Girish Mahajan (Editor)

Colorado Big Thompson Project

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit

Similar
  
Shadow Mountain Dam, Horsetooth Reservoir, Granby Dam, Lake Granby, Grand River Ditch

The Colorado-Big Thompson Project (abbreviated C-BT) is a federal water diversion project in Colorado designed to collect West Slope mountain water from the headwaters of the Colorado River and divert it to Colorado's Front Range and plains. In Colorado, approximately 80% of the state's precipitation falls on the West Slope, in the Rocky Mountains, while around 80% of the state's growing population lives along the East Slope, between the cities of Fort Collins and Pueblo.

Contents

Ten reservoirs, about 18 dams and dikes, the Alva B. Adams Tunnel under the Continental Divide, as well as six power plants, make up the project. The C-BT is owned and primarily managed by the U.S. Bureau of Reclamation's Eastern Colorado Area Office under its Great Plains Region.

Colorado-Big Thompson Project The Glaciation of Grand Lake

History

Colorado-Big Thompson Project ColoradoBig Thompson Project Coyote Gulch Page 2

The project was built, is owned, and is primarily operated by the federal Bureau of Reclamation under the Department of the Interior. By the late 1890s, farmers in northeastern Colorado realized water rights in the area had become over-appropriated. In order to survive the agricultural season, additional water supplies would be needed. Prior to the Dust Bowl era, agriculture in this section of the state had relied upon sources such as Boulder Creek, St. Vrain Creek, Little Thompson River, Big Thompson River and the Cache La Poudre River, all of which are a part of the South Platte River basin and flow into the South Platte River before the South Platte reaches Greeley, Colorado. In search of a solution, farmers and their representatives approached the Bureau of Reclamation. In the late 1930s a solution was found: divert the water via a 13.2-mile (21.2 km)-long tunnel under the Continental Divide and Rocky Mountain National Park. (Tunnel West Portal 40°14′28.16″N 105°48′07.36″W, Tunnel East Portal 40°19′39.85″N 105°34′46.34″W)

Colorado-Big Thompson Project Archived Photographs

The proposed water diversion was extensive and the project could not have been constructed without compensation to the West Slope for the water sent East. As a result, the first feature built on the C-BT was Green Mountain Dam and Reservoir, a West Slope facility designed to provide for future water demands in the state's Upper Colorado River Basin. The project was authorized by President Franklin Delano Roosevelt in 1937. Construction began on Green Mountain in the northern part of Summit County in 1938. Construction on the project continued through most of the next 20 years.

Benefits

Colorado-Big Thompson Project ColoradoBig Thompson Project Articles Colorado Encyclopedia

While the project was originally built for agricultural purposes, it serves multiple demands including municipal and industrial supply, hydro-power generation, recreation, and fish and wildlife. In recent years, however, water supply demands have shifted making municipal and industrial supply the main water beneficiary, rather than irrigation.

Colorado-Big Thompson Project Colorado BigThompson West Slope Collection System Information

Today, the "C-BT" serves over 33 cities and towns in northeastern Colorado, including Fort Collins, Greeley, Loveland, Estes Park, Boulder, and Sterling, encompassed by 7 counties, providing a secondary source of water for around 830,000 people and an irrigated area of 650,000 acres (2,500 km²). Although water rights allow for up to 310,000 acre feet (380,000,000 m3) of water a year to be diverted, annual diversions average around 220,000 acre feet (270,000,000 m3), instead. A drop of over 2000 vertical feet from the Rockies down to the plains allows for power generation. Six power plants on the project produce an average supply of 759 million kilowatt hours of electricity a year. Like the water supply, generated electricity is supplemental. Electricity produced on the C-BT is a source of "peaking power" and is marketed by the Department of Energy via its Western Area Power Administration.

West Slope collection system

Colorado-Big Thompson Project ColoradoBig Thompson Project update 400 cfs in the Big Thompson

An extensive series of reservoirs, pumps and conduits on the west side of the Rockies serve to collect water from the headwaters of the Colorado River, as well as two tributaries, Cottonwood Creek and the Fraser River. Lake Granby, located in eastern Grand County, is the primary C-BT storage facility, with a capacity of 539,800 acre feet (0.6658 km3). The reservoir is held by the 298-foot (91 m) high Granby Dam and 12,722 feet (3,878 m) of auxiliary dikes.

Colorado-Big Thompson Project Bureau of Reclamation Advertises Penstock Painting Bid Paint

Willow Creek Reservoir is built on Willow Creek, which is located west of Lake Granby, and provides a source from which water is diverted and pumped to Granby. Windy Gap Reservoir is a small diversion facility located directly below the confluence of the Colorado and Fraser rivers, about 5 miles (8.0 km) downstream of Granby. Water from the Fraser River, as well as other inflows to the Colorado below Granby Dam, is diverted here and pumped eastwards to Lake Granby. The Windy Gap project is not owned by the Bureau of Reclamation, but by the Northern Water Municipal District, a consortium of six Front Range cities. However, Windy Gap water uses the storage and distribution facilities of the Bureau of Reclamation's C-BT.

Colorado-Big Thompson Project The Ditch Project 150 years of ditches Boulder39s Constructed

From Lake Granby the water is lifted 125 feet (38 m) up to Shadow Mountain Lake, which is located on the Colorado River west of the natural Grand Lake. The two bodies of water are connected by a short channel which allows water to flow freely to the intake of the Alva B. Adams Tunnel on Grand Lake's eastern shore. The water then flows 13.2 miles (21.2 km) under the Continental Divide through the Adams Tunnel, which can carry up to 550 cubic feet per second (16 m3/s) to the Eastern Slope.

East Slope hydroelectric system

Once the water emerges from the Adams Tunnel just southwest of Estes Park, the system is almost entirely gravity powered, dropping some 2,800 feet (850 m) as it descends to the foothills of the Rocky Mountains west of Loveland. The tunnel outlet is located at East Portal Reservoir, a small regulating pool on the Wind River. From here it is transported via an inverted siphon across the Aspen Creek valley and drops 205 feet (62 m) to Marys Lake, where it drives the 8.1 megawatt (MW) Marys Lake Powerplant. Marys Lake is a small natural lake enlarged to form a second regulatory reservoir. The water then drops 515 feet (157 m) to the 45-MW Estes Powerplant at Lake Estes, which is formed by Olympus Dam on the Big Thompson River at Estes Park. Lake Estes serves to regulate both C-BT water and the natural flows of the Big Thompson River.

From Lake Estes the water travels east via the Olympus and Pole Hill Tunnels to the 38.2 MW Pole Hill Powerplant, where it drops 825 feet (251 m), and flows via the shorter Rattlesnake Tunnel to Pinewood Lake. The water then enters the Bald Mountain Tunnel, heading east to a final drop of 1,055 feet (322 m) at 94.5 MW Flatiron Powerplant. From the tailrace of the powerplant the water enters Flatiron Reservoir from which the water is distributed to the East Slope.

Foothill distribution facilities

Once the water reaches Flatiron Reservoir, it splits into two branches which distribute water to about 50 miles (80 km) of the Front Range Corridor, from Fort Collins to near Denver. The northern branch consists of the Horsetooth Supply Canal and tunnels which deliver water by gravity to Horsetooth Reservoir. The reservoir is formed by four dams in the hills west of Fort Collins and has a total capacity of 151,750 acre feet (0.18718 km3). The northern end of the reservoir outlets into the Charles Hansen Feeder Canal, which mainly supplies agriculture in the Cache la Poudre River valley. There is a smaller outlet at Soldier Canyon which provides water to the Fort Collins area.

Water flowing into the southern branch must be pumped into Carter Lake Reservoir, located west of Berthoud. The reservoir can hold up to 112,230 acre feet (0.13843 km3) of water. During times of peak power demand, water can be released back from Carter into Flatiron via a pump-generating unit. Water flows south from Carter Lake into the St. Vrain Supply Canal, which provides water to the Little Thompson River and Saint Vrain Creek. From the end of the St. Vrain Canal the Boulder Creek Supply Canal extends southward to Boulder Creek, and the South Platte Supply Canal extends northeast from there to the South Platte River.

References

Colorado-Big Thompson Project Wikipedia