Puneet Varma (Editor)

German submarine U 129 (1941)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Name
  
U-129

Laid down
  
30 July 1940

Class and type
  
Type IXC submarine

Launched
  
28 February 1941

Draft
  
4.7 m

Ordered
  
7 August 1939

Commissioned
  
21 May 1941

Construction started
  
30 July 1940

Length
  
77 m

Beam
  
6.76 m

German submarine U-129 (1941) wwwwehrmachthistorycomimagesuboatstypeixc

Fate
  
Taken out of service at Lorient 4 July 1944; scuttled on 18 August, raised and broken up, 1946

Builders
  
Deutsche Schiff- und Maschinenbau, AG Weser

Part of
  

German submarine U-129 was a Type IXC U-boat of Nazi Germany's Kriegsmarine during World War II. She was laid down at the AG Weser yard, Bremen as yard number 992 on 30 July 1940, launched on 28 February 1941 and was commissioned on 21 May with Kapitänleutnant Nicolai Clausen in command.

Contents

Her service life began with training in the 4th U-boat Flotilla; she moved to the 2nd Flotilla for operations on 1 July 1941.

She sank 29 ships, a total of 143,748 gross register tons (GRT), on ten patrols.

Design

German Type IXC submarines were slightly larger than the original Type IXBs. U-129 had a displacement of 1,120 tonnes (1,100 long tons) when at the surface and 1,232 tonnes (1,213 long tons) while submerged. The U-boat had a total length of 76.76 m (251 ft 10 in), a pressure hull length of 58.75 m (192 ft 9 in), a beam of 6.76 m (22 ft 2 in), a height of 9.60 m (31 ft 6 in), and a draught of 4.70 m (15 ft 5 in). The submarine was powered by two MAN M 9 V 40/46 supercharged four-stroke, nine-cylinder diesel engines producing a total of 4,400 metric horsepower (3,240 kW; 4,340 shp) for use while surfaced, two Siemens-Schuckert 2 GU 345/34 double-acting electric motors producing a total of 1,000 metric horsepower (740 kW; 990 shp) for use while submerged. She had two shafts and two 1.92 m (6 ft) propellers. The boat was capable of operating at depths of up to 230 metres (750 ft).

The submarine had a maximum surface speed of 18.3 knots (33.9 km/h; 21.1 mph) and a maximum submerged speed of 7.3 knots (13.5 km/h; 8.4 mph). When submerged, the boat could operate for 63 nautical miles (117 km; 72 mi) at 4 knots (7.4 km/h; 4.6 mph); when surfaced, she could travel 13,450 nautical miles (24,910 km; 15,480 mi) at 10 knots (19 km/h; 12 mph). U-129 was fitted with six 53.3 cm (21 in) torpedo tubes (four fitted at the bow and two at the stern), 22 torpedoes, one 10.5 cm (4.13 in) SK C/32 naval gun, 180 rounds, and a 3.7 cm (1.5 in) as well as a 2 cm (0.79 in) anti-aircraft gun. The boat had a complement of forty-eight.

Service history

She made the short journey from Kiel, arriving in Horten Naval Base in Norway on 24 July 1941.

1st, 2nd and 3rd patrols

The boat's first patrol involved her departure from Horten, crossing the North Sea and entering the Atlantic Ocean by passing close to the Faroe Islands on the Icelandic side. She arrived at Lorient (where she would be based for most of her career), in occupied France on 30 August 1941.

Her second sortie saw her cross the Bay of Biscay to a point north of the Azores.

Her third patrol was further south, as far south as a similar latitude to Rio de Janeiro, but success continued to elude her.

4th patrol

Things improved dramatically when as part of Operation Drumbeat, she attacked Nordvangen on 20 February; this ship sank in one minute northeast of Trinidad. Staying in the West Indies / northern South America region, she sank another six vessels.

5th and 6th patrols

The submarine returned to her sunshine haunts; included in the toll was Hardwicke Grange, which was sunk with torpedoes and the deck gun north of Puerto Rico on 12 June 1942. She also sank Millinrocket on 17 June off La Isabela, Cuba and a ship from the Soviet Union, Tuapse, in the Gulf of Mexico on 4 July.

Her sixth patrol included the sinking of Trafalgar about 1,100 nmi (2,000 km; 1,300 mi) northeast of Guadeloupe on 16 October 1942 and West Kebar some 350 nmi (650 km; 400 mi) northeast of Barbados.

7th, 8th and 9th patrols

Patrol number seven saw ships such as the Melbourne Star and Panam consigned to the deep. On the return journey U129 was refuelling from the 'milk cow' supply submarine U-459 when two men were swept overboard. One was recovered fairly swiftly but the other could not be found. Her eighth patrol was west of the Canary Islands and produced no results.

U-129's ninth patrol was divided into two; she departed Lorient on 9 October 1943, but put into Saint-Nazaire on the 11th. A day later she headed for the US east coast, sinking Libertad on 4 December off North Carolina.

10th patrol

The boat began her last operation which at 111 days, was her longest, on 22 March 1944. Steaming south, she encountered Anadyr about 600 nmi (1,100 km; 690 mi) south southeast of Recife in Brazil and sank her.

Fate

The boat was taken out of service at Lorient 4 July 1944; she was scuttled on 18 August. She was raised and broken up in 1946.

References

German submarine U-129 (1941) Wikipedia


Similar Topics