Supriya Ghosh (Editor)

Enoggera Dam

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
Australia

Status
  
Operational

Construction cost
  
₤71,000

Catchment area
  
33 km²

Create
  
Enoggera Reservoir

Location
  
South East Queensland

Opening date
  
1866

Height
  
24 m

Opened
  
1866

Construction began
  
1864

Enoggera Dam Enoggera Dam The Gap Must do Brisbane

Type of dam
  
Clay cored earthfill dam

Similar
  
Gold Creek Dam, Lake Manchester Dam, Enoggera Creek, Leslie Harrison Dam, Wappa Dam

Geocaching enoggera dam


The Enoggera Dam is a heritage-listed dam, which is located within the inner, western suburb of Enoggera Reservoir, in Brisbane, Queensland, Australia.

Contents

Enoggera dam water check sunny day aerial


History

Enoggera Dam Enoggera Dam The Gap Must do Brisbane

The dam was constructed in 1866. It was built on Enoggera Creek and was the first major dam built in Queensland (it was the second major dam built in Australia — the first major dam, Yan Yean Reservoir having been built in Victoria in 1850). It is rare as one of the few remaining examples in Queensland of an intact and functioning reservoir and treatment plant from this period in time. The clay cored earthfill dam was designed and built by Joseph Brady.

Enoggera Dam wwwseqwatercomausitesdefaultfilesdamimages

Water supply problems plagued Brisbane's early years. Soon after the Brisbane Municipal Council was established in 1860, a Water Supply Committee was formed. The earliest reservoir in Brisbane, which was located at the intersection of the present George Street and Roma Street, suffered from accumulation of dead animals and vegetable matter.

Site selection

Enoggera Dam Enoggera Reservoir The Gap Brisbane

Breakfast Creek was rejected by the Water Supply Committee because it was too close to the town. Thomas Oldham, an engineer who had worked on water supply to Melbourne, was employed to conduct a survey and solve Brisbane's problems.

One of Oldham's site recommendations on the Brisbane River near Dutton Park was dismissed because of its prohibitive costs. The other site Oldham suggested was selected because it was where Enoggera Creek left the range. The Surveyor-General, Augustus Gregory also suggested a site on Ithaca Creek. This location was abandoned because it had a small catchment size.

Enoggera Creek had a large catchment that rose higher in the D'Aguilar Range and had more smaller creeks flowing into it. The location was steep and heavily timbered. It took eighteen months and ten different contractors to just clear the site.

Construction

The Queensland Government didn't have confidence in the Council to supervise the dam's construction. After requesting revised plans and detailed cost estimates the Board of Waterworks was established to oversee the project.

Approval for the dam's construction was given in May 1864. Work began in August 1864 with water flowing by July 1866. A single cast-iron mains pipe, 8 inches (20 cm) in diameter, supplied the town of Brisbane. By 1869 the pipelines were extended to a total of eighteen kilometers, benefiting between five and six thousand people.

Three outlet pipes were incorporated into the design instead of the usual one or two. This allowed the potential supply to increase if needed as well as providing some safety benefits.

The original cost was ₤50,000, which was raised to ₤65,000. By the end of 1870 more than ₤71,000 had been spent and water supply for the rapidly growing city of Brisbane was not being met by strong demand. To solve the problem another dam, Gold Creek Dam was approved in 1881.

A commemorative drinking fountain in the City Botanic Gardens is dedicated to the arrival of clean drinking mains water to Brisbane.

Droughts and floods

Dry periods pronounced water quality problems in both Enoggera Dam and Gold Creek Dam built after the Enoggera reservoir was completed. The Mount Crosby Weir and pumping station alleviated some concerns but flooding of the Brisbane River was problematic. It was not until 1912 that water from Enoggera Dam was filtered.

A spillway was added in 1976. Seven metres was added to the height of the dam wall for flood mitigation in the same year.

It was decommissioned in 2003, then in early 2006 water from Enoggera Dam was again added to inner north-west Brisbane's drinking water supply, when drought had reduced South East Queensland's water supply to critical levels.

Current use

The dam was managed by the Brisbane City Council until July 2008, until it was transferred to Seqwater in a region-wide redistribution of water assets.

There are walking tracks in the area, and no permit is required. In March 2014, Seqwater released a recreation guide that allowed for water activities including swimming, canoeing, kayaking and fishing. Public access to the dam is via Walkabout Creek Wildlife Centre.

Heritage listing

The dam was listed on the Queensland Heritage Register in 2007.

References

Enoggera Dam Wikipedia