Carries B6 road (2 lanes) No. of spans 3 Construction cost US$ 10 million Opened November 1985 Designer COWI A/S | Construction begin 1980 Total length 223 m | |
![]() | ||
Fabrication by Cordioli & C Steel Construction S.p.A (Italy) Similar Songwe Bridge, Kyaka Bridge, Kikwete Bridge, Wami Bridge, Mkapa Bridge |
Kirumi Bridge is a cable-stayed bridge in northern Tanzania across the Mara River. Its construction was financed via a loan from the African Development Fund. It was inaugurated in October 1985 by Julius Nyerere, the country's first president.
References
Kirumi Bridge Wikipedia(Text) CC BY-SA