Davidson County Solar Farm

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
United States

Status
  
Operational

Type
  
Flat-panel PV

Units operational
  
63000

Location
  
Davidson County

Commission date
  
December 2010

Site area
  
200 acres

Davidson County Solar Farm

Similar
  
Alamosa Solar Generatin, Catalina Solar Project, DeSoto Next Generatio, California Flats Solar Project, Silver State South Solar Proj

The Davidson County Solar Farm is a 17.2 megawatt solar power station located in the heart of North Carolina, near the community of Linwood. SunEdison built the array of photovoltaic panels, and Duke Energy buys all the output from the solar farm. The solar farm is located on North Carolina Highway 47, off New Jersey Church Road.

Contents

Economics

In mid-May 2008, the Davidson County Board of Commissioners agreed to subsidize the project. This included $1.8 million to go into land grading and multiple cash payments beginning in July 2009, and going through 2011. Another $127 million was raised from investors. The solar farm created 80 jobs during construction, and three jobs in order to maintain the power facility. In addition, SunEdison will receive an annual refund of certain taxes pertaining to their various constructions due to modified legislation to include solar energy projects. SunEdison had been looking at an almost ten times larger 2,400-acre (970 ha) piece of land off of Interstate 85 near Lexington, but the owner declined to sell the property. However the company had already spent $134,000 researching to see if that site would work.

Efficiency

One of the driving forces behind the construction of this solar farm, and SunEdison's presence in North Carolina altogether, is due to a state law passed in 2007 that requires public utilities such as Duke Energy to obtain a minimum of 12.5% of their power from renewable energy by 2021. The farm has a rating of 21.5 megawatts, which translates to 18 megawatts of peak AC power. Every year that the solar farm is in use, it will offset 32 million pounds of carbon dioxide. SunEdison claims that once complete, the power plant will generate enough energy to power more than 2,600 homes. The site uses GPS software to track the sun.