Trisha Shetty (Editor)

Eastern Goldfields Railway

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Operator(s)
  
Brookfield Rail

Line length
  
373,000 m

Old gauge
  
3 ft 6 in (1,067 mm)

Eastern Goldfields Railway httpsuploadwikimediaorgwikipediacommonsthu

1 July 1894: opened Northam to Southern Cross
  
1 July 1896: opened Southern Cross to Boorabbin 1 January 1897: opened Boorabbin to Kalgoorlie February 1966: Bellevue to Northam added gauge and changed route 1968: Northam to Kalgoorlie, added standard gauge, making it dual gauge and changed route

Track gauge
  
1,435 mm (4 ft 8 ⁄2 in) standard gauge 1,067 mm (3 ft 6 in) dual gauge

Owner
  
Public Transport Authority

Terminis
  
Kalgoorlie railway station, Northam railway station, Western Australia

The Eastern Goldfields Railway was built in the 1890s by the Western Australian Government Railways to connect Perth with the Eastern Goldfields at Coolgardie and Kalgoorlie.

Contents

History

The Eastern Railway opened in stages from Perth to Northam in the 1890s, and the Eastern Goldfields Railway extended this line through semi-desert to the Eastern Goldfields.

It opened in stages between 1894 and 1897.

  • Northam to Southern Cross: 175 miles 14 chains (281.9 km) (opened 1 July 1894)
  • Southern Cross to Boorabbin: 60 miles 55 chains (97.7 km) (opened 1 July 1896)
  • Boorabbin to Kalgoorlie: 78 miles 14 chains (125.8 km) (opened 1 January 1897)
  • The Goldfields Water Supply Scheme pipeline was later constructed along the railway line. The chief engineer for both the railway and the pipeline was C. Y. O'Connor.

    In October 1917, the Commonwealth Railways' standard gauge Trans-Australian Railway from Port Augusta was completed through to Kalgoorlie, making it a break-of-gauge station.

    Branches

    At Kalgoorle lines branch off north to Malcolm and Leonora; and south to Esperance via the Esperance line. The Malcolm-Laverton branch was last used in 1957 and closed in 1960.

    Gauge conversion

    As part of the Federal Government's program to build a standard gauge line across Australia, and the passing of the Railways (Standard Gauge) Construction Act 1961 work commenced on gauge converting the line to dual gauge with a new alignment further north of the existing line built between Southern Cross and Kalgoorlie.

    The new alignment, as well as being shorter and more favourably graded, provided access for the iron ore deposits at Koolyanobbing, which were shipped by rail to Kwinana, near Perth, to supply Australian Iron and Steel's blast furnace.

    The first official standard gauge iron ore train from Koolyanobbing arrived at Kwinana on 10 July 1967. On 3 August 1968 the Koolyanobbing-Kalgoorlie section opened for freight trains and on 4 November 1968 the first through freight train from Port Pirie arrived in Perth.

    Upgrades

    In November 2005, funding was announced to extend eight crossing loops to accommodate 1,800 metre long trains at Bodallin, Darrine, Wallaroo, Lake Julia, Grass Valley, Bungulla, Booraan and Seabrook, and replace the final 76 kilometres of timber sleepers with concrete sleepers.

    Services

    Transwa's MerredinLink and Prospector services from Perth to Merredin and Kalgoorlie traverse the line as does Great Southern Rail's Indian Pacific to Sydney. Other named trains to previously use the line were The Westland, The Kalgoorlie and the Trans-Australian.

    Intrastate and interstate freight services are operated by Aurizon, Mineral Resources, Pacific National and SCT Logistics. CBH Group operate grain trains.

    References

    Eastern Goldfields Railway Wikipedia