California State Route 905

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Counties:
  
San Diego

Length
  
14.43 km

California State Route 905

Existed:
  
1986 (from SR 117) – present

West end:
  
Oro Vista Road / Tocayo Avenue in San Diego

East end:
  
Fed. 2 at Mexican border near Otay Mesa

County
  
San Diego County, California

State Route 905 (SR 905) is a state highway in San Diego, California, that connects Interstate 5 (I-5) and Interstate 805 in San Ysidro to the United States – Mexico border at Otay Mesa. The entire highway from I-5 to the international border is a freeway with a few exits that continues east from the I-805 interchange before turning southeast and reaching the border.

Contents

Map of CA-905, San Diego, CA, USA

SR 905 was formerly routed on Otay Mesa Road, which had been in existence since at least 1927. Before it was SR 905, the route was first designated as part of SR 75, before it was redesignated as SR 117. The freeway was completed between I-5 and Otay Mesa Road in 1976. The border crossing opened in 1985 after several delays in obtaining funding for the construction of what would become SR 905. After becoming SR 905 in 1986, the highway was converted to first an expressway in 2000 and then a freeway in 2010 and 2011. Plans are for this highway to eventually become known as Interstate 905.

Route description

SR 905 begins at the intersection of Tocayo Avenue and Oro Vista Road in Nestor. It begins as a freeway, intersecting with I-5 at a partial cloverleaf interchange. After interchanges with Beyer Boulevard and Picador Boulevard, the freeway then intersects I-805. Following this, SR 905 veers southeast to parallel Otay Mesa Road, with interchanges at Caliente Avenue (in Pacific Gateway Park), Britannia Boulevard, and La Media Road. The route interchanges with the SR 11 freeway, which is planned to be a toll facility that will serve a new border crossing east of Otay Mesa. Immediately after, SR 905 turns south to its final interchange at Siempre Viva Road before the route ends at the Otay Mesa Port of Entry, which truck traffic must use to cross the border.

SR 905 is part of the California Freeway and Expressway System and part of the National Highway System. In 2013, SR 905 had an annual average daily traffic (AADT) of 58,000 between Beyer Boulevard and I-805, and 18,400 around the I-5 junction, the former of which was the highest AADT for the freeway.

History

What was known as the "Otay Mesa road" existed as a dirt road by 1927. A paved road connected San Ysidro to Brown Field and the easternmost ranches in the Otay Mesa area by 1935. Discussions were held between San Diego County and National City over the maintenance of the road in 1950, since it was used by trucks travelling to the landfill. The majority of SR 905, running in parallel with Otay Mesa Road from Interstate 5 to SR 125, was added to the state highway system and the California Freeway and Expressway System in 1959 as Legislative Route 281, and became part of SR 75 in the 1964 renumbering.

Planning was underway for the extension of SR 75 east to the then-proposed SR 125 by 1963. The California Highway Commission endorsed the routing for SR 75 in 1965 along Otay Mesa Road, away from future residential developments. There were plans as early as 1970 to have a highway heading southwest to a new border crossing that would bypass the Tijuana area. The next year, James Moe, the state public works director, subsequently asked the California State Legislature to lengthen SR 75 to connect to this new crossing, rather than using I-5 to make the connection.

Following this, in 1972, the legislature added a new SR 117, which extended this part of SR 75 southwest to the Mexican border near Border Field State Park, to the state highway system, and a southerly extension of SR 125 to the border at Otay Mesa to the state highway and Freeway and Expressway systems. Two years later, planning began for the construction of the Otay Mesa crossing and the construction of SR 75 to connect it to I-5 and I-805. Later, the Comprehensive Planning Organization (CPO), the local association of municipal governments, recommended using $4 million of federal funding for the construction of SR 75. The CPO later endorsed expediting construction of the freeway before completion of the border crossing, so that the freeway would primarily serve border traffic, thus preventing land speculation in Otay Mesa. While Mexican authorities wanted the crossing constructed in 1975, the CPO indicated that the funding for SR 75 would not be available until at least 1980, or even 1985. Following this, Representative Lionel Van Deerlin attempted to accelerate the construction of the crossing, even though there was no funding for the highway.

Construction began on the southern portion of SR 75 in mid-1974. In January 1976, the part of SR 75 between I-805 and Otay Mesa Road was opened to traffic. On April 6, the next portion of the freeway opened. However, there were concerns about what to call the freeway, citing confusion with the northern portion of SR 75. The entire cost of the project was $6.3 million. SR 117 was extended east to SR 125, replacing the southerly segment of SR 75, by the Legislature in 1976; this took effect at the beginning of 1977. Estimates for completing the freeway ran from $13.8 million to $28.5 million.

In late 1977, the CPO made plans to push for adding SR 117 to the Interstate Highway System, to obtain additional federal funding. By 1979, both San Diego city and county had allocated $6 million to construct a temporary way to access the border crossing along Otay Mesa and Harvest Roads. Two years later, the City of San Diego indicated that the upgrade of Otay Mesa Road to a four-lane road would be the preferred option; the state agreed to allocate $2 million towards the $10 million project, with the city contributing $6.4 million and the county adding $2.3 million. The Federal Highway Administration approved the continuous roadway via SR 117 and SR 125 from I-5 to the border at Otay Mesa as a non-chargeable (not eligible for federal Interstate Highway construction dollars) part of the Interstate Highway System in October 1984. The Otay Mesa border crossing opened on January 24, 1985. The route number was legislatively changed to 905 in 1986, and signs were updated in 1988. This change was to apply for other federal funding. The original piece of SR 117, west of I-5, also became SR 905 with the rest of SR 117, but Caltrans has not constructed it.

Efforts were underway in 1997 to secure federal funding for the highway and other infrastructure near the Mexican border, largely supported by Senator Barbara Boxer and Representative Bob Filner, and Representative Bud Schuster, the chairman of the House Transportation and Infrastructure Committee, visited the region before giving informal approval to the proposal. In 1999, Governor Gray Davis approved allocating $27 million in federal funding to complete the freeway. Concerns were expressed by local residents and municipal officials regarding the apparent priority of SR 125 over SR 905 in terms of funding, especially since SR 125 was to be constructed as a toll road, and SR 905 would compete with the toll road enterprise. In May 1998, Congress approved $54 million in funding for the completion of SR 905.

Otay Mesa Road was widened to six lanes in 2000, at a cost of $20.5 million. Before, it had 50 percent more traffic than it was designed to handle; it was considered by the San Diego Union-Tribune as "California's busiest trade route with Mexico", and traffic had increased by a factor of ten, with the number of people dying in traffic accidents approaching five times the state average. The widening of Otay Mesa Road was considered a temporary fix for the problem. The next year, the California Transportation Commission allocated $25 million of state funding towards completing the freeway. The interchange with Siempre Viva Road opened on December 8, 2004. Delays in the U.S. Congress approving federal funding in 2005 resulted in a delayed start to construction for the rest of SR 905.

Construction began on the part of SR 905 between Britannia Boulevard and Siempre Viva Road in April 2008, and from Brittania Boulevard to I-805 in July 2009. Efforts were made to keep construction going despite a shortfall in funding from state bonds in 2009. The part between Britannia Boulevard and Siempre Viva Road opened in December 2010. The interchange with I-805 began to be upgraded in April 2011, and the construction, which used $20 million in federal funding, finished in February 2012. The final freeway segment of SR 905 between I-805 and Britannia Boulevard opened on July 30, 2012. The entire cost of the project connecting I-805 to the border crossing was $441 million.

Future

Plans are for SR 905 to become Interstate 905; however, it could not be constructed with the same funds that were used for constructing the rest of the Interstate Highway System. Previously, SR 905 had a direct connection with SR 125 via two at-grade intersections on Otay Mesa Road. With the completion of the newest freeway segment of SR 905 and the freeway-to-freeway connection to SR 125 unconstructed, traffic on SR 905 must exit at La Media Road (exit 7), head north on La Media and head east on Otay Mesa Road to make the connection. A freeway-to-freeway interchange is planned for the connection between SR 125 and SR 905, and an additional interchange is planned for Heritage Road. Ramps from SR 11 westbound and eastbound to SR 125 northbound were completed on November 30, 2016, at a cost of over $21 million.

Exit list

Except where prefixed with a letter, postmiles were measured on the road as it was when the route was established, based on the unconstructed western end at the Mexican border and the rest of the alignment that existed at the time, and do not necessarily reflect current mileage. R reflects a realignment in the route since then, M indicates a second realignment, L refers an overlap due to a correction or change, and T indicates postmiles classified as temporary (for a full list of prefixes, see the list of postmile definitions). Segments that remain unconstructed or have been relinquished to local control may be omitted. The entire route is in San Diego, San Diego County.

References

California State Route 905 Wikipedia