Status
  
Operational

Type
  
Wind

Owner
  
Dominion Energy

Commission date
  
2008

Nameplate capacity
  
600 megawatts

Fowler Ridge Wind Farm httpsc1staticflickrcom760346332178766b626

Location
  
Fowler, Indiana, United States

Similar
  
Capricorn Ridge Wind Farm, Buffalo Gap Wind Farm, Panther Creek Wind Farm, Klondike Wind Farm, PeƱascal Wind Power Pr

Fowler ridge wind farm


The Fowler Ridge Wind Farm is a wind farm in Benton County, Indiana, near the city of Fowler, IN about 30 miles (48 km) northwest of Lafayette and 90 miles (140 km) northwest of Indianapolis. Fowler Ridge was originally developed in 2005 and 2006 by Orion Energy, LLC (Oakland, CA) and Vision Energy, LLC (Cincinnati, OH) and later sold in 2007 to BP and Dominion Resources. The project was constructed beginning in 2008 in two phases and has a nameplate capacity of 600 MW.

Contents

Fowler Ridge Wind Farm Fowler Ridge Wind Farm 4 Wind turbines at dusk Flickr

Fowler Ridge was the second utility-scale wind power plant in Indiana, after the 130.5 MW Goodland I Wind Farm (also in Benton County and was also developed by Orion Energy, LLC (Oakland, CA) and Vision Energy, LLC (Cincinnati, OH)). The Benton County Wind Farm came online in 2008. Some of the wind turbines are visible from US 52, the main highway through the County. They are also visible along US 41 in the Boswell area. Other wind farms developed by Orion and Vision include the Camp Grove Wind Farm and the Benton County Wind Farm.

Fowler Ridge Wind Farm USFWS Fowler Ridge Wind Facility HCP Summary

Fowler ridge wind farm at night


Phase one

Fowler Ridge Wind Farm Mendota Hills and Fowler Ridge Wind Farms PhotographyPanorama

The first phase of the project is online and consists of 222 wind turbines, 182 Vestas V82-1.65 MW turbines and 40 Clipper C-96 2.5 MW turbines, with a nameplate capacity of 400 MW.

Phase two

Fowler Ridge Wind Farm Pattern new Fowler Ridge IV owner Article Recharge

Phase two consists of 133 GE 1.5 MW wind turbines with a nameplate capacity of 200 MW. Construction began in early 2009 and phase two became operational in early 2010.

Fowler Ridge Wind Farm TOP PLANT Amazon Wind Farm Fowler Ridge Benton County Indiana