The Connaught Tunnel is a railway tunnel under the Selkirk Mountains in southeastern British Columbia, Canada, near the city of Revelstoke. The 5.022-mile (8.082 km) tunnel carries the Canadian Pacific Railway main line under Mount Macdonald and replaced the railway's previous routing over Rogers Pass, which had been struck by several deadly avalanches since its completion in 1885. At the time it was built, the Connaught Tunnel was the longest railway tunnel in North America. It was named for the Governor General of Canada–the Prince Arthur, Duke of Connaught–who in turn was named after the province of Connaught in Ireland.

Contents

Connaught Tunnel The Connaught Tunnel then and now IanVisits London News and

Announced in February 1913, the contract was awarded on July 1, 1913, to Foley Bros. Welch and Stewart. The tunnel was designed by John G. Sullivan who joined the Canadian Pacific Railway in 1900 and eventually became Chief Engineer for Canada. A small tunnel was built, from which cross cuts were made to the main tunnel so work could carry on at a number of headings. The sub-contractor guaranteed to drill 900 feet (270 m) of tunnel per month and started on April 2, 1914. Compressed air equipment and narrow gauge locomotives were used inside the tunnel. The company town housed some 300 workers. The tunnel was completed before the original deadline, with operation beginning December 16, 1916. It had a grade of only 0.95 per cent westward, and was tangent; light at one end can be seen at the other, more than five miles away.

Connaught Tunnel Breathing new life into the Connaught Tunnel Crossrail

It cost $5.5 million, while a further $3 million were spent on track revision, which saw 14.5 miles (23.3 km) abandoned including the Loops and over 4 miles (6.4 km) of snow sheds. In all, the route was shortened by 4.3 miles (6.9 km).

Connaught Tunnel Connaught Tunnel Crossrail Works Construction Etc

Problems were encountered with ventilation, loose rocks and wet rails, which caused trains to stall. The tunnel was later lined with reinforced concrete and equipped with a better ventilation system. Originally double tracked, it was realigned with a single track in 1959 to accommodate higher freight cars.

Connaught Tunnel Restoration of derelict Victorian rail tunnel complete Crossrail

In the late 1980s, the Mount Macdonald Tunnel was built to supplement the Connaught Tunnel and to lessen the grade on the eastern approach to the pass. Trains now predominantly travel east through the Connaught Tunnel and west through the Mount Macdonald Tunnel.

Connaught Tunnel Breathing new life into the Connaught Tunnel Crossrail

In 2001, the Connaught Tunnel was inducted into the North America Railway Hall of Fame. The Hall of Fame recognizes and establishes an enduring tribute to the people and things that have made significant contribution relating to railway industry in North America. The Connaught Tunnel was inducted in the "Facilities and Structures" category with "National" significance.