Puneet Varma (Editor)

Buffalo Gap Wind Farm

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Official name
  
Buffalo Gap Wind Farm

Nameplate capacity
  
524 MW

Country
  
United States

Owner
  
AES Corporation

Buffalo Gap Wind Farm wwwaltenergcommagazineissue11story1image2jpg

Location
  
20 miles (30 km) south west of Abilene, Texas

Similar
  
Panther Creek Wind Farm, Capricorn Ridge Wind Farm, Klondike Wind Farm, PeƱascal Wind Power Pr, Tehachapi Pass Wind Farm

Siemens wind energy buffalo gap wind farm abilene texas


The Buffalo Gap Wind Farm is located in Nolan and Taylor Counties, about 20 miles (30 km) south west of Abilene, Texas. It was constructed in three phases and has a total wind generation capacity of 524 megawatts (MW).

Buffalo Gap 1 consists of 67 Vestas V-80 wind turbines, each rated at 1.8 MW, for a total capacity of 120.6 MW. The wind farm was developed by SeaWest WindPower and is currently owned by AES Wind Generation. The power is sold to Direct Energy Texas under a 15-year power purchase agreement.

Buffalo Gap 2 is a 232.5 MW expansion consisting of 155 GE 1.5 MW Wind Turbines. The facility was developed by AES Wind Generation and went into commercial operation in June 2007. The power is sold to Direct Energy under a 10-year power purchase agreement.

Buffalo Gap 3 is a 170 MW addition, completed in September 2008, consisting of 74 Siemens 2.3 MW wind turbines.

References

Buffalo Gap Wind Farm Wikipedia