Carrapatelo Dam

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
Portugal

Opening date
  
1972

Operator
  
Energias de Portugal

Impound
  
Douro

Status
  
Operational

Surface area
  
9.52 km²

Construction began
  
1964

Carrapatelo Dam httpsiytimgcomvi1xvCYKXp9chqdefaultjpg

Official name
  
Barragem do Carrapatelo

Location
  
municipality Marco de Canaveses, Porto District

Owner(s)
  
Companhia Portuguesa de Produção de Electricidade

Similar
  
Douro, Crestuma‑Lever Dam, Valeira Dam, Régua Dam, Pocinho Dam

Douro river cruise carrapatelo dam 2


Carrapatelo Dam (Portuguese: Barragem do Carrapatelo) is a concrete gravity dam on the Douro, where the river forms the border line between the districts of Porto and Viseu. It is located in the municipality Marco de Canaveses, in Porto District, Portugal.

Contents

Construction of the dam began in 1964. The dam was completed in 1972. It is owned by Companhia Portuguesa de Produção de Electricidade (CPPE).

Douro river cruise carrapatelo dam 1


DamEdit

Carrapatelo Dam is a 57 m tall (height above foundation) and 400 m long gravity dam with a crest altitude of 55 m. The volume of the dam is 190,000 m³. The spillway is part of the dam body (maximum discharge 22,000 m³/s). There is also a bottom outlet.

ReservoirEdit

At full reservoir level of 46.5 m the reservoir of the dam has a surface area of 9.52 km² and its total capacity is 148.4 mio. m³. The active capacity is 9 (15,6 or 16) mio. m³.

Power plantEdit

The run-of-the-river hydroelectric power plant went operational in 1971. It is owned by CPPE, but operated by EDP. The plant has a nameplate capacity of 201 (180) MW. Its average annual generation is 806.1 (783, 870.6 or 882) GWh.

The power station contains 3 Kaplan turbine-generators with 63.4 MW each in a dam powerhouse. The turbine rotation is 115.4 rpm. The minimum hydraulic head is 20 m, the maximum 37 m. Maximum flow per turbine is 290 m³/s.

The first 2 machines went operational in 1971, the third in 1972. The turbines were provided by Kværner, the generators by Brown, Boveri & Cie.

LockEdit

On the right side of the dam is a lock, which can handle ships with the following maximum properties: 83 m in length, 11.40 m on the beam, 3.8 m load-draught and a cargo capacity of 2500 tons.