Country
  
Australia

Status
  
Operational

Type of dam
  
Embankment dam

Catchment area
  
159 km²

Operator
  
Toowoomba Region

Purpose
  
Potable water supply

Opening date
  
1942 (1942)

Surface elevation
  
482 m

Mean depth
  
12 m

Construction began
  
1938

Cooby Dam Cooby Dam Toowoomba Qld Sweetwater Fishing Australia

Similar
  
Leslie Dam, Boondooma Dam, Mount Crosby Weir, Wuruma Dam, Maroon Dam

Cooby dam yellowbelly


The Cooby Dam is a rock–fill embankment dam with an un–gated spillway across the Cooby Creek, a tributary of Condamine River, at Groomsville in the Darling Downs region of Queensland, Australia. The main purpose of the dam is for potable water supply of the Toowoomba region. The impounded reservoir is called the Cooby Creek Reservoir.

Contents

Cooby Dam Cooby Dam set to reopen Chronicle

Cooby dam


Location and featuresEdit

Cooby Dam Woomba Woomba Cooby Dam

The dam is located approximately 17 kilometres (11 mi) north of Toowoomba. The other two storages used for Toowoomba are Perseverance Dam and Cressbrook Dam.

Cooby Dam Cooby Dam sails into new era three years after floods Chronicle

Completed in 1942 the rock–fill dam structure is 30 metres (98 ft) high and 207 metres (679 ft) long. The 71-thousand-cubic-metre (2.5×10^6 cu ft) dam wall holds back the 23,092-megalitre (5.080×10^9 imp gal; 6.100×10^9 US gal) reservoir when at full capacity. From a catchment area of 169 square kilometres (65 sq mi), the dam creates an unnamed reservoir, with a surface area of 301 hectares (740 acres) at a maximum depth of 12.5 metres (41 ft) when at full capacity. The uncontrolled un-gated spillway has a discharge capacity of 680 cubic metres per second (24,000 cu ft/s). The dam is managed by the Toowoomba Region Council.

Cooby Dam's lowest usable storage volume was recorded at 8% in January 2010.

Cooby Dam Meringandan Cooby Dam Loveday Cove

In July 2006, public outcry and a referendum with winning "No" vote rejected plans to place recycled water into Cooby Dam. In 2007, the idea was again resurrected when plans for an advanced water treatment plant to be built near Cooby Dam by the Toowoomba City Council were suggested. The trial would test the re-use of recycled water into Toowoomba's drinking water supply. In 2008, an emergency bore was used to extract water from the Great Artesian Basin to supplement water supplies for the dam as drought conditions reduced supply to critical levels.

Recreational activitiesEdit

A stocked impoundment permit is required to fish in the dam.