Godavari Bridge

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Crosses
  
Preceded by
  
The Havelock Bridge

Total length
  
4,250 m

Longest span
  
92 m

Bridge type
  
Truss bridge

Locale
  
Followed by
  
Opened
  
16 August 1974

Body of water
  
Godavari Bridge

Carries
  
Two lanes of Road and Single Railway line.

Other name(s)
  
Address
  
Godavari River, Godavari, Telangana

Location
  
Rajahmundry, West Godavari district, East Godavari district

Similar
  
Godavari River, Old Godavari Bridge, Godavari Arch Bridge, Dowleswaram Barrage, Pushkar Ghat

Indian railways dangerous longest railway godavari bridge across godavari river


The Godavari Bridge or Kovvur–Rajahmundry Bridge is truss bridge spanning Godavari river in Rajahmundry, India. It is Asia's third longest road-cum-rail bridge crossing a water body, after the Digha–Sonpur rail–road bridge in Patna, Bihar, India and Sky Gate Bridge R in Kansai International Airport, Osaka. It is second of the three bridges that span the Godavari River at Rajahmundry. The Havelock Bridge being the earliest, was built in 1897, and having served its full utility, was decommissioned in 1997. The latest bridge is the Godavari Arch Bridge, a bowstring-girder bridge, built in 1997 and presently in service.

Contents

The bridge is 4.1 kilometers (2.8 km Rail part & 4.1 km Road part) long consisting of 27 spans of 91.5 m and 7 spans of 45.72 m of which 6 spans of 45.72m are in 6 deg. curve at long Rajahmundry end to make up for the built up area. The bridge has a road deck over the single track rail deck, similar to the Grafton Bridge in New South Wales, Australia. This bridge, in addition to Godavari Arch Bridge, has been widely used to represent Rajahmundry in arts, media, and culture. It is one of the recognised symbols of Rajahmundry.

The great godavari bridge and the legendary coromandel express


Geography

The road-cum-rail bridge is built across the Godavari River (largest river in South India at over 1,000 kilometres (620 mi) length) as it enters into the deltaic reach before debouching into the sea 60 kilometres (37 mi) downstream of the bridge, the second largest river in India. At the location of the bridge, near Rajahmundry, the river flows with a width of about 2.7 kilometres (1.7 mi), split in two channels with an island formation in between. The maximum discharge observed in the river is reported to be around 3 million m3/s and the maximum velocity of water flow as 5 metres (16 ft) per second

Construction

During the Third Five-Year plan doubling of railway track between Chennai-Howrah was planned. Most of the route had been doubled except the small stretch of track between Kovvur and Rajahmundry where a bridge had to be built to span the three kilometer long Godavari River. During 1964, the construction of second bridge across Godavari river at Rajahmundry was sanctioned as a part of doubling of track between Kovvur and Rajahmundry. But there had been a persistent demand from local population for construction of a road link between Kovvur and Rajahmundry, which would essentially link East Godavari and West Godavari districts. The Andhra Pradesh State Government came forward with the proposal to add a road deck over the rail bridge under construction as a part of doubling the railway track between Chennai-Howrah.

It was commissioned by South Central Railway division of Indian Railways. Construction of the bridge began in the early 1970s by Braithwaite, Burn & Jessop Construction Company, a group company of Bharat Bhari Udyog Nigam Limited. When completed it was Asia's longest rail -cum- road bridge.

It was inaugurated by the then President of India, Fakhruddin Ali Ahmed in 1974.

Old Godavari bridge

The Old Godavari Bridge or Havelock Bridge was built in 1900 by Mr.F.T.G.Walton, now decommissioned, this bridge has 56 spans and is 2754 m long. It was constructed with stone masonry and steel girders and certainly a marvel of British engineering. The New Godavari Bridge was made as a substitute for it.

Godavari arch bridge

Godavari Arch Bridge is the newest bridge constructed among the three. Constructed by the Hindustan Construction Company (HCC), this bridge is a modern day engineering feat. The bridge is made of bow string girder arches. The bridge is fit for 350 km/h rail services. The bridge was opened for rail traffic in 2003.