Puneet Varma (Editor)

Electricity Generating Authority of Thailand

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Type
  
State enterprise

Founded
  
1 May 1969

Industry
  
Electric power

Electricity Generating Authority of Thailand httpswwwegatcothenimagesaboutegatlogoe

Predecessor
  
Yanhee Electricity Authority (YEA), Lignite Authority (LA), North-East Electricity Authority (NEEA)

Key people
  
Mr Kornrasit Pakchotanon, Governor

Products
  
Electric power generation and transmission

Revenue
  
546,480 million baht (2015)

Headquarters
  
Bang Kruai District, Thailand

Profiles

The Electricity Generating Authority of Thailand (EGAT; Thai: การไฟฟ้าฝ่ายผลิตแห่งประเทศไทย) is a state enterprise, managed by the Ministry of Energy, responsible for electric power generation and transmission as well as bulk electric energy sales in Thailand. EGAT, established on 1 May 1969, is the largest power producer in Thailand, owning and operating power plants at 45 sites across the country with a total installed capacity of 15,548 MW.

Contents

EGAT's monopoly position in Thailand's electrical energy market has been challenged by critics as influential as a former energy minister and other government members are on the board. It has been criticised as inefficient and an impediment to the development of renewable energy sources.

Electricity generating authority of thailand corporate social responsibility


Operations

EGAT's power generation plants consist of three thermal power plants, six combined cycle power plants, 24 hydropower plants, eight renewable energy plants, and four diesel power plants. As of June 2016, EGAT's power plants provided 37 percent of Thailand's electricity. The remainder is provided by private producers and neighbouring countries. Gas-fired generation powers 67 percent of EGAT's total electricity generation while coal-fired power plants account for 20 percent. Most of EGAT's electricity is sold to the Metropolitan Electricity Authority (MEA), which supplies the Bangkok region, and the Provincial Electricity Authority (PEA), which supplies the rest of Thailand.

Observers have noted that in some Western countries, the state purchases renewable energy from producers first before purchasing non-renewable energy. If renewables fail to meet the country's energy demand, it is topped up using non-renewable energy sources. In Thailand, this policy is reversed.

As of May 2016, EGAT employed 22,955 persons.

Fossil fuel consumption

In the first half of 2016, EGAT imported 11 million tonnes of coal. Indonesia and Australia supplied 5.6 million tonnes of bituminous coal and 5.5 million tonnes of "other" coal. China and Russia supplied 47,395 tonnes of anthracite coal. EGAT produced 6.88 million tonnes of lignite from January–May 2016, mostly for use in its own power plants.

While EGAT pushes forward with plans for coal-fired generating plants, many countries are spurning coal or deferring its use:

  • China in 2016 announced the suspension of plans for 100 new coal plants, including plants under construction.
  • India's Electricity Central Electricity Authority has said that after coal-fired power plants under construction are completed, the country will need no new ones until 2027.
  • Thailand Power Development Plan 2015-2036 (PDP2025)

    Guiding EGAT's efforts is Thailand's Power Development Plan (PDP). The plan, prepared by the Ministry of Energy (MOE) and EGAT, is issued iteratively. The previous edition, PDP2010 Revision 3, covered the years 2012-2030.

    Along with the PDP, the MOE produces several subsidiary plans that roll up into the PDP:

  • Energy Efficiency Development Plan (EEDP)
  • Alternative Energy Development Plan (AEDP)
  • Natural Gas Supply Plan
  • Petroleum Management Plan
  • PDP2015 begins with the assumptions that:

  • Thailand's average GDP growth over the period 2014-2036 will be 3.94 percent annually
  • Thailand's population growth over the same period will average 0.03 percent annually
  • Energy savings over the period as forecasted in the EEDP will total 89,672 GWh
  • Renewables, including domestic hydro, will supply 19,634.4 MW of power over the period
  • Thailand's new power demands will grow 2.67 percent annually, 2014-2036
  • In 2036 Thailand's peak electricity demand will be 49,655 MW and that total electricity demand will be 326,119 GWh
  • PDP2015 projects the following changes in Thailand electrical power generation fuel mix over the period 2014-2036:

  • Imported hydro-power: Rising from 7 percent in 2014 to 15-20 percent in 2036
  • Coal/lignite: Flat to rising from 20 percent to 20-25 percent
  • Renewables, including domestic hydro: Rising from 8 percent to 15-20 percent
  • Natural gas: Declining from 64 percent to 30-40 percent
  • Nuclear: Rising from 0 percent to 0-5 percent
  • Diesel/fuel oil: Declining from 1 percent to zero
  • PDP2015 projects that Thailand's CO2 emissions from power generation will rise from 86,998,000 tons in 2015 to 104,075,000 tons in 2036.

    Plans and protests

    EGAT continues to press forward with plans to construct six new coal-fired power plants by 2025 in spite of institutions such as the World Bank halting funding for new coal projects except in "rare circumstances". Rachel Kyte, the World Bank climate change envoy, said continued use of coal was exacting a heavy cost on some of the world's poorest countries, in local health impacts as well as climate change, which is imposing even graver consequences on the developing world. "In general globally we need to wean ourselves off coal,...There is a huge social cost to coal and a huge social cost to fossil fuels...if you want to be able to breathe clean air." EGAT "...has—in TV commercials—ridiculed renewable energy as expensive and insufficient to deal with rising electricity demand."

    A persistent criticism of EGAT is that it has paid scant attention to the demand side of the energy equation. Rather than build more carbon-powered plants, working to reduce demand and use existing supplies more efficiently has taken a back seat to network expansion. Opportunities for big savings exist: on 29 March 2014, Thailand observed "Earth Hour." For one hour, superfluous lighting was turned off, resulting in a savings of 1,778 megawatts, the energy equivalent of a new power plant, and more than six million baht in power bills.

    EGAT's plans for future developments have been dogged by protests by local residents:

    Krabi power plant

    In mid-2015, government plans to build an 800 megawatt coal-fired electricity generating station (EGAT Coal-Fired TH #3) in Krabi Province have generated protests and hunger strikes by those opposed to the plant who say that it would endanger Krabi's relatively pristine environment. EGAT has pushed forward with development despite not having completed an environmental impact study. It intends to start the bidding process without an environmental assessment in order to "save time". The Krabi site is one of nine coal-fired plants planned for southern Thailand to be constructed over the next two decades to off-set the depletion of natural gas fields in the Gulf of Thailand. Opponents of the plan say their demands—which include a three-year waiting period to see if the province can produce 100 percent renewable energy—have been ignored.

    In August 2015, the prime minister ordered the formation of a commission composed of state agencies, EGAT, and citizen activists to find solutions to the power plant conflict. Gen Sakon Sajjanit was appointed committee chairman. It was agreed that the government put a hold on consideration of the Environmental Impact Assessment and Environmental Health Impact Assessments; that EGAT postpone bidding for the plant and the seaport; and that all parties allow Krabi to try to produce 100 percent renewable energy for three years with government support. EGAT broke the agreement as it proceeded with the bidding process, won by the Power Construction Corporation of China and Italian-Thai Development PCL. In November 2016, Prime Minister Prayut Chan-o-cha put the project "on-hold". According to the Bangkok Post, this is a move to "buy time".

    In early-2017, following a series of protests by those opposed to a coal-fired plant in Krabi, Prime Minister Prayut Chan-o-cha ordered that new environmental (EIA) and health impact assessments (EHIA) be conducted for the Krabi project. He directed that the public must be allowed to have its say. "A new power plant will certainly be built, but how? We have to take a look at what is good, safe and can deal with power shortages in order to ensure power security. There must be a balance between fossil fuels and recyclable energy," the prime minister said. The new assessments are expected to take at least two and a half years to complete, which means the Krabi power plant will be delayed to 2024 from its original schedule of 2019. EGAT officials insisted that a new power plant is still needed in south Thailand to meet the region's power demands, which increase by four to five percent annually.

    Songkhla power plant

    In Songkhla Province's Thepha District, a public hearing on EGAT's plans to build a coal-fired plant was ringed with razor wire to prevent opponents of the plan from gaining access to the hearing. The hearing, the third and final hearing on the Environment and Health Impact Assessment (EHIA) for the 2,400 megawatt plant, was policed by 400 soldiers, police, and volunteers. Some attendees admitted being transported to the hearing by local village leaders, who also provided them with gifts and food coupons. Songkhla Governor Thamrong Charoenkul chaired the hearing despite questions raised regarding his neutrality. He told the hearing that the project will benefit Thepa residents. "Since Egat has proposed the project, Thepha is now known nationwide. Shouldn't we be proud about that?" he said. Anuchart Palakawongse Na Ayudhya, director of EGAT's Project Environment Division, insisted EGAT's hearings were lawful. "We have organised the public review step by step according to the law," he said. Anuchart said EGAT did not bar anyone from expressing their opinions. "It's impossible to cancel the project. Most Thepha people support it," he said.

    Salween River projects

    Thailand's Power Development Plan, approved in May 2015 (PDP 2015), outlines the government's plans to import up to 10,000 MW of electricity from Myanmar over the next two decades. Much of this electricity is expected to come from planned hydro-power projects on the Salween River ("Thanlwin" in Myanmar). Thailand and Myanmar have signed an agreement for the Salween dams project, five dams on the Salween and another dam on the Tenasserim River. EGAT has been pushing forward two projects: the 1,360 MW Hatgyi dam in Kayin State and the 7,100 MW Mong Ton dam in Shan State (formerly known as the Tasang dam).The Mong Ton dam, in central Shan State, would span the Salween and Pang rivers, covering an area the size of Singapore.

    Litigation

    EGAT has been the target of several lawsuits brought by neighbours of several of its operations. The best known legal challenge took place in Mae Mo. Mae Mo is the site of a 2,400 MW lignite-fueled power plant run by EGAT. Coal-fired power plants such as Mae Mo can release up to 150 million tonnes of CO2 over their design life of 20–25 years, according to Greenpeace-Thailand. The plant has been the target of a series of lawsuits brought by locals who claim that the lignite mining operation and the burning of lignite fuel by EGAT has negatively impacted the environment and the health of those living in the vicinity. A 12-year fight by villagers for compensation for damages ended in victory for the plaintiffs in February 2015. The Supreme Administrative Court in Chiang Mai Province upheld a ruling by the Chiang Mai Administrative Court in 2005. The court handed down a verdict ordering EGAT to pay compensation to 131 plaintiffs, some of them deceased. Plant victims were awarded between 20,000-240,000 baht each, commensurate with their suffering. The total amounts to 25 million baht plus 7.5 percent interest.

    Several days earlier, the court had ordered EGAT to return its Mae Mo golf course, adjacent to the open pit lignite mine, to woodland in order to help clean up the air pollution caused by EGAT's Mae Mo operations.

    References

    Electricity Generating Authority of Thailand Wikipedia