group Corporation

Similar
  
Kikwete Bridge, Kyaka Bridge, Wami Bridge, Songwe Bridge, Kirumi Bridge

Government signs construction agreement for kilombero bridge in morogoro


Kilombero Bridge is a bridge currently under construction in Tanzania. It will link the towns of Ifakara and Mahenge. Construction work began in November 2012 and is expected to complete in 24 months.

References

Kilombero Bridge Wikipedia